Loading...
HomeMy WebLinkAboutSite Certifications - 03/29/2000STEWART&ASSOCIATES Consulting Engineers and Surveyors March 29, 2000 Mr. Jay Barber Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Dear Jay, re: Fox Creek P.U.D. First Filing, Phases One and Two All of the drainage facilities for Phases One and Two of the Fox Creek P.U.D. First Filing have been constructed in compliance with the approved plans. The detention ponds were constructed in 1994 and were surveyed to verify the volume. The drain swales through the open area tracts were completed in 1996 and were surveyed and certified as to compliance with the approved plans. The curbs, streets, catch basins and storm drain piping system were all installed by 1996 and are constructed per the approved plans. I recently inspected all of the storm drainage facilities and found them to be according to the approved plans. Please call if you have any questions. Sincerely, $ eQ Phillip I. obinson, P.E 45 � 2 PIR/meh A g James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 970/482-9331 Fax 970/482-9382