CERTIFICATION OF LOT GRADING
Pursuant to City Code § 26-544 and
City Land Use Code § 3.2.2 (e)
Date: 71171V 7
Permit Application No.P�
Address: aoeew"" '!020
Lot: Block:
Subdivision: ���rri,�,,�,,, Ste % S�io✓Jr s �//y/''/t
(,(Print) ��Uge,4 a Colorado registered professional engineer,
verify that the above referenced property in the City of Fort Collins, Colorado, has been inspected by me
or someone under my direct supervision, and verify construction of all stormwater facilities and grading is
complete, and the elevations and drainage patterns shown on the attached drawing(s) which were
developed from a survey performed on (Date) Ste/ 31 l✓7 accurately and truly depict the
elevations and drainage patterns as1heyexisted on the date of the survey. Based on this information, I
certify that (check one):
❑ The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached). SEE NOTE.
The elevations and drainage patterns of the lot/site as measured are in general conformance with
the City approved drainage plan with exceptions (information attached). In my professional
judgment the elevations and grading of the lot as constructed is functionally adequate and will
allow for stormwater drainage consistent with the approved drainage plan.
SEE NOTE.
By:
-V
NOTE:
A COMPLETE certification must be submitted, Including but not limited to drawings of the lotfsite showing the approved design and
as -built surveyed elevations of all structures, drainage and grading features (e.g. swales, retaining walla, lot corners), written
Informationlexplanation of discrepancies, etc. to:
Fort Collins Utilities (970) 221.6700
700 Wood Street
Fort Collins, CO 80521
At Least Two Weeks Prior To Requesting A Certificate Of.Occupancy For The Property
Rev. 1H/O6
S� ?/167
July 17, 2007
Jay Barber
City of Fort Collins Utilities
700 Wood Street
Fort Collins, CO 80521
RE: Harmony School Shops — Fourth Filing Phase 2 Walgreens
Drainage Certification
Dear Jay:
J•R ENGINEERING
A Westrlan Company
The purpose of this letter is to acknowledge that the elevations and drainage patterns of
the site as measured are in general conformance with the City approved drainage plan
with the exception of an area of ponding in the southeast comer of the site.
We have reviewed the available as -built information and visited the site to review this
ponding issue. It appears the sidewalk was constructed with a cross slope in reverse of
that depicted on the approved plans. The intent of the original design was a sidewalk that
slopes north to south with runoff traveling along the south edge of the sidewalk to a low
area with an inlet located at the southeast corner of the subject site. The sidewalk was
constructed sloping in the opposite direction, south to north. This coupled with the
eastern portion of the sidewalk being constructed at a higher elevation then designed has
created an area of ponding.
A Swale has been proposed as the best correction for this drainage issue. The center of
the Swale will be located in the landscape area to the north and parallel the walk and will
lead to a sidewalk chase that will direct runoff to the aforementioned inlet. The
surrounding area will be re -graded to provide positive drainage to the swale. This design
will minimize the amount of runoff traveling along the sidewalk and will alleviate the
current ponding issue.
At this time the contractor is finalizing the aforementioned improvements.
2620 Fan prospect Road, Suite 190, Fort Collins, CO 80525
970491-9888 • Fax: 970-491-9984 • w Jrengineedngxom
Should you have any questions or require additional information, please do not hesitate to
contact our office.
Sincerely,
JR ENGINEERING, LLC
Jo eph C. Spazone, P.E.
roject Manager
cc: Sarah Harteker (Coe Construction Inc.)
Dillon Tidwell (Hunt Douglas)
Scott Wieczorek (Dicon)
John Mountjoy (CFM Realty)
Enclosure
JCS
RECORD SURVEY
AS OF 05/31/07
AS -BUILT LEGEND
(Iwo) AS -BUILT EVELATON
SURVEY TOLERANCE- t0.02'
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
1-800-922-1987
66Wwz'
CALL 2-BUSINESS GAYS IN
i z�¢w�arz
ADVANCE BEFORE YOU DIG,
Q Q Q
oW N
GRADE, OR EXCAVATE FOR THE
z & w
MARKING OF UNDERGROUND
MEMBER UTILITIES.
