HomeMy WebLinkAboutLot Certifications - 01/29/2002�2 610
January 23, 2002
Mr. Jay Barber
Stormwater Utility
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Jay,
Please find enclosed the redlined "AS BUILT" survey of the grading for Lot 7 Greenstone
PUD Phase I which is 7400 Greenstone Trail, Fort Collins, Colorado.
The approved grading plat is sparse in showing the proposed grading for this lot, therefor we
shot "AS BUILT" elevations and show final flow directions. The grading will work for this lot as
graded.
If you hayq an�ygyestio
Sincerely, ,�•Q3��STE'•`it�
Franklin D:
FDB/meh
regarding this certification, please call.
L4
(A
qq,
AS BUILT GRADING CERTIFICATE
7400 GREENSTONE TRAIL
LOT 7, GREENSTONE P.U.D., PHASE
FORT COLLINS, COLOWO
N01024'43"E 264.58' pl.q
of
UTILITY EASEMENT 1 — ---------- I I
o
0
.9 J.
12. 0'
91,
i4 6. 0' .2,07....1
TWO STORY STUCCO
HOME WITH BASEMENT -i
7.
F71
2.0
2 0
A 39.5
qqJ
------------
--------------
25' UTILITY
EASEMENT 16,4
S00055'10"W 222.95'
Franklin D. Blake
PE & LS No 7839
Date: z
411
SCALE 1 60'