HomeMy WebLinkAboutLot Certifications - 06/26/1998 (5)s
FOUNDATION I Engineering, a" 7.
/��1/�%
AND SOILS Inc. l/ E
July 24, 1998 Commission No.: 4271-01-02-04 2 (00c� j
Admiral Bay Construction, Inc.
P. O. Box 358
Windsor, Colorado 80550
RE: Lot 19, Greenbiiai_V lla`�e 3 Firing (620 Bayberry Circle), Fort Collins, Colorado
Gentlemen:
We have measured the relative elevations at the above referenced address. During the investigation,
we measured elevations at the lot sides and corners, top of finished floor, lowest opening, the
drainage swales on either side of the lot. The slopes and elevations as measured are in substantial
conformance with the FHA grading plan completed by Stewart & Associates.
If you have any questions, please feel free to call.
Respectfully,
Clifford P. Ham. M.S.
�t�:t#grfQi�,ptaUEarth Sciences Specialist
. P.E.
& SOILS ENGINEERING. INC.
CPH/jle
5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660
500 Kimbark Street, Suite 101 •1.on_mont. Colorado 80501 •(303) 702-0661 •Fax (303) 774-8413
NORTH
ELEVATIONS SURVEYED
6 �' I fo/23/98
6 7. 5
0 68. 1
6$.0
R
�$•I To' of F,NisNES
FLOOR = 6a.6
LowEST oPEr�11Na 67,6
= 6$.0 6g.0
"D
0 a
9
e.
67- n
67,00
LONC
° DRIVE
v ,
7.4-
c
[SENcHMARK
('n O
` NOTE:
THIS GRADING PLAN IS BASED UPON THE BEST
INFORMATION AVAILABLE TO THIS OFFICE AT THE
TIME OF SURVEY.
JOB N0. 4211 1- 4 4DM I RAL SA1' CONST.
ATE FOUNDATION
6r241W sr�Urris�,Qs LOT M, GREENBRIAR 3RD 5U5.
SCALE ENGINEERING FORT COLLINS, GOLORADO
I' ALE
DRAVN,
RF STRUCTURAL FOUNDATION AND SOILS ENGINEERING
LOVELAND COLORADO 663-0139