0u o'Z
d�irc¢z¢»z
LEGEND
aaWa "
00001 LIMITS OF CONSTRUCTION
-- - - -- HSS4 PHASE 1- 5' CONTOUR Q 0 M O
--------- HSS4 PHASE I- P CONTOUR (/1 O 0 C O
PROPOSED 5' CONTOUR tt 41 °O I I
PROPOSED 1' CONTOUR W 3 Z a
VERTICAL CURB W/ CATCH GUTTER Ow w ON O^4
/H OG.OG HS54 PHASE 1 - SPOT ELEVATION ¢ Q DO o
100.00 PROPOSED SPOT ELEVATION w V
FL FLOW LINE a IJ
TC TOP OF CURB c I, w ZO
HP HIGH POINT Z I O = -
LP LOW POINT `* a a
EC EDGE OF CONCRETE _
TW TOP OF WALL
TI TOP OF ISLAND
BI BOTTOM OF ISLAND
FF FINISHED FLOOR y7
EX EXISTING GRADE Fly
GET GRATE ELEVATION a
FG FINISHED GRADE y
SW SIDEWALK F.
NOTES z g�
1. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM �L1y
ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR W YS .
STORM. MINIMUM FINISHED FLOOR ELEVATION ABOVE THE bbbCC6
100-YEAR WATER SURFACE IN STREETS CHANNELS, DITCHES,
OTHERSWA�S. OR DRAINAGELSHSHOWN.
NILLUSTRATED BY A
MASTER GRADING PLANARE TO BE
2. ALL SPOT ELEVATIONS DEPICTED ARE FLOWLrvE UNLESS �a6
OTHERWISE NOTED.
J. ALL CURB AND GUTTER SHALL BE 'OUTFACE CURB AND GUTTER'
UNLESS OTHERWISE NOTED.
4. A MIN SLOPE OF 0.5% TO BE PROVIDED ALONG THE FLOW UNE
OF ALL CATCH CURB AND GUTTER AND 1.5% ACROSS ASPHALT
PAVEMENT. THE MAXIMUM SLOPE ON ASPHALT SHALL BE 5X
n
5. EXISTING EWER INDICATED
INSTALLATIONS AND PRIVATE UTILITIES o
SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION < o
AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT o
GUARANTEE THE ACCURACY OF SUCH INFORMATON. SERVICE o
LINES (WATER, POWER, GAS, STORM DRAIN, SANITARY SEWER,
PHONE, TV) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON m w
THE PLANS. THE CONTRACTOR SHALL CALL ALL UTILITY
COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
6. ALL WORK TO BE ACCOMPLISHED IN STRICT ADHERENCE WITH
ALL LOCAL ORDINANCES. CITY OR STATE.
7. CONTRACTOR TO COORDINATE ALL WORK WITHIN PUBLIC
RIGHT-OF-WAY WTH THE APPROPRIATE UTILITY COMPANIES
6. CONTRACTOR TO PROWDE A MAXIMUM SLOPE OF 2% IN ALL
DIRECTIONS WITHIN HANDICAP PARKING AREAS
9. SEE UTILITY PLANS FOR HARMONY SCHOOL SHOPS FOURTH
FILING BY A ENGINEERING FOR ADDITIONAL INFDRMATON, 12
12
3
O
U
N
Z
O W
a
S
K 3
Z
NOTE: REFER TO SHEET 12A OF THE HARMONY SCHOOL SHOPS 4TH FILING
UTILITY. PLANS FOR TEMPORARY GRADING AND STORM PIPE INFORMATION.
