Loading...
HomeMy WebLinkAboutLot Certifications - 01/12/1996 (3)11 January 11, 1996 Revised January 12, 1996 Mr . Glen Schlueter City of Fort Collins Stormwater Utility P.O. Box 580 Fort Collins, CO 80522 Dear Glen, STRUCTURED ENGINEERING 318 East Oak Street Fort Collins, CO 80524 (970)-495-0810 1I z4o'�,( Ole-� p,z C. 0. A field investigation of lot 1 of Greenbriar Village _2nd-Filing shows that the drain pan has been constructed along the rear of the lot according to plan and it is in good condition. Enclosed is a plot plan which shows finish floor and spot elevations around the lot depicting final grading. Plotting those spot elevations on a piece of the grading and drainage plan (also enclosed) reveals the house was actually built higher than proposed. This results in even better positive drainage away from the dwelling than was called for. The slope to the drain pan in the rear is approximately 4: 1 and the runoff quantities anticipated to be collected in the pan will not leave the drainage easement provided. Therefore, in our opinion, finish grading meets or exceeds the intent of the grading and drainage plan. The elevations were obtained with a hand level. Please let me know if there is anything else you need from me. Very Truly Yours, Joseph P. Marcisofsky, P.E. Structured Engineering Enc. STRUCTURED ENGINEERING 318 East Oak Street Fort Collins, CO 80524 (970)-495-0810 January 11, 1996 Mr . Glen Schlueter City of Fort Collins Stormwater Utility P.O. Box 580 Fort Collins, CO 80522 Dear Glen, A field investigation of lot 1 of Greenbriar Village 2nd Filing shows that the drain pan has been constructed along the rear of the lot according to plan and it is in good condition. Enclosed is a plot plan which shows finish floor and spot elevations around the lot depicting final grading. Plotting those spot elevations on a piece of the grading and drainage plan (also enclosed) reveals the house was actually built higher than proposed. This results in even better positive drainage away from the dwelling than was called for. In our opinion, finish grading meets or exceeds the intent of the grading and drainage plan. The elevations were obtained with a hand level. Please let me know if there is anything else you need from me. Truly Y, 9 Jo0ph P. Marc Structured Engi Enc. Z1 I-rlu- I�GM_1 ,f 111 �e -C _J 7,144 ILAMetLoT 1 3 �r.1LF-'I•�Tn�• QR1;MIt.IM HoMFS 4�04 IJP�+fkM Lf. �or'T ccN.ltilS� m �o�� C-Af S-5 gi q ,r 6 4.'] 7' �--7 5-(5�95 w.o. 95(o) UF;� 6,f�,57 - RICHMOND ASSOCLI TES Arel�l ieeL�Plannei-s L'OT -�Z. Qjlt I L.i�l 1.1 Lr t411'r 04 '� �/ ` OJ