Loading...
HomeMy WebLinkAboutLot Certifications - 02/09/2009 (2)Utilities electric • stormwater . vvaste�vater • water City of Fort Collins Date: 1- 27- Zoog_ CERTIFICATION OF LOT GRADING Pursuant to City Code § 26-544 and City Land Use Code § 3.2.2 (e) Permit Application No. 3aisc33: �S Address: Lot: Z Block: Subdivision: Horryxog Ter1N.�y Park: 3rd F; ;r. 9. Z% (,(Print) K{n a Colorado registered professional engineer, verify that the above referenced property in the City of Fort Collins, Colorado, has been inspected by me or someone under my direct supervision, and verify construction of all stormwater facilities and grading is complete, and the elevations and drainage patterns shown on the attached drawing(s) which were developed from a survey performed on (Date) 11- 25- Zo o g ,accurately and truly depict the elevations and drainage patterns as they existed on the date of the survey. Based on this information, I certify that (check one): ❑ The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). SEE NOTE. a The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached):, In my professional judgment the elevations and grading of the lot as constructed is functionally adequate and will allow for stormwater drainage consistent with the approved drainage plan. SEE NOTE. ,,...�.. — B �2 9 y: � s i (sign ture, PE stamp) s � � 295o F Aar,r..om;� M, S.n:Are 23010 For} Coii,�, COI BoS2- ,� ` (address of signing party) NOTE: A COMPLETE certification mus be submitted, including but not limited to drawings of the lot/site showing the approved design and as -built surveyed elevations of all structures, drainage and grading features (e.g. swales, retaining walls, lot corners), written information/explanation of discrepancies, etc. to: Fort Collins Utilities (970) 221-6700 700 Wood Street Fort Collins, CO 80521 At Least Two Weeks Prior To Requesting A Certificate Of Occupancy For The Property Rev. 111106 v Stantx convening Inc 209 South Meldrum Street Fort Collins CO 80521-2603 Tel: (970) 482-5922 Fax: (970) 482-6368 stentec.corn .aaua nava. July 1, 2008 Brinkman Construction 1315 Oakridge Drive Fort Collins, CO 80525 Attention: Mr. Bob Papish Reference: Harmony Technology Park Third Filing: Pond Volume Verification Bob: Stantec has completed a survey of the detention pond within Harmony Technology Park Third Filing. This letter is to inform you of the available volume for detention. The table below is a summary of the available and provided volume. In Stantecs opinion the volume is within sufficient tolerance and acceptable for adequate detention. The does not relieve the owner of completing a drainage certification after project completion. Design As -Built Design As -Built Over Flow Pond # Volume Volume 100 YR WSEL 100 YR Structure AC -FT AC -FT FT WSEL FT Elevation FT 110 7.98 7.86 4904.27 4904.33 4906.50 bnoula you nave any questions or wisn to alscuss mis to more aetan, please tees tree to call. Sincerely, S7/1 T CON.' TING INC. %/ /]. fN Tel: 970-482-5922 Fax:970-482-6368 avAllkomm@stantec.com cc. Mark Melchi, MAVDevelopment Joe Schumacker, GLH Construction r, �ip3/7 f 9 I SCOUR STOP 4' LONG X 4' WIDE INSTALL PER MANUFACTURERS RECOMMENDATIONS i 8.41 FL 8.93 FG 9.73 ° °; 0 49 9.49 L 9I Q Q � / d e -1-.61Y. ° 4910.0o ;4 . / <.. 9 s v 210/( a a$ ° 95 ° O ..Q ° OA ss:is ._ : . 11",.. a 128 LF 12 SCH-80 F an �._o ..4 ° 48" STORM MH ' °°. Q ° .Q RIM 4909.69 Q.. I: END 0t. WAU "? '. °. 44s01�y° 4905.21 °TOW 4909.5� �° , [ .'"° e ° : a . FL° 4908.91 °°. ° , °°d .Q °, : ..° '105 LF 12 .°- _° °,-a ;a4 PVC ®0.4% 9.59 FL, .... . 10.424FG ° 1 ° ° a: p7. 49°9.76 " 7 ° °. .� c: O 4 4 . ° � G °. -Q 4. O .° .°4.IQ.. D 2.1% a9 9.7 49 8.98q r .4 9.82 FL ° 4909.6°7 ° OW a9 9.68 10.40 FG ° 4 { 9.68 FL 4 4 q ° d $ CLEANOUT WYE RIM 4909.13 49Q8. 