Loading...
HomeMy WebLinkAboutSite Certifications - 05/30/2000 (3)R,JL SURVEYS 113 Cameron Drive, Suite B Fort Collins, Colorado 80525 Tel: (970) 226-3007 FAX: (970) 226-3027 I ,' p, S � May 25, 2000 Merle Busch Ranch Builders, Inc Merle, lb a p WoL boto h On May 24, 2000, a field crew from this office performed an as -built survey of the concrete drainage pans and sidewalks, around Building_ Four of The Four Seasons -Condominiums in Fort Collins. The results of said survey are shown in red on the attached sheet. These findings indicate that the concrete was placed substantially in conformance with the sidewalk revision by the Sear -Brown Group, dated May 18, 2000 with minor discrepancies noted. Please let me know if we can be of further assistance in regard to this matter. Sincerely,` Rick Lewis, P.L.S. BUILDING FOUR: SIDEWA 1 11 =20' APPROVALS: DATE LK REVISIONS NOTE: REFER TO THE NORRIS DULLEA CO, PLANS FOR LANDSCAPE INFORMATION JOB SUPERINTENDENT: RANCH BUILDERS (ry e) 1/< - A:5-b",,I�- c1eya--,4'011 r7 I-ed /-v 0001K 0 X5,cl (LAI W Pi �ojje HERE ff BUILDING FFE10.40