Loading...
HomeMy WebLinkAboutLot Certifications - 11/14/2012 (5)ADVANCED ENGINEERING, LLC STRULMURAL DRAINAGE DRAFTING OVERLOT GRADING OBSMVATION / Site ObseivationDate: 11 8 2 Advanced Engineering, LLC Project Number SiteObservationby ClientNeme•L- rt-- « ^-aww',e.r �gAa Site Address• 3" o Irv=� -r SOIG,,.u. LDM" Site Legal — Foss Site Plan and/or Grading Plan by f�4¢TTF144.4 Ent t, re S,Ics 4 r- r 02- 00 .00 DVI-0 0 /7trt.s.f 17iLv3707 o We have observed portions of the above referenced site. During our our representative measured the relative elevations at the lot aides and comers, top of f aidation, and lowest openings. The observed elevations were compared to the Site Plan and/or Grading Plan referenced above. Based upon our findings it is our opinion that The elevations as measured are in general conformance with the above noted Site Plan -and/or Grading Plan. The elevatioms as measured are in general conformance with the above noted Site Plan and/or Grading Plan with the following exceptions: It is our opinion these exceptions, as noted above, should not adversely change the grading scheme as shown on the above referenced play a1 During our observations our representative noted that the as measured elevations do not conform to those indicated on the above referenced Site Plan and/or Grading Plan. However, it is our opinion the Wades as measured should provide an adequate substitute to the above referenced grading scheme (see comments below). X See the attached "As-BuW grading plan. The elevations measured are not in conformance to the above referenced Site Plan and/or Grading PLm. Deficiencies include: Other rnmmnnta anti/ix nhcan.vfinnc• Limitations: It is our opinion the above referenced site, as graded on the observation date, should not imerfere with offsite flows unless the grades are changed or barriers are created such as fences, garden terracing, sidewalks, and/or any kinds pinng which may change the established flow patterns by divmtimg or slowing runoff flow. Backfill adjacent to the residence may settle over time, this settlement may allowponding to occur adjacent to the foundation wall& Toprevemthis.pondmgandreLrtedproblems, the backffUadjacemtothe residence mastba main imainedtoensure that rwwffwfflflow away fromthe frnmdaticm. The Wades measuredwere compared only allure abover6menced site plan and/orgradmgpLm. Other mmmiumm grading requirements which aoiat zn e,bg\ or by other construction document are beyond the scope of this report. '9�F 33739 Reviewed by: Jason E. Baker, P.E. 146 Barberry Place, Loveland, Corrado 80537 Telephone 970-278-1909 Fax 970-278-1910 °45- UILT° OVERLOT GRAD-ING 0 6ERVA ION6 LOT 10 SWIFT ADDITION TO FOSSIL LAKE PJUD. 92g 92.1 913 F- O C-r? 3 z 894 HP.'. 882 888 ga(� 89.0 x x x�� asZ 81.E 88.9• . - 1 x a88 8T.9 WAI. STS W.W.a9 0 893 893 1 aTo SSa PATIO O TF. = 893 wUl wall. 88 5 88.9 a6.4 lb 81.1 8'1.9 R GAR DOOR ", Sib Sbb (1�MVE 96.0 (BOWJ (Bo1llJ TBM-i C ON 853 GREEN SP_RRI ra pRIVE LEGEND: TF.= TOP OF FOUNDATION W.UL = TOP OF WINDOW WELL B.o.w. = BACK OF 51DEWALK Bo.C.tG. = BACK OF CURB 4 GUTTER T.BM: I = TEMPORARY BENCHMARK I H.P. = NIGH POINT OF SWALE ® - SEE ADVANCED LETTER I'l-11-02-08E DATED II/8/12 NOTE: DOWNSPOUTS 4 GUTTERS NOT IN PLACE AT TIME OF OBSERVATION r9weor av�: "'I-�-° ADVANCED Luxury Homes of N. CO IVl2/12 1121 Green Spring Drive, Ft. Collins, CO V 3m1 ENGINEERING, LLC STRUCTURAL DRAINAGE DRAFTING -' CPH 146 Bw RW Fl . LCV6 0. CcLO D9 60537 1 91 I T�c 970-378-1909 Sacs. j'�' SI�F3 oZ- 009,00 �1+ IAA--rE.D Y, o d 3