7 Q INV 4904.79 �I IIS. L 11% EXTEND ROAD BASE 11 8.75 FL \ \\\ 2' BEYOND PROPOSED _ \\\ \ \\\CONCRETE x � LF. 12„ \\\ 8.48 FL 5�, PVC 47.11 X( \ ---- i0 \\\ x !T 7.11 FL 7 FL _ __ - _ _ - 8.17 FG ` _ 7.16 2.oao 2-° }a9 LOT 3 / °I 9.J3 I 9 .7 . ' I ° I 4 8.56 a 9. 9 FL 8.41 FL El -0 °° 9.44 FL 84 FL 2' CURB OPENING SEE DETAIL ° a 4 4s 47 4s 9. 0 SHEET C-501 as 8.48 49 9.6 49 9.43 49 8.87 n 44 O 0) 4sQ9.40 8.78 FL 49 8. 5 19.38 / - .a 8.36 FL Cf 9 65 FLFL /4., 499.�6 0 98.18 r 0I 7 FG SCOUR STOP _ /IF 4' LONG X 4' WIDE INSTR MANUFACTURERS ECOMMENDATIONS N8.90 4 4 ' r•/ 8- 9.24 FL IllxtyZ I 9.87 FG l� I 4s48.24 I 111 l 11 /// / 7.16 FL 7.89 FL 49Q7.95 -49 Q7.92 2' CURB OPENING /\ ' —91 EXTEND ROAD BASE 2' BEYOND PROPOSED CONCRETE Stantec Consulting Inc 2950 E Harmony Road Suite 290 ^ Fort Collins CO / 80528 ' Tel: (970) 48282-5922 Fax: (970) 482-6368 StantK January 27, 2009 Mr. Jay Barber Fort Collins Stormwater Utility - 700 Wood Street Fort Collins, Colorado 80522 Re: Grading Certification for Harmony Technology Park 3`d Filing Lot 2 Dear Mr. Barber: The purpose of this letter is to certify that the grading of Lot 2 of Harmony Technology Park 3`d Filing is in general conformance with the City approved drainage and grading plan with several minor exceptions. Northern Engineering visited the site on November 25, 2008, to record spot elevations of building corners, drive isles, and the parking lots. Northern Engineering again visited the site on January 27, 2009, to record spot elevations of the lot corners and the building finish floor. Stantec Consulting Ltd. reviewed the topographic information provided by Northern Engineering. In general, the recorded spot elevations were within acceptable construction tolerances. However, several recorded spot elevations were outside of acceptable construction tolerances. The most significant of these areas was east of the trash enclosure along the south wall of the truck docks. Elevations differed as much as 0.38' from the approved utility plans. The contractor indicated that the grading was altered due to modifications to the trash enclosure and input from the client regarding operation of the truck docks. The basic drainage concept as depicted in the approved utility plans was not modified and no adverse effect is expected. Stantec Consulting Ltd. visited the site on Monday 26, 2009, to inspect grading, drainage patterns and landscaping. Landscaping around the building does not appear to interfere with the proposed drainage patterns. No low spots were observed in the landscaped areas, drive isles, or parking lots. Additionally, no cross lot drainage to or from adjacent lots outside of drainage easements is expected. This certification is signed and stamped by a professional engineer registered in the State of Colorado. By signing this certification the engineer attests that to the best of his (her) knowledge the surveyed grading as shown in the enclosed certification is in compliance with the approved grading plan for this lot and subdivision as shown on the approved utility plans. C:\Docurrents and Settings\jziliak\Local Settings\Temporary Intemet Files\OLK7D\2009-01-26- Grading_Cert.doc Stantec Failure to disclose all known information could result in the rejection of this certification and could cause the withholding of the certificate of occupancy for this lot until corrective action has been taken. Thank you for your time and consideration of this submittal. Sincerely Yours, Stantec Consulting Ltd. • 34518 w Ken Matthews, PE Project Manager cc: Bob Papish, Brinkman Construction File att: Grading Certification Form Record Drawing Exhibit C:\Documents and Settings\jziliak\Local Settings\Temporary Internet Files\OLK7D\2009-01-26- Grading_Cert.doc