Loading...
HomeMy WebLinkAboutSite Certifications - 12/18/1996December 5, 1996 Project No. 1490-01-95 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 STORMWATER RECEIVED DEC 0 99¢ l", bb V\ Re: Jot 2,,. Wion_S rt eet--P.U.D.;- Ft. Collins, Colorado Dear Basil, This letter serves as final certification for all Phase 1 project drainage improvements for Lot 2, Mason Street P.U.D. (Raynor Garage Door). Record drawings have been prepared and are included with this certification. Spot elevations have been provided on a separate print of the Master Grading Plan for the entire site including the detention pond. Shear Engineering Corporation has made periodic observations during construction and has reviewed the field data represented with the record drawings. Based on our observations during construction and our review of the record drawings, Shear Engineering Corporation states that all drainage improvements have been completed in substantial conformance with the approved plans for Lot 2, Mason Street P.U.D. which were prepared by Shear Engineering Corporation. All drainage facilities are functioning appropriately and meet the intent of the drainage design for Lot 2, Mason Street P.U.D. If you have any questions concerning our observations during construction or this drainage certification, please call at (970) 226-5334. "repoo , ®rg Brian W. Shear, P.70-.' Shear Engineering Corporation BW S / mb attachments cc: Jim Brown; Brown Construction Peter Long; Substantial Corporation 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311 CREGER PLAZA SECOND REPLAT SWE: 1'=B0 LOT 7 I t (SOUTH FORT COLLINS VET. CLINIC) I �� II A i �Or, WTI.) llj I I, GI li I i i '� , / 1 1'11 E3m. oERmnN Pon It i I i l I �y I , --So-- 1 1 I I xo. EiEv-v.o l j r / % 3aL xEro-„ �, :ill 3aL w C.F. \\\\'kt'� U.E� (rm>) Ml.3tt0 PoPGO L _ - _ ln• V.E._GnLi__ / /._ _a`�.; �; "-= 1-``T-aid' I _ _ - - r S 69'5545 E 1221 ----- �' I I i II. I I is.. .:_•B vn Dam B�°pf", am+ _xM I C.., I j ;ill _CAPE. I �} iE•i l PROPOSED NEW BUILDING or ePool I W I All Q Ii I /� S3u ,.�. v.R I1 I 0 D TI / A ,N I z l w s ran .00 It �P,131 p7o:wo0. ,3„ 0 LOT 2 N —.1'J� 1® o 4 AN, _,,. - A-Aw3ar—� on"II � I 33z3 ,� II of O 1 ICI u. 1 o I i I1%I ' i I I i ts1s3 �3M33 0 ,,. ss ; SI I I; it01r I &! I I I j i I nisi : z.cs I (i yam. 1lI , ___ --5 -'45 -W -__ 2-23.82' _ DELTA- 0paf329.mNNWALLW.( C20 '1 Tope' U.E. (Tis. ____- CH - ------ _ ,_-------'- : - II i i T11 ' I I I __-_-__ -.._ I 3 i II ' -- I ill I I aja+, `S' U.E. (PER RCD PLAZA SOUTH SUBDIVISION I y 1 LOT 1 S' U.E. (TTMP.) I I I I I I III 1 1 PROPOSED EW BUILDING FF ELEVd 35.50 I I '33- '44- E COLBOARD DRIVE N333D H ss3D 777 *I �B ,.eB 312E • 3:. C. LOT a MASON s1 REST 'o OT 7 BOOR BA3 0 0 PROPOSED AAml mangli ENTRYWAY DETAIL REPLAT DINE•34M 0+10 0+20 0+30 TRENCH DRAIN PROFILE SCALE: H.I •s V 1 •2 NOTE ERIOOIC HAINTENAKE OF THE TRENCH MAIN PIPE N MASH ORATE WILL BE REW IREO City of Port Collins. Colorado UTOATV PLAN APPROVAL APPBaE BY MIA Y — OUCKED mc¢o BY. Trp"'"u, MIT, OECMo BY._jwgx� _ MC3ID BY _ OIEOIUD BY _ AM G/f/� 4 ACAS BOB Date aLrlcneLN aaHo uem w3vM QmAI SHEAR ENGINEERING CORPORATION FRId Booker CMAtl B.M.S. SUBSTANTIAL BUBDING CORPORATION A ISS SO. COLLEGE AGE. SUITE 12, FORT GOWNS. COLORADO BUSES GRADING P (PHASE I CONSI'RUCDO'. LOT 2, SON STREET P.U.D. 7