20 10 0 20 40
SCALE: 1" = 20'
a
\
Z
O
\
o
3
¢
Y
3
¢
Y
U
w
W
m
Y
m
Ia
�il
O
w
o
O
w V)
W
�
O Ld
n
Q
Vl J
3
r�
>
o
=
J OV
p
Pttz
p W
V7 L0
O
LJ
= V)
p
0_
O
V) =
a
O O
ILL
I SHEET 8 OF 13 1
I IJOB NO. 39347.07
6
X
�l
------- --------------
---------------------------- --------
®I®
7
UTILITY EASEMENT
PER HSS 4TH
` 60.Ou o
�}C
pp O
MAX �\
Ie \ \
f0FF y \\
1 \ 3 \
/ A
CMIT FF 49130r11 '
SSW T>J AC(� 9 ro M TRANSITION \
EASEMEN) f i LIMIT OF ASPHALT RUSH `
I >J W/SW - BEGIN 10' ) \\
TRANSITION \
ASPHALT RUSH \\ GO
1 fO WITH SIDEWALK \\ 49
O s d
10'I UnLItt
�S EASEMENT
zD' unuTY s � s4: q
ACCESS E�EYNT �K
10'IfUMNGNCYA MISS. \\ \ ' $ I
ACC M & VTUTY E�SEMENT \\ `49 Tl/$// Nx 960 ---
0)
It
CALL UTILITY NOTIFICATION
i
CENTER OF COLORADO
i� o
w
1-800-922-1987
«wsa=
1
/ CALL 2-BUSINESS DAYS IN
3U�¢W�a)
F=za rc mp
ADVANCE BEFORE YOU DIG,
zama��€oa
GRADE. OR EXCAVATE FOR THE
,A.y-- MARKING OF UNDERGROUND
MEMBER UTILITIES.
5mrcvi�a�
1^mo col` o
� m$z0. avM5
- -
LEGEND
: I 00000 LIMITS OF CONSTRUCTION
Fwaawa qF
��aaaadzoa
6
- -- HSS4 PHASE 1 - 5' CONTOUR
o w ^
1_---_------.------
�
_ I I ...-.._.. HSS4 PHASE I - 1' CONTOUR
-1
O~NL I
W
/
I PROPOSED 5' CONTOUR
m
K
/
PROPOSED 1' CONTOUR
m
w ¢3 z v
VERTICAL CURB W/ CATCH GUTTER
w�� W o^�
/
10000 HSS4 PHASE 1 - SPOT ELEVATION
Q Of Q m O
- 100.00 PROPOSED SPOT ELEVATION
w <
FL FLOW UNE
0- L.i Z w
- TC TOP OF CURB
T I--- HP HIGH POINT
C n w Z x
z r = La.
LP LOW POINT
a2
a d
\
I EC EDGE OF CONCRETE
_
\
TW TOP OF WALL
I I T TOP OF ISLAND
--- g
I BI BOTTOM OF ISLAND
I I FF FINISHED FLOUR
�i
FL.I•
/
EX EXISTING GRADE
I\
aJ
GIRT GRATE ELEVATION
GC
I
\\ FG FINISHED GRADE
SW SIDEWALK
W S'
NOTES
z
IT(J
1. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM
z
ELEVATIONS REQUIRED FOR PROTECTION FROM THE IOO-WAR
W JJJ
I` /
STORM. MINIMUM FINISHED BOOR ELEVATION ABOVE THE
CCC
l
6
I 100-TEAR WATER SURFACE IN STREETS, CHANNELS. DITCHES,
W
a
SWAlES. OR OTHER DRAINAGE FACILITIES AS ILLUSTRATED BY A
20 AINAGE MASTER GIRMING PLAN ARE TO BE SHOWN.
(�
EASEMENT 2. ALL SPOT ELEVATIONS DEPICTED ARE FLOWUNE UNLESS
OTHERWISE NOTED.
