HomeMy WebLinkAboutLot Certifications - 03/03/2015 (6)�-
C'}"
Utilities
electric. stormwater. wastewater. water
0f
Fort
oWoodst:
PO Box 580
Collins
Fort Collins, CO 80522
F
970.221.6700
970.221.6619 fax . 970.224.6003 TDD
utilities(4)fcgov.com . fcgov.com/utifities
CERTIFICATION OF LOT GRADING
Pursuant to City Code rg 26-544 and City Land Use Code 4 3.2.2 (e)
Date: March 3. 2015
Permit Application No. B1403141CO
Address: 2980 Haflinger Drive rdad /;I�t
Lot: 210 Block: n/a
Subdivision: Rigden Farm Filing Six
(,(Print) - Steven M. Strickling a Colorado registered professional, engineer, verify that the above
referenced property.in the City of Fort Collins, Colorado, has been inspected by me or an appropriately qualified
professional under my direct supervision, and verify that construction of all stormwater facilities and grading is complete,
and that the elevations and drainage patterns shown on the attached drawing(s) which were developed from a survey
performed on (Date): February 17, 2015 accurately and truly depict the elevations and drainage patterns
as th7Thi
xisted on the date of the survey. Based on this information, I certify that (check one):
they
elevations and drainage patterns of the Iot/site'are in substantial coformance with the City approved
drainage and grading plan for the property (information attached). SEE NOTE.
❑ The elevations and drainage patterns of the lot/site as measured are in general conformance with the City
approved drainage plan with exceptions (information attached). In my professional judgment the elevations
and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved
drainage plan, and will affect stormwater drainage on and off the to a manner consistent with the
approved drainage plan. SEE NOTE. o LICE
�OQQ ST p
J
By: i
(signature, PE stamp)
10056 Brisbane Lane, Littleton, CO 80130
(address of signing party)
NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including but not limited to drawings of the lot/site showing the approved design and as -built surveyed
elevations of all structures, drainage and grading features (e.g. swales, retaining walls, lot comers), written
Inforrnationtexplanation of discrepancies, and other Information necessary to confirm the above certification to:
Fort Collins Utilities
700 Wood Street
Fort Collins, CO 80621
(970) Y21-6700
Rev. 1127112 At least Two Weeks Prior To Requesting A Certification Of Occupancy For The Property
No Text
ELEVATI
Surveying, Inc.
,.w.....Xm A�
[!9!
W41 SOUTH YOSEVIE STREET #100
CENTENNIAL, CO 80112
211
W '
It
N
9T.B
`�T
gr
+J
1.7
'
tsx
yx
92.8 91.8
K
"
'
209
J
'
OUTUNE OF
9 8
EXISTING HOUSE
92.3 '. °.
g r
(DRAINAGE CERTIFICATION
PASSED ON i1-25-2014
]Rg
1`92.
ly 91 8
LOT'
9x
I92.2 WALK
^
t.71
CONC' DRIVE
1.7
1..
h
9' U.E.
K
Y
S88'22'17
NAGE CE
TRACT AE
262
}1 aLq
04
1+ 210 K�
=I I M N
90.0 7,092 SQFr
MI I 191.3 91.3X 91.2X '
4 j
-f 92.7X I N in I
of 91.2 It
91. i 2. 92.7 15x Ix
Is lox 9� �
" I TOF�4893.54
lox
a
KI
92�.3j1+X
j 3.25 , R—oo.o+ 4s' WAUe
191.3 L15 .° _ 6' TREE/LAWN
��,•••+++ OP BACK OF CURB
FLOW ONE
® DGE OF ASPHALT
HAFLINGER DRIVE
RE��
PRO 0 SLOT
S��9p��ryty%,,•. c't�i ttt
H��f'• r••15.....•f•,r1T,t
0 20 40
SCALE: 1'-20' PREPARED FOR: MERITAGE HOMES DA 1L
LOT 210, RIGDEN FARM FILING SIX, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO;
ALSO KNOWN AS: 2980 HAFLINGER DRIVE.
ELEVATION AND DRAINAGE CERTIFICATE
THE GRADING FOR THE LOT SHOWN HEREON ACCURATELY REFLECTS THE DESIGN OF THE CRY OF FORT COLLINS APPROVED AREA
GRADING PLAN PREPARED BY THE ENGINEER OF RECORD.
I HEREBY CERTIFY THAT THE ELEVATION AND DRAINAGE PATTERNS SHOWN HEREON WERE DEVELOPED FROM AN ELEVATION SURVEY
OF THE PROPERTY DESCRIBED HEREON. PERFORMED ON THE DATE SHOWN, AND TO THE BEST OF MY KNOWLEDGE AND BELIEF,
ACCURATELY DEPICT THE RELATIVE ELEVATIONS AS THEY EXISTED ON THE DATE OF THE SURVEY. THE RELATIVE ELEVATIONS WERE
MEASURED TO THE NEAREST 0.1 FEET. THERE IS SURFACE DRAINAGE AWAY FROM THE FOUNDATION AND
THE ELEVATION AND DRAINAGE PATTERNS MEET THE REQUIREMENTS AS SHOWN ON THE PLOT PLAN, DATED
06-13-14 . THE ELEVATIONS DEPICTED HEREON MAY CHANGE SUBSEQUENT TO THE DATE HEREON DUE TO SUBSIDENCE
OR UPHEAVAL OF SOILS, ADDITION OR REMOVAL OF SOILS, EROSION OF SOILS BY WIND OR WATER OR OTHER FACTORS. DRAINAGE
DRAINAGE SWALES OR FLOW MAY BE BLOCKED BY FENCES, WALKS, LANDSCAPING OR OTHER IMPROVEMENTS, THEREFORE THIS
SURVEY MAY NOT ACCURATELY DEPICT THE ELEVATION AND DRAINAGE PATTERNS SUBSEQUENT TO THE DATE OF THIS SURVEY.
THIS DOCUMENT IS NOT AN IMPROVEMENT LOCATION CERRFlGTE OR LAND SURVEY PLAT.
THE ABOVE STATEMENT DOM NOT WARRANT THIS PROPERTY TO BE FREE FROM INSTANCES OF STANDING OR SLOW ORNNNG WATER AWAY FROM THE FOUNDATION.