Loading...
HomeMy WebLinkAboutSite Certifications - 09/07/1995.) STORCK DEVELOPMENT. C O R P O R A T I O N September 1, 1995 Glen Schlueter City of Ft. Collins Storm Drainage P. O. Box 580 Ft. Collins, CO 80522 Dear Glen: Uonou �wCru Sbyrc 4��v ,ro i'�i�r1y �►er �k.<.���ts Please accept this letter as my understanding of our conversation of August 31, 1995. The storm drainage improvements (channel, rip -rap, and pond) were certified in 1994. We are now requesting the release of lots in Phase 3. Northern Engineering is to furnish certification of items as required in the near future. Until such certification is approved, an additional ten (10) building permits will be allowed. / h CGU � Thank you for your help in this regard. �� / Sincerely, SWd STORCCKK DEVELOPMENT CORPORATION Richard R. Storck President —��_ Cdr/(tc RRS/dd NOWM ERN ENGINEERING 'ILL NO.303 221-4159 Sep 07,95 14:13 P.Oi Memorandum To: Glen Shlueter, City of Fort Collins Stormwater Utility From: Bud Curtiss, Northern Engineering Inc. Date: September 7, 1995 Subject: Hampshire Pond PUD Glen, Thanks for taking the time to meet with us in the field the other day to discuss further drainage certifications needed on the Hampshire Pond development. Northern Engineering, on behalf of Richard Storck is currently preparing a drainage certification for site improvements within his third phase of his development, plus further documentation on the offsite channel and drop structures. We anticipate that this certification will be delivered to your office no later than September 12, 1995. We will -be happy to meet with you to discuss any questions you may hfLve with this certification. Thafik�you for your consideration of this memo. Please call if you have any questions. Bud