Loading...
HomeMy WebLinkAboutLot Certifications - 06/26/1998 (5)s FOUNDATION I Engineering, a" 7. /��1/�% AND SOILS Inc. l/ E July 24, 1998 Commission No.: 4271-01-02-04 2 (00c� j Admiral Bay Construction, Inc. P. O. Box 358 Windsor, Colorado 80550 RE: Lot 19, Greenbiiai_V lla`�e 3 Firing (620 Bayberry Circle), Fort Collins, Colorado Gentlemen: We have measured the relative elevations at the above referenced address. During the investigation, we measured elevations at the lot sides and corners, top of finished floor, lowest opening, the drainage swales on either side of the lot. The slopes and elevations as measured are in substantial conformance with the FHA grading plan completed by Stewart & Associates. If you have any questions, please feel free to call. Respectfully, Clifford P. Ham. M.S. �t�:t#grfQi�,ptaUEarth Sciences Specialist . P.E. & SOILS ENGINEERING. INC. CPH/jle 5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660 500 Kimbark Street, Suite 101 •1.on_mont. Colorado 80501 •(303) 702-0661 •Fax (303) 774-8413 NORTH ELEVATIONS SURVEYED 6 �' I fo/23/98 6 7. 5 0 68. 1 6$.0 R �$•I To' of F,NisNES FLOOR = 6a.6 LowEST oPEr�11Na 67,6 = 6$.0 6g.0 "D 0 a 9 e. 67- n 67,00 LONC ° DRIVE v , 7.4- c [SENcHMARK ('n O ` NOTE: THIS GRADING PLAN IS BASED UPON THE BEST INFORMATION AVAILABLE TO THIS OFFICE AT THE TIME OF SURVEY. JOB N0. 4211 1- 4 4DM I RAL SA1' CONST. ATE FOUNDATION 6r241W sr�Urris�,Qs LOT M, GREENBRIAR 3RD 5U5. SCALE ENGINEERING FORT COLLINS, GOLORADO I' ALE DRAVN, RF STRUCTURAL FOUNDATION AND SOILS ENGINEERING LOVELAND COLORADO 663-0139