Loading...
HomeMy WebLinkAboutSite Certifications - 03/24/1995�7 PARSONS & 1� ASSOCIATES, INC. CONSULTING ENGINEERS March 24, 1995 Mr. Glen Schlueter Stormwater Development Manager City of Fort Collins P.O. Box 580 Fort Collins, CO. 80522 RE: Drainage certification for Phase I, Phase II, Greenstone P.U.D. Dear Glen: Enclosed find the As -built drainage,' grading.& erosion control drawings for Phase I and Phase.II of Greenstone P.U.D., also find County Road 32 plan and profile sheets from Sta. 61+10 to 73+10. Our field inspection has confirmed that all existing drainage features conform to the original drainage plans and field changes have been noted at appropriate locations. Following is a listing of changes to planned drainage that have occurred: 1. The 2' metal sidewalk culvert has been replaced by a 4' concrete sidewalk culvert on the end of Silver Moon Lane. 2. A 2' concrete pan and 2' metal sidewalk culvert with associated drainage easement has been added to Lot 28. Silver Moon Lane was not constructed to the engineers design elevations immediately adjacent to Lot 28. The drainage pan was installed to drain this lot and the adjacent lot, the easement document and exhibit is included in this certification. 3. A drainage easement on the easterly corner of Lot 53 contiguous to the ROW of Streamside Drive and Tract D. The easement document and drainage exhibit is included in this certification, 4. The V concrete culvert at the end of Red Sky Court replaces the 2' metal sidewalk culvert originally designed. • 432 Link Lane Plaza . Ft. Collins. Colorado 80524 - [3031 221-2400 October 7, 1994 Mr. Glen Schlueter Stormwater Development Manager Page 2 5. Temporary 12" ADS drains were installed at Sta. 61+55, Sta. 64+25 and Sta. 66+25 through the embankment on the north side of County Road 32. These culverts drain water trapped by the construction of the ultimate earth cross- section. Flows will drain to Tract A and downhill to Tract J via a shallow "V" ditch. All storm flow will concentrate to design,po�ht 5 and will be conveyed to Stanton Creek by the existing 18" RCP at the intersection of Streamside Drive and Gold"Hill Court. 6. The irrigation outfall at Sta.'71+55 (County Road 32) was not constructed, the existing .irrigation lateral was abandoned. The landscape pond at the northeast corner of Greenstone Trail and County Road 32 has been supplied with 2" domestic water taps from the main on County Road 32, as shown on As -built drawings. The modifications to the original drainage plan have no adverse effect on the approved drainage concept or reports. Please release the remaining building permits for Phase I and Phase II of Greenstone P.U.D. If you have any questions or require additional information, please do not hesitate to call. Yours truly, PARSONS & ASSOCIATES, INC. U• D� �ututunttrrtpni�„��� Ga A. Odehnal, P.E. AV r t �VO0PRnG/sly GAO/id enc. '13.=g5