Loading...
HomeMy WebLinkAboutSite Certifications - 05/15/2008BE Y O N D E N G IN E E R ING December 10, 2007 Mr. Basil Harridan City of Fort Collins Stormwater 700 Wood Streetf P.O. Box 580 Fort Collins, Colorado 80521 SUBJECT: Front Range Baptist Church Detention Pond Dear Basil: /� lowyf�/1� The detention pond as described further in the Front Range Baptist Church Final Drainage & Erosion Control Study by Nolte Associates Inc., dated February 23, 2006 (referred to herein as Drainage Study) has been constructed. This Certification Letter and the attached exhibit present a summary of the survey data performed on November 30, 2007 of the detention pond only, it does not serve as a general grading or utility certification for the Front Range Baptist Church. The table below summarizes the design volume and survey volume of the detention pond system. It should be noted that orifice plate dimensions are approximate as the grate on top of the outlet structure could not be lifted. Total Release WS Spillway Top -of- 100-year 100-year WQ Top of Required Rate Elev. Crest Elev. Berm orifice orifice Elev. Outlet WQ Plate Volume And lengthElev. inv out late size Box acre- C S C S t ft ft in ft 3 rows, 1 Drainage 1.78 1.09 5002.09 5002,25 @ 5003.25 4999.01 5" 5000.21 5002.25 column of Study 40 15/16" diem Assuming a required storage of 5002.25 — 5000.21 3 rows, 1 As -Built 1.of acre feet and a release rate 5002.45 @ 5003.14+ 4999.05 5" (top of 5002.20 column of of 1.09 cfs, 12.1yr WSEL= approx 40' concrete) 1" diam 5002.14 Based on the survey, the as -constructed detention pond has the required volume (elevation 5002.14) at an elevation of 0.05 feet higher than design (elevation 5002.09). However, there was additional design volume up to elevation 5002.25. Therefore, the detention storage volume is in substantial conformance with the design. NOLTE ASSOCIATES, INC. - 1901 SHARP POINT DRIVE, SUITE A FORT COLLINS, CO 80525.4429 970.221.2400 TEL 970.221.2415 FAX WWW.NOLTE.COM ®PmtMmDaM mak.�N 100%P�t mionw (5v As the purpose of this letter is to verify 100-year detention pond volumes, it does not address erosion control. It should be noted that erosion control protection (including pond spillway protection) should also be installed, constantly maintained, and replaced if necessary. The following are photos of the pond taken on Dec Pond embankment, looking westerly from near outlet Looking northerly along eastern Swale near eastern property boundary Pond outlet Looking southerly along eastern end of pond toward outlet structure and spillway NOLTE ASSOCIATES. INC. 0 {'ItO m �m 111M1 ItYA Lt [-F PMF N:TCB0163\Drainage\Word\Dminage_Cerificatiog11 mdan_20071206.41oc If you have questions, please contact me at (970) 419-1338. Sincerely, Nolte so iat�s, Inc. Michele White, P.E. Associate Engineer Cc: Mr. Gary Gerrard, Gerrard- Excavating, 1739 S. County Rd 13C, Loveland, CO 80537 N:\FCB0163\Dmimge\Word\Drainage_Catifica ion_Hamdan_20071206.dw NOLTE ASSOCIATES. INC. ®FvnMm WPe ^rotle.iN �00%D.a mmnv FW 0 20' ao' ao ... .. 