Loading...
HomeMy WebLinkAboutSite Certifications - 11/01/2006November 1, 2006 Mr. Jay Barber City of Fort Collins Storm Water Utility 700 Wood Street Fort Collins, CO 80521 Re: Water Quality Pond Certification Rigden Farm Filing 6 JR Project 39164.41 Dear Mr. Barber, ft) J•R ENGINEERING A Westrian Company The purpose of this letter is to serve as a Water Quality Pond Certification for Water Quality Pond 1 and Water Quality Pond 2 in the Rigden Farm Filing Six Subdivision. JR Engineering has reviewed the following items through field observations and a survey completed by Nolte and Associates, Inc: o Water Quality Capture Volumes o Water Quality Outlet Structure o Spillway Length and Elevation o General Structural Integrity of Ponds o Erosion control measures Enclosed with this letter you will find as -built stage -storage calculations for Water Quality Pond I and Water Quality Pond 2. The required water quality capture volumes (WQCV) were obtained from the "Final Drainage and Erosion Control Report Rigden Farm — Filing Six" (JR Eng. February 8, 2002), approved on May 20, 2002. V It should also be noted that the elevations for Water Quality Pond 1 and Water Quality Pond 2 may change subsequent to the date of the surveys due to natural and/or artificial actions. Water Quality Pond 1 was observed to have approximately eight inches of standing water at the time of the field visit. The invert of the outlet structure is higher than the bottom of the pond. Water Quality Pond I is required to have a water quality capture volume (WQCV) of 0.13-acre-feet at an elevation of 4909.90'. From the survey data, it was found that the existing grading provides a WQCV of approximately 0.13 acre-feet at an elevation of 4909.80'. The structural integrity, side slopes, and compaction of the berm for Water Quality Pond I were observed to be adequate. The top of berm elevation is 4912.15', which is lower than the 4913' design elevation. From the survey data, it is noted that the spillway elevation for Water Quality Pond 1 is at an elevation of approximately 4912.15'. This is slightly higher than the design elevation of 4912.00'. JR Engineering has reviewed the permanent erosion control measures and it appears that riprap has been installed in general accordance with the design plans. JR Engineering also observed that temporary erosion control measures such as silt fence and mulching were being utilized in the area of Water Quality Pond 1. The orifice plate 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w jrengineering.wm November 1, 2006 Page 2 of 2 was observed to have 8 holes with a diameter of %2". The design called for 6 holes with a diameter of It is recommended that the orifice plate be replaced to meet the design. Water Quality Pond 2 was observed to have approximately six inches of standing water at the time of the field visit. The invert of the outlet structure is higher than the bottom of the pond. Water Quality Pond 2 is required to have a water quality capture volume (WQCV) of 0.08 acre-feet at an elevation of 4906.60'. From the survey data, it was found that the existing grading provides a WQCV of approximately 0.13 acre-feet at an elevation of 4906.50'. The structural integrity, side slopes, and compaction of the berm for Water Quality Pond 2 were observed to be adequate. The top of berm elevation is 4908.72', which is lower than the 4909' design elevation. From the survey data, it is noted that the spillway elevation for Water Quality Pond 2 is at an elevation of approximately 4908.72'. This is higher than the design elevation of 4908.00'. JR Engineering has reviewed the permanent erosion control measures and it appears that riprap has been installed in general accordance with the design plans. JR Engineering also observed that temporary erosion control measures such as silt fence and mulching were being utilized in the area of Water Quality Pond 2. The orifice plate was observed to have 8 holes with