HomeMy WebLinkAboutLot Certifications - 07/02/2014 (6)City of j
art C01,10ins
Date
Permit Application No.
Address:
Lot: 235
Subdivision:
CERTIFICATION OF LOT GRADING
Utilities
electric. stormwater. wastewater. water
706 wood St.
PO Box 580
Fort Collins, CO 80522
970.221:6700
970.221.6619 fax . 970.224.6003 TDD
utilities()fcgov.com . fcgov:com/utilities
to City Code 4 26-544 and City Land Use Code-4 3.2.2 (e)
n/a
co rjaaraoo '7/212vor _, t
1
(,(Print) Steven M. Strickling a Colorado registered professional engineer, verify that the above
referenced property in they City of Fort Collins, Colorado, has been inspected by me or an appropriately qualified
professional under my direct supervision, and verify that construction of all stormwater facilities and grading is complete,
and that the elevations and drainage patterns shown on the attached drawing(s) which were developed from a survey
performed on (Date): June 25, 2014 accurately and truly depict the elevations and drainage patterns as
they existed on the date of the survey. Based on this information, I certify that (check one):
/Theelevations and drainage patterns of the lot/site are in substantial conformance with the City approved
drainage and grading plan for the property (information attached). SEE NOTE.
❑ . The elevations and drainage patterns of the lot/site as measured are in general conformance with the City
approved drainage plan with exceptions (information attached). In my professional judgment the elevations
and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved
drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the
approved drainage plan. SEE NOTE.
By:
.. .
31
'�J,
(address of ;signing party)
ii
NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, Including but not limited to drawings of the IoUsite showing the approved design and as -built surveyed
elevations of all structures, drainage and grading features (e.g. swales, retaining walls, lot comers), written
information/explanation of discrepancies, and other information necessary to confirm ti4e above certification to:
Fort Collins Utilities (y
700 Wood Street
Fort Collins, CO 80621
(970)221.6700 j
Rev. 127/12 At least Two Weeks Prior To Requesting A Certification Of Occupancy For The Property
No Text
1p
o...:>e1,
ELEVATION AND DRAINAGE CERTIFICATE
NO.14—RF6-235
Surveying Inc.
L-0.
C�. Mar.. W n SnA..1� IM1
6841 SOUTH YOSEMITE STREET 1100
CENTENNIAL. CO 80112
4• PLASTIC FENCE 0.4' WIDE
0.2' OUTSIDE PROPERTY
4' PLASTIC FENCE 0.4' WIDE
2.7' INSIDE PROPERTY
TRACT AS
9 7'47-"
0 3n 5' U.E. 91.3 91. S8.28r91.4 09111
M
Iu7
b1In �� m � p
2.2
6,389 �SQF F I p
93.Bx I N Ix93.6 x93.6 x93.5 I O
of 1 of of
cq
14. 94.6 94 6 94,64 3 11
2]
93. 5x 2= IS 1i1
tax p
w w
234 ml
9 p
1x 3.51 9.517% �x61B 1E 3 W
Dx #3126 5
°' TTOF=4895.45 w 3
OUTLINE OF,,• 1n W O
EXISTING HOUSE 1 ^ 1 °� ?
(DRAINAGE CERTIFICATION
PASSED ON 06-09-2014) 1 H4 4. 15% ° �
W
O -J
n I� 3 (n
4 I I r 14x1 9^�a Oe' Im �.
1 . WALK 9a. 16X � .9 T co
In
3.61 94. °
937x CONIC DRIVE 1
6 e4 N p
9' U.E.
o f
SD D7'47 ME 5 932
,B.M. 4.5 WALR.3.2 2.00 9 6 .2 c
a'TE/LAW R=3•00 9 .4 a I
FLOW LANE RE0
DRIVE f
BRYCE
51' R.O.W. 1
,1a
pA J:
d�
PRO P.E 0 S. R
o zo ao
SCALE: 1"=20' PREPARED FOR: MERITAGE HOMES
LOT 235, RIGDEN FARM FILING SIX, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO;
ALSO KNOWN AS: 3126 BRYCE DRIVE.
ELEVATION AND DRAINAGE CERTIFICATE
I HEREBY CERTIFY THAT THE GRADING AND DRAINAGE PATTERNS SHOWN HEREON WERE DEVELOPED FROM AN ELEVATION SURVEY
OF THE PROPERTY DESCRIBED HEREON, PERFORMED ON THE DATE SHOWN, AND TO THE BEST OF MY KNOWLEDGE AND BELIEF,
ACCURATELY DEPICT THE RELATIVE ELEVATIONS AS THEY EXISTED ON THE DATE OF THE SURVEY. THE RELATIVE ELEVATIONS WERE
MEASURED TO THE NEAREST 0.1 FEET. THERE IS SUBSTANTIAL POSITIVE SURFACE DRAINAGE AWAY FROM THE FOUNDATION AND
THE GRADING AND DRAINAGE PATTERNS SUBSTANTIALLY MEET THE REQUIREMENTS AS SHOWN ON THE PLOT PLAN, DATED
02-13-14 . THE ELEVATIONS DEPICTED HEREON MAY CHANGE SUBSEQUENT TO THE DATE HEREON DUE TO SUBSIDENCE
OR UPHEAVAL OF SOILS, ADDITION OR REMOVAL OF SOILS, EROSION OF SOILS BY WIND OR WATER OR OTHER FACTORS. DRAINAGE
DRAINAGE SWALES OR FLOW MAY BE BLOCKED BY FENCES, WALKS, LANDSCAPING OR OTHER IMPROVEMENTS, THEREFORE THIS
SURVEY MAY NOT ACCURATELY DEPICT THE GRADING AND DRAINAGE PATTERNS SUBSEQUENT TO THE DATE OF THIS SURVEY.
THIS DOCUMENT IS NOT AN IMPROVEMENT LOCATION CERTIFICATE OR LAND SURVEY PUT.
THE ABOVE STATEMENT DOES NOT WARRANT THIS PROPERTY TO BE FREE FROM INSTANCES OF STANDING OR SLOW DRAINING WATER AWAY FROM THE FOUNDATION.