I
iI
16' ONE ESMT J. ALL CURB AND GUTTERSHALL BE 'OUTFALL LURE MO GUTIF'
I
>i
BK. 102.P.421 UNLESS OTHERWISE NOTED.
i 4. A MIN SLOPE OF TO BE ALONG THE ROW DNE
TERPROVIDED
OFALLCATCH CURBRB MD GUTTER AND 1.5%ACROSS ASPHALT
VE
PAYNT. THE MAXIMUM SLOPE ON ASPHALT SHALL BE SS
O
1F'
5. EXISTING UNDERGROUND INSTALLATIONS AND PRIVATE UTILITIES
SHOWN ME INDICATED ACCORDING TO THE BEST INFORMATION
I
AVAILABLE
o
TO THE NGINEER. THE ENGINEER DOES NOT
GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERMCE
p
S
LINES (WATER, POWER, GAS. STORM DRAIN, SANITARY SEWER,
m w
---
PHONE. TV) MAY NOT BE STRAIGHT UNES OR AS INDICATED ON
THE PLANS. THE CONTRACTOR SHALL CALL ALL UTILITY
COMPANIES BEFORE EXCAVAnON FOR EXACT LOCATIONS,
4
6. ALL WORK TO BE ACCOMPLISHED IN STRICT ADHERENCE WITH
I ALL LOCAL ORDINANCES. CITY OR STATE.
11
20' UTILITY, Df1AINAGE, \ El'� ,.,...-u-% \ K MATCH EX. 1 ]. CONTRACTOR TO COORDINATE ALL WORK WITHIN PUBLIC
h ACCESS EASEMENT \\ .i' m�- n SIDEWALK GRADDEE4� ..11 _-_--4959 1 I I RIGHT-OF-WAY WITH THE APPROPRIATE UTILITY COIPMIES
N. EDGE OF 30' ,p_- `\\\ .F -
/ IRRIGATION EASEMENT— _ - - _ \
H - B. CONTRACTOR TO PROVIDE A MAXIMUM SLOPE OF 2% IN ALL
_--- ---� DIRECTIONS WITHIN HANDICAP PARKING AREAS
1 6T OPS FOURTH
_ __ _ _ - __ •� \ 9. HHUNG BY M NGNEERINGE UnLITY PLAINS FOR AFOR ADDITIONAL MONY SCHOOL NRFORMATION. i
f _ - _ ----- --- l w
---J i _------ -----------
____ �_-_---_--_—__-_—_-_-_--__ w
IRmc na+DRc €suT i I ____
y REQ. NO. /018541 l __-15-UTILITY_ __---____--_-__- _.__------- __-_---.-__ -- - O \
- EASEMNT.__-----_-_---__--
/ - - 15 UTILITY EAS�Y�NL
\-- -------.---__-
CD
_----
0-__--p/= ...
-_- /--_-- 1 __------�W!/- --qNJ----OHU---d/U-===AZ-�-`..-Q,/R/-1�- �V'+ --_ -
_..- ---- D 20 m
\ �\ ______--_ ____ - o
' _ SCALE: 1 - 20' \ O ¢ U
\ _ 1
\ _____ _
\ ___-Y __ _____� i _______________ ________
r1____ _______I_ _________
i I
I
RECORD SURVEY
AS OF 05/31/07 AS -BUILT LEGEND
/1Rl/tl) AS -BUILT EVELATION
SURVEY TOLERANCE_ 30.02-
NOTE: REFER TO SHEET 12A OF THE HARMONY SCHOOL SHOPS 4TH FILING
UTILITY PLANS FOR TEMPORARY GRADING AND STORM PIPE INFORMATION.
Z � Y Y
> m o
U
1n
m Z
O W
tY <
Q
CL C) Q �� O
In 3 > O
N j 4k
00 W Lo W
= 0 0 O W
N = O O O
d
0Z x
Q J_
2 LL
SHEET B OF 13
" NO. 39347.07