1 inch = 40 ft: ps x®We22� - AS—BUILTM. g11 N� x -_.x:. CONCRETE PAN +�.e xa� Be sM a x a "fix a A I . k I n� g� x W; x PROPOSED x - CONCRETE PAN " � X 1901 ASSOCIATES, INC. NO= SHARP POINT DRIVE, SUITE A FORT COLLINS, CO 80525 970.221.2400 TEL 970.221.2415 FAX W W W. N O LT E. CO M BEYOND ENGIN EERING TRANSMITTAL MEMORANDUM FROM FORT COLLINS OFFICE TO: Fort Collins Stormwater Utility DATE: 2/20/2008 700 Wood Street Fort Collins, CO PROJECT: FRBC ATTN: Basil Hamden NOLTE JOB # : FCB0163 The Following Items Are Being Forwarded: ® Attached via Courier Item - -- - _ As -constructed spot elevation plan A (13r0 b� � aS c^^ CK Remarks: Basil, Here's the plan that you rt building indicating that dr, pond shots but that informs them to obtain a C.O. Thanks C.C. yV M, ,� For Your Use El El El El El El El El As Requested El El El El El El El For Your Review El El El El El El UK- ' lot and around the I_o r'� plan. I included the __f this clears the way for By: Robert Van Uffelen NOLTE ASSOCIATES, INC. 1901 SHARP POINT DRIVE, SUITE A FORT COLLINS, CO 80525 970.221:2400 TEL 970.221.2415 FAX WWW.NOLTE.COM NOLTF_ BEYOND ENGINEERING TRANSMITTAL MEMORANDUM FROM FORT COLLINS OFFICE TO: City of Fort Collins Stormwater DATE: 12/12/2007 700 Wood Street Fort Collins, CO 80521 PROJECT: Front Range Baptist Church ATTN: Mr. Basil Hamdan NOLTE JOB # : FCB0163 The Following Items Are Being Forwarded Item ® Attached via US Mail For Your As For Your Quantity Use Requested Review Front Range Baptist Church Detention Pond Letter I 1 Remarks: C.C.: By: Rob V, ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ December 10, 2007 Mr. Basil Hamdan City of Fort Collins Stormwater 700 Wood Street P.O. Box 580 Fort Collins, Colorado 80521 SUBJECT: Front Range Baptist Church Detention Pond Dear Basil: The detention pond as described further in the Front Range Baptist Church Final Drainage & Erosion Control Study by Nolte Associates Inc., dated February 23, 2006 (referred to herein as Drainage Study) has been constructed. This Certification Letter and the attached exhibit present a summary of the survey data performed on November 30, 2007 of the detention pond only, it does not serve as a general grading or utility certification for the Front Range Baptist Church. The table below summarizes the design volume and survey volume of the detention pond system. It should be noted that orifice plate dimensions are approximate as the grate on top of the outlet structure could not be lifted. Total Release Spillway Top -of- 100-year I00-year WQ Top of Required Rate Elev. le v. Crest Elev. Berm orifice orifice Elev. Outlet WQ plate Volume And length Elev. inv out late size Box acre- t c s c s t t t in t t 3 rows, 1 Drainage 1.78 1.09 5002.09 5002.25 @ 5003.25 4999.01 5" 5000.21 5002.25 column of Study 40 15/16" diam Assuming a required storage of 1.78 acre feet and a release rate 5002.25 — 5000.21 3 rows, 1 As -Built of 1.09 CA, 100-yr WSEL= 5002.45 @ 5003.14+ 4999.05 5" (top of 5002.20 column of 5002.14 approx 40' concrete) 1" diam Based on the survey, the as -constructed detention pond has the required volume (elevation 5002.14) at an elevation of 0.05 feet higher than design (elevation 5002.09). However, there was additional design volume up to elevation 5002.25. Therefore, the detention storage volume is in substantial conformance with the design. As the purpose of this letter is to verify 100-year detention pond volumes, it does not address erosion control. It should be noted that erosion control protection (including pond spillway protection) should also be installed, constantly maintained, and replaced if necessary. The following are photos of the pond taken on Dec Pond embankment, looking westerly from near outlet Looking northerly along eastern Swale near eastern property boundary Pond outlet Looking southerly along eastern end of pond toward outlet structure and spillway NAFCB0163\Dminage\ Word\Drainage_Certification_Hamdan_2007I206.doc If you have questions, please contact me at (970) 419-1338. Sincerely, Nolte Associates, Inc. Michele