HomeMy WebLinkAboutSite Certifications - 07/23/1997"' vnlwWATER RECEIVED JUL 2 5 1997 GATEWAY- ERICAN July 23, 1997 Mr. Basil Harridan City of Fort Collins Stormwater Utilities Department 281 N. College Ave. PO Box 580 Fort Collins, Co. 80522-0580 Ref: Harmony Crossing P.U.D Fort Collins, Co. Subject: Phase 2 Drainage Iniprove ments' Certi`cation Dear Basil, Please refer to your letter, dated 7/9/97, to Dale Stein, Sear -Brown, regarding the gravel inlet filters on Angelo Drive and the erosion below the sidewalk culverts at Amber & Skye Courts on the above referenced project. This letter serves to advise that these two (2) issues have been corrected on 7/21/97. Gateway requests that The City re -inspects these items and confirm the corrective measures taken are acceptable to The City. Also, Gateway requests that the three (3) gravel inlet filters be permanently removed. Upon personal inspection and confirmation with Jim Drop, US Home Project Superintendent, the homeowners at the gravel inlet filters are the persons that are removing/disturbing the gravel inlet filters. Their reasons for disturbing these gravel filters is due to the temporary ponding water during rains at these locations. Please advise if the corrective measures are acceptable and if the gravel inlet filters can be removed. If you have any additional questions or comments concerning this matter, please contact me. Your time and attention to this matter will be appreciated. Sincerely, Gateway American Properties UV Mark A. Hollenbeck Development Coordinator encl: City letter, dated 7/9/96 cc: Dale Stein, The Sear -Brown Group Jim Drop, US Homes Mark Traver, Gateway Director of Development Geoff Phillips, Gateway 9145 E. Kenyon Ave., Suite 202 Denver, Colorado 80237 Telephone (303) 843-9742 Facsimile (303) 843-0143 Utility Services Stormwater Dale Stein The Sear -Brown Group 209 South Meldrum Fort Collins, CO 80521-2603 July 9, 1997 Re: Phase 2 Drainage Improvements Certification Harmony Crossing P.U.D. Dear Dale: Field verification of the partially certified drainage utilities for Phase 2 of Harmony Crossing P.U.D. was completed. The following items have been found to be in need of attention. These items ;rust be addressed before approval of the as -built plans can be given. 1. The gravel inlet filters at the inlets on Angelo Drive, near the intersection of Angelo and Dakota, are in need of repair. 2. Substantial erosion is occurring below the sidewalk culverts at Amber Court and Skye Court. Corrective measures need to be made. . Please feel free to call with any questions you may have. Sincerely, Basil Hamdan Stormwater Utility, City of Fort Collins cc: John Cunningham - Gateway American 235 Mathews Street - P.O. Box 580 - Fort Collins, C-O 80522-0580 - (970) 221-6589 - FAX (970) 221-6239