Loading...
HomeMy WebLinkAboutLot Certifications - 05/14/1996a — FOUNDATION II Consulting ENGINEERING Engineers, Ltd. May 9, 1996 Commission No. 2658-01-13-03 C & C Peterson 3343 Oregon Trail Fort Collins, Colorado 80526 STORMWATER RECEIVED MAY 13 1996 02 C - 0 RE: Lot 57, Ir Greenb.riar Vi1lag.e=S� (524 Fox Glove Court), Fort Collins, Colorado Gentlemen: We have measured the relative elevations at the above referenced address. During the investigation, we measured elevations at the lot sides and corners, top of finished floor, and the center of the back yard. The slopes and elevations as measured are in substantial conformance with the FHA grading plan completed by Structured Engineering, Inc., Job No. 9301-2ND, dated May 3, 1994. It is also our opinion that the concrete swale to the north of the property has not been affectedbythe construction of the residence. If you have any questions, please feel free to call. Respectfully, Cliffor P. Ha M.S. Environmental/Earth Sciences Specialist Reviewed by: Ax� Kevin W. Patterson, FOUNDATION ENGINEEF CPH/j le ENGINEERS, LTD. 100 East 3rd Street . Loveland, Colorado 80537 • (970) 663-0138 • Fax (970) 663-1660 515 Main Street, Suite C • Longmont, Colorado 80501 . (303) 702-0661 67 3 fc Swap Swale s/ope . 6.9 Swale SCALE: I"= SURVEYED: 5-7- -7-96 / 67.6 68.0 68.4 68.1 68.2 67.8 TOP OF FINISHED FLOOR 67.5 70.0 f 67.6 67.6 (Back of Walk) 68.2 - � 672 67.0 Bench Mark • (Back of Walk) REVISED GRADING PLAN LOOT 5Q--GREENBRIAR P.U.D. 2ed'F1 LING FOUNOA.- r N CONSULTwG FORT-COLLM3,COLORADO ENGINEERI_gNG ENGINEERS A STRUCTURAL FOUNOTION�--ANO SOILS ENGINEERING LOVELAND 683-0138 COL0nA0O