White, P.E. Associate Engineer Cc: Mr. Gary Gerrard, Gerrard Excavating, 1739 S. County Rd 13C, Loveland, CO 80537 NAFCB0163\Dminage\Word\Drainage_Cenification_Hamdan_20071206.doc 0 20' 40' 80' t 1 inch = 40 ft. 0 �2$e $_ ___ —�_- - - AS —BUILT Nei�� % - a C❑NCRET,E PAN _ his x "six„ W aW X_ • --�g� _ _� — 5 x x. 5004 5 00 - P� x s xP P % $o 8z� xb az> - =2 PROPOSED CONCRETE PAN x a x a>X x „ , x a» x s x `> x x " x . Q) e x % o 7 x h x a sop x tS x xemd s x e x „ ^" x e m „> 8> a> x. x x tt x x x drip Me s O I g>� s x §> x s> m o es> 06 moo s002 x e x s> 'x o os R6 x x = Soot x A a s z x x p „ S 0 _ % - x x Rs R ft x 'x e x>�y eu e> gH x ` 1 % x 1 hi spz Re % e p�»x2� W 5003 R"e g_ gW x $F2 a a2 — x ; x R a _ DATE: 5/TIME: 7:31NE AM - FRONT RANGE BAPTIST CHURCH SHEET NUMBER SERVER: FCSI CSt SERVICE: NONE - PATH: N:\FC80163\CADD\ET\AS-GUILTS POND GRADING AS BUILT E T O 1 DRAWNG NAME: ET-POND-ASBUILT.DWG BEY OND ENGINEERING -- i PLOTTING VIEW: NONE - OF 1 SHEETS ,�, BFURP FORT ORNE BORE A FORT COL1M6, ta B06ffi JOB NUMBER DESIGNER: NONE PROJ. MGR: NONE - Y70.RELR400 TEL 07022MI6 FAX r xmmcoN - 'PREPARED FOR: FRONT RANGE BAPTIST CHURCH DATE SUBMITTED: 02/20/2008 FCB0163 0 20' 40' 80' Nd 1 inch = 40 ft. 8o �=_g22 go AS —BUILT C❑NCRETE PAN S> 4 ppp x BW �3 S � 8. QNQp� / I m R3 N m 'z w~ s° a> % % so I " % 8' o 0 % PROPOSED x CONCRETE PAN z $z% � x � s x o> x x �z o> % z o> x 9z N � 'o> \> % % % o/ > $ 50 % % % % �z ° o s °°W 02 e x x .4z oo X x Sr P p m Xz o> - >3 - �� $> XW oa C o> X L s 0o X 1 Iiix W \ v ° °� flz X - 'o> J L „G J la " x j( dF ° e 80 k> 9> N % o> - x gry>� 'o> vlN> % % X 1 ISO 9ii 's> % -_'_'-_- 5003 -- _" i " X aF o'c �5 s N NW -_:.._._ �eA N ". " x L x I?' 50ax; i i J DATE: 5/CSI TIME: 7: 31 NE AM FRONT RANGE BAPTIST CHURCH SHEET NUMBER SERVER: FCSI SERVICE: NONE O = PATH: N:\FCB0163\CADD\ET\AS-GUILTS POND GRADING — AS BUILT ET01 DRAWING NAME: ET-POND-ASBUILT.DWG B E Y O N D E N 0 1 N E E R I N 0 - OF 1 SHEETS ri K PLOTTING VIEW: NONE 'DESIGNER: NONE PROJ. MGR: NONE WI MW �FOW DMM BUDS A 970MU400 TEL uTUJMts FAX FORT COLLINS, 00. 8N25 WWWAMTECOM PREPARED FOR:. FRONT RANGE BAPTIST CHURCH DATE SUBMITTED: 02/20/2008 JOB NUMBER FC80183 - ns 210. �F so04 < 8 o9t, g6N mJ 6 $W 9il S0 %N �3 X 3 m> e» �2 % I { Y f AS—BUILT�8k e CONCRETE PAN s=P�� X PG P» PROPOSED x a> CONCRETE PAN "» x a o»X 8> " e» m _ X o> e> N % X e> % F o> X e> o> X o> > �> e» o e> 'NN x X Q% o.>n nH ] X e> e> % o> s oo X e X e> x o 1 C.Q V i o> NI✓ x e o 1.1 oW X 1 Q X P " - sk 5003 W .-- a �- -- --._ re "4 o"c oW oW ''�xR p X oc m ' x._g - — x x �j( y p.. Y J 'om ^_- m^ =6 8.��n �"oW \ m o AM DATE: 5/TIME: 7: 31 NE FRONT RANGE BAPTIST .. - CHURCH - SHEET NUMBER � SERVER: FCSI CS1 SERVICE: NONE _ �O � PATH: N:\FC80163\CADD\ET\AS-BUILTS - POND GRADING - AS BUILT ET 01 = DRAWING NAME: ET-POND-ASBUILT.DWG B E Y O N D E N 0 I N E E R I N O '- PLOTTING VIEW: NONE DESIGNER: NONE PROJ, MGR: NONE *01 0" MIT DM BRIE A. WOY2t2100 Ta 6Torn2aa FAx FORT COLUNS, CO. 80625 ■N�BJIOLTECg1 OF 1 SHEETS PREPARED .FOR: FRONT RANGE BAPTIST CHURCH - DATE SUBMITTED: 02/20/2008 JOB NUMBER 2IL_ I FCB0163 PROP SE BUILDING, , . / LYX/RI \ \� R m a RPROPOSED R•••%.� \ \ 11 \ i ^ I x \ CONCRETE PAN • 4 \ \\ ^ u ASS NCCY/UR I Q SS I I\ •e� I- R � � S & �q\ R �� ��N � 1 \I \11111 Ll S 1 < < 7 i 1 loch - EE !l NOLTE FRONT RANGE BAPTIST CHURCH PARKING LOT AS -BUILT B E Y O N D E N B 1 N E E R I N B NN NWP PONT METE BRIE A FORT COUN CO. BOBM uEBne'BB M f]OPBI@NB FU E1NN0.TECAN PREPARED FOR: FRONT RANGE BAPTIST CHURCH DATE SUBMITTED: 02/20/08