HomeMy WebLinkAboutLot Certifications - 09/10/1997 (2)DESYH HOMES 3032265le4 P.03
SEF- 9-37 TUF 8:*6 AM FOUNDATI :1_ENGINERRING
FOUNDATION 11consultins
LNGiNEERYNG Engineers, Ltd.
September 8, 1997
CPttnnission No. 1204-27-02-04
Desyn: Homes
P.D. Box 9681
Fort Collins, CO 80525
Fax N4 1950601660
5 (P(&V-
r9\
P. 1
gE; Lot 9, Harbn walk E atss% (3925 Warbor Walk Lade), Fort
Collins, Colorado
Gentlemen:
we have measured the relative elevations at the above referenced
address, During the investigation, we measured elevations at the
lot sidem and corners, top of finished floor, and the Swales or,
either side of the lot. The slopes and elevations as measured are
in substantial conformance with the FHA grading plan Completed by
TST, Inc., Job No. 10-618-112, dated January, 1990.
zf you have any questions, please, feel free to call.
Reepectfull
C1 fAr.
Hnvirollt n1
Rev' Wed �by:
vG�rat/
Kevin W. Pat
FOUNDATION E
CPH/jIQ
.S.
P.E.
Specialist
ENGINEERS, T.TD.
DESYN HOMES 3032265184 P.02
SEP- •i-97 TUE 8:2G M FOMIDATION_ KINEERING FAX NO, 197060`31166
L2
t2.0
133.9
• tsj
mi 140 /
268 � .�
23.9 ELEVATIONS SLRVEYE
lei9.2-BT
TOP OR F0� MED FLOOR 20
IT3.2
LOWS TO ENW
24.2
211
� • 22,8
23.2 ,
249
3.2 22.2
no a(
(Am* of WON 11i6'lrpry L kN of W Jt
REVISED GRADING PLAN
LOT gg, WA W6TCN HILLS P.u.).
4th FUN FOUNDATION CCIlYaUL7•ING
FORT COLLWa COLORADO ENGINFEEFRNG nt al nir cszg
Note; This W is bsn4 on I8i best afAWZ+•4oaL FGUIYDs►,ON O.NO SOILS HNa,vEE-*•ti-
y�a�jpn av�a! an fw" of survey. IOJELANO e92-0421e CO\Offilwpo