HomeMy WebLinkAboutLot Certifications - 05/14/1996a —
FOUNDATION II Consulting
ENGINEERING Engineers, Ltd.
May 9, 1996
Commission No. 2658-01-13-03
C & C Peterson
3343 Oregon Trail
Fort Collins, Colorado 80526
STORMWATER
RECEIVED
MAY 13 1996
02 C - 0
RE: Lot 57, Ir Greenb.riar Vi1lag.e=S� (524 Fox Glove
Court), Fort Collins, Colorado
Gentlemen:
We have measured the relative elevations at the above referenced
address. During the investigation, we measured elevations at the
lot sides and corners, top of finished floor, and the center of the
back yard. The slopes and elevations as measured are in
substantial conformance with the FHA grading plan completed by
Structured Engineering, Inc., Job No. 9301-2ND, dated May 3, 1994.
It is also our opinion that the concrete swale to the north of the
property has not been affectedbythe construction of the
residence. If you have any questions, please feel free to call.
Respectfully,
Cliffor P. Ha M.S.
Environmental/Earth Sciences Specialist
Reviewed by:
Ax�
Kevin W. Patterson,
FOUNDATION ENGINEEF
CPH/j le
ENGINEERS, LTD.
100 East 3rd Street . Loveland, Colorado 80537 • (970) 663-0138 • Fax (970) 663-1660
515 Main Street, Suite C • Longmont, Colorado 80501 . (303) 702-0661
67 3
fc Swap
Swale s/ope .
6.9
Swale
SCALE: I"=
SURVEYED: 5-7-
-7-96 /
67.6
68.0 68.4
68.1
68.2
67.8 TOP OF FINISHED FLOOR 67.5
70.0
f
67.6
67.6
(Back of Walk) 68.2
- � 672
67.0 Bench Mark
• (Back of Walk)
REVISED GRADING PLAN
LOOT 5Q--GREENBRIAR P.U.D.
2ed'F1 LING FOUNOA.- r N CONSULTwG
FORT-COLLM3,COLORADO ENGINEERI_gNG ENGINEERS
A
STRUCTURAL FOUNOTION�--ANO SOILS ENGINEERING
LOVELAND 683-0138 COL0nA0O