HomeMy WebLinkAboutLot Certifications - 08/25/2004 (6).,
STEWART&ASSOCIATES
Consulting Engineers and Surveyors
August 19, 2004
Mr. Jay Barber
Stormwater Utility
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Jay,
STORMWATER
RECEIVED
AUG 19 2004
Please find enclosed the "AS -BUILT" survey of the grading on Lot 1, First Replat Of
Harbor Walk Estates Phase 11 P.U.D., Fort Collins, Colorado, which is 3819 Harbor Walk Lane.
The grading was done in substantial compliance with the Drainage, Grading, and Erosion
Control Plan prepared by Stewart and Associates dated November 14, 2001.
If you have any questions regarding this certificate, please call.
Sincerely,
Richard A. Rutherford, P.E. & S.
RAR/meh
James H. Stewart and Associates, Inc.
103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522 HA"ER WALK EST Ltlub.dm.dot 970/482-9331 • Fax 970/482-9382 j Cli I'25 �V� /�/,
LEGEND:
f
�f
95.1
1/ ti
/ ! L
+X55
! /SPLASH BLIX
m
4%
95yy
''
Ag9
sb:as
1
95S
,CQNCeErEPn1nCG
Tn —n
\31READ
AT%'71
c \
—EXSISTING CONTOUR LINES: -----------------
-PROPOSED CONTOUR LINES:
NOTE: 1—LOCATE END OF SEWER SERVICE
AND DEPTH PRIOR TO EXCAVATING
* A. BASEMENT
\ 2—NEW GRADES SHALL PROVIDE
uses �\ POSITIVE DRAINAGE AWAY FROM
Ns% \\�\ �+ ALL FOUNDATIONS
\\ .� \\ \ +0� 3—DIMENSIONS SHOWN LOCATING
\ \ \ STRUCTURES SHALL BE FIELD
VERIFIED
2, TREAD
W IFOW WELL 885 2 TREAD I Al\ ... ;„
F.F. \\\ B.:..;.
4.
\s /
\\AReQR w���S \��(+/ SEWEr9.22
Wq�N.=S�RIM= IVE
pRIVE VEq C v
@4.
AT
EXIST Swkt
TO BE.RENOv Cq-
,4993
22.5 degree
J uv -
94.5 4a4 C ire p g degree yam` `
42 lF \
g c`�a PP GRADING PLAN\\ ,
SCALE V=10'-0' \------�� +
A&_ Ul-LS _Sus-veY. ��snnius
SAT AVGPSZJB;.'L9P_¢ ___--
ib _
'J for F.R:r 2Gprar Hgeaoe 111�K Esrn
581 HAReo W ue LADE pR4p
Ri
Aer P ASc f! 502E
The
ARCHITECTS'
STUDIO
lov
GRADING
PLAN
JOB 00103
DATE 09/26/01