Loading...
HomeMy WebLinkAboutSite Certifications - 01/08/1997THE SEAR -BROWN GROUP FULL -SERVICE DESIGN PROFESSIONALS FORMERLY RBD, INC. 209 SOUTH MELDRUM FORT COLLINS, COLORADO 80521-2603 970-482-5922 FAX:.970-482-6368 STORMWATEFR RECEIV5-0 AN 0 g 17 January 8, 1997 14e �rwist- IIJI-er Fit-Tsm /fir i1+E IIJ�,f_'IS oA1 413af-=L0 Mr. Basil Hamdan �QIdE IJCAR TFtE City of Fort Collins 113TEiZSEcTtC J o>= Stormwater Utility Age 1iU NEFa or Kr PAIR 235 Matthews Fort Collins, CO 80522 ' SoBsrA�jnAL Ef�bslonJ IS occ-01PKII,j[-j TFtC S�DEW�K r-ow/E2TS A�•/rF�Am8E1; cl00Cr A-nre SKI F co02r,:, t^�R[cn✓E Re: Phase 2 Drainage Improvements certification �O a�F• Harmony Crossing P.U.D. Dear Mr. Hamdan, This letter serves as a partial drainage certification of the Harmony Crossing P.U.D, specifically to certify that the drainage improvements for Phase 2A and 2B shown on the Utility Plans were constructed in reasonable conformity to the construction plans. On December 30, 1996 a survey crew from Sear -Brown (formerly RBD) visited the above referenced site and surveyed the drainage improvements constructed with Phases 2A and 2B, along with the outstanding Phase 1 drainage item not covered in the Phase 1 certification dated January 9, 1995 by RBD. We have surveyed the drainage items and have recorded the results on the enclosed redlined drawings. As of December 30,1996 the following items have been completed in reasonable conformity with the Utility Plans: ✓1. 18" RCP pipe and curb inlets in Angelo Drive between Delany Drive and Dakota Court. d 2. 2- 29"x45" HERCP from Angelo Drive to the detention pond. 3. Sidewalk culverts at Amber Court, and Skye Court. 4. Detention Pond outlet Structure. The final UDSEWER calculation shown in the drainage report was modified by Sear -Brown to include the as built elevations, and the respective minor changes in the hydraulic profile for the pipe system in Angelo Drive are reflected in the enclosed redlined drawings. NEW YORK•PENNSYLVANIA COLORADO•UTAH STANDARDS IN EXCELLENCE EQUAL OPPORTUNITY EMPLOYER The following items have not yet been constructed and were not field verified: 30" RCP and manholes in Angelo Drive west of Dakota Court (Phase 3). 2. 24" RCP across Wilmington Drive (Phase 3) 3. 10' and 15' curb inlets at the intersection of Wilmington Drive and Angelo Drive (Phase 3). 4. 15" RCP and 10' curb inlet in Wilmington Drive (Phase 3). 5. Drainage Swale C-C along the south boundary of the P.U.D. (Phase 3). This certification does not address landscaping issues or sediment from construction in the storm sewers. In general all measured elevations show that construction was done within accepted tolerances and that the storm drainage system will function as designed. This certification is signed and stamped, and by signing this letter I attest that to the best of my knowledge the as -built conditions of the site are as shown on the attached redlined photocopy. Failure to properly disclose all known information -could result in the rejection of this certification and prevent the release of any Stormwater Utility holds no the Building Permit or Certificates of Occupancy. Thank -you for your time and consideration of this submittal. Sincerely 7 " Z. ; Dale Stein, P.E. cc: John Cunningham - Gateway American