a diameter of The design called for 6 holes with a diameter of/2". It is recommended that the orifice plate be replaced to meet the design. In summary, it is expected that the orifice plates be replaced for both ponds. Based upon our field visits and provided survey information, it is our opinion that the water quality facilities as noted above for Rigden Farm Filing Six have been constructed in general conformance to the approved plans. Sincerely, JR Engineering; LLC Prepared By: Eric Tracy, EI Design Engineer XA3910000.all\3916441\Word\ReportsWs-built Pond Cert.doc Water Quality Ponds Along Foothills Regoinal Channel Proposed Detention Pond - Stage/Storage DESIGN LOCATION: Rigdm PROJECT NO: 39164.12 COMPUTATIONS BY: B. Strand SUBMITTED BY: JR ENGINEERING DATE: 7/4/2001 V = 1/3 d (A + 8 + sgrt(A'8)) where V = volume between contours, ft3 d = depth between contours, It A = surface area of contour Wafer n...H6 Pnnd I Pond Inv. Pipe Inv - Elev of WQ orifice - WQCV. Top of WQ structure - top of berm - Pond Inv. Pipe Inv - E/ev of WQ orifice - WQCV- Top of WQ structure - top of berm - Stage (ft) Surface Area (fe) Incremental Storage (ac-ft) Total Storage (ac-ft) 4906.49 0 4907 255 0.00 0.00 4908 1,303 0.02 0.02 4908.2 1.582 0.01 0.02 4908.49 1.986 0.01 0.04 4909 2,696 0.03 0.06 4,069 0,07 0,13 4,222 0.01 0.14 5,082 0.05 0.20 E49099,990 5,941 0A2 0.26 7,840 0.16 0.42 Stage (ft) Surface Area (ft`) Incremental Storage (ac-ft) Total Storage (ac-ft) 4903 0 4904 337 0.00 0.00 4905 929 0.01 0.02 4905.3 1,199 0.01 0.02 4906 1,828 0.03 0.05 4906.60 2,637 0.03 0.08 4907 3,176 0.03 0.10 4907.3 3,741 0.02 0.13 4908 5,059 0.09 0.20 4909 1 6,569 0.13 0.33 AS -BUILT LOCATION: Rigden PROJECT NO: 39164.12 COMPUTATIONS BY: ELT SUBMITTED BY: 1R ENGINEERING DATE: 11/l/2006 V = 1 /3 d (A + B + sgrt(A-B)) where V = volume between contours, f? d = depth between contours, It A = surface area of contour wife. m..nf.. P....d I Pond Inv. WQCV- top of berm - Pond Inv. WQCV- top of berm Stage (ft) Surface Area (ft`) Incremental Storage (ac-ft) Total Storage (ac-ft) 4906.34 0 4907 336 0.00 0.00 4908 1,479 0.02 0.02 4909 2,781 0.05 0.07 4909.8 4,068 0.06 0.13 4910 4,390 0.02 0.15 4911 1 6,167 0.12 0.27 4912 1 8,068 0.16 0.43 4912.15 1 9,763 1 0.47 Wafer n... lif Pnnd 9 Stage (ft) Surface Area (W) I Incremental Storage (ac-ft) Total Storage (ac-ft) 4903.62 0 4904 327 0.00 0.00 4905 1,164 0.02 0.02 4906 2,001 0.04 0.05 4906.5 2,710 0.03 0.08 4907 3,419 0.04 0.12 4908 5,162 0.10 0.21 4908.72 6,958 0.10 0.31 Pond Certification 4914.73 4914.35 4914" 4914.97 x ' i919. 491 .89 X 64 49 x 46 x . x 4915.92 491 x 4915.92 4913.90 4913.75 4 91 1.912 a .91296 9W00 X%820 9D)' .9Y921 919 :9 0.$9 ).96 • X rn x 9D Xw0947 �K o9aa1 x 4915.44 4914.55 x 4915.76 4912.93 4912.76 ]491284 9a6 ] .9D)aS X.906.79 x�906 ]. x�90].]0 .. SPILLWAY LENL7M - 5D' 2.46 4912.15 491 .70 491314 x 4913.34 4913.83 �- 4913.76 4911.23 4914.29 4914.03 4913.12 4913.02 4913.34 30 15 0 30 60 SCALE: 1" = 30' r' WATER QUALITY POND 1 RIGDEN FARM FILING 6 JOB NO. 39164.41 11/01/06 SHEET 1 OF 2 J•R ENGINEERING A Westrian Company 26M F34I RmpEd R24 && W- Fat WkA (b 8M 97&-4%-W • Fax 970-4.%-M • wwwrevempn 4910.20 x4909,81 491180 Xx X4909.79 �908.70 x 491 z491 X 49096' \� 491097 9- 4909.03 08.07 x4 4 A907.14 x4907 BR 4912.38x 49 9. 1 X19 4907.78 X4907.58 9D6.95 490 .9 4 X 490 . X4907.58 I x 90 4912.67 4912,13 4912.05 x 4912.78 x 4912.59 x 4912.48 3a' 0 � tH 4 4908.70 x x4908.40 x4908.72 X 4908.74 x _ 8.7 / x 4912.55 x 4912,66 4 x 4912.94 I 4908.54 �4909.11 4908.x4909.447 X X 3 4909.37 x 82 X49D9.33 x4909.66 3.23 6 D 82 X4 7,4 9 4. 4910.07 X4911.31 ' 9 7. 6 X1903.62 X, 40 X4903,6 4912.21 9D3.85 0 0 0 3 X4912.35 .. X49 .06 903 X4904.20 4912.09 X X 4913.44 4913.33 30 15 0 30 60 SCALEI 1° = 30' WATER QUALITY POND 2 RIGDEN FARM FILING 6 .JOB NO. 39164.41 11/01/06 SHEET 2 OF 2 J•R ENGINEERING A WesWan Company 262D East Rmped 834 m 190 • Fat Oft DD 8M 970-4%-M • Fex 97D- 0 -M • wwwrarsmanwIn