Loading...
HomeMy WebLinkAboutSite Certifications - 01/20/2016 (3)COMMERCIAL, MULTI -FAMILY AND SUBDIVISION CERTIFICATION FORM & CHECKLIST (Overall Site Drainage) Global Village Academy Phase 2 (Project Name) December 28, 2015 (Date) SPA150001 Wiof t` Collins (For Cam mercial or Multi -family, please list any applicable building permit numbers) Pleasefill in all applicable items in this Certification Form for Commercial, Multi -Family and Overall Single Family sites. A copy of the approved grading plan must be submitted with the as -built grading plan. (It is preferred to have the as -built elevations written in red next to the approved elevations) Use "OK" for items checked or actual numbers for items verified/surveyed in thefield. Use "N/A" for items that are not applicable to the site that is being certified. Please provide an As-Buift Reclined or Mylar drawing showing the following: A. Detention, Drainage Facilities, and Common Open Spaces 1. Pond Certification OK Provide Topographic Records (grading certification with as -built spot elevations) and Volume Verification Calculations. Show both the proposed and as -built elevations on the same plan sheet. OK Provide Pond Cross -Sections and Spot Elevations (especially @ Pond Embankment and Pond Flow Line) N/A Positive Fall to Pan (if applicable) L General Pond Grading including all Side -Slopes N/A Invert Elevation OK Forebay Construction and Elevation The existing forebays that were constructed during Phase 1 were removed and replaced per detail specifications. N/A Spillway Weir (Location, Elevation, Height, Opening Width) N/A Placement and size of riprap or alternative permanent erosion control measures N/A Orifice Plate and/or Water Quality Outlet Structure Installation N/A Water Quality Capture Volume (Volume Required, Volume Provided and Water Surface Elevation) N/A Berm and Embankment Compaction Level N/A Subsurface Media for Water Quality Ponds and Swales 12/12/2014 Revision - Page I of 2. Swales N/A Location N/A Dimension and Cross -Section Verification N/A Longitudinal Slopes and Side -Slopes N/A Spot Elevations N/A Permanent Erosion Control Measures (drop structures, riprap, lining) N/A Tie-in to Storm Lines, Pans, Curbs, or other appurtenances N/A Required Minimum Freeboard, Provided Freeboard NIA Landscaping Infringement on Flow Line 3. Pioes See Sheet C1.1 for Storm Drains OK Size and Type OK Slopes (As -Built and comparison to 0.4% Minimum) N/A Pipe Capacity Calculations (if slopes are significantly altered from design) OK Invert Elevations N/A Installation and Backfill N/A Cover N/A Encasement and Clearance from other nearby utility lines N/A Joints Type and construction 4. Concrete Pan Channels See As -built grading plan OK Size OK Slope OK Cross Section OK Thickness OK Elevations City of F`rtCottins `�� 12/12/2014 Revision - Page 2 of 5 5. Inlets Inlets were installed during Phase 1 construction N/A Size and Type N/A Size of Opening (or name of Standard Detail used) N/A Grate Elevation N/A Invert Elevation N/A Box Size 6. Street Cross -Pans N/A Size N/A Type N/A Grade N/A Elevations N/A Cross -Sectional Depth N/A Tie-in to Curb and GAer 7. Culverts Culverts were installed during Phase 1 construction N/A Size N/A Type N/A Invert Elevations N/A Headwalls or Wing Walls B. Sub -Drains OK Size OK Type (Perforated/Solid) OK Cover OK Backfill fiof t` Cins 12/12/2014 Revision — Page 3 of Fott Collins OK Geo-Textile Liners OK Clean -Outs 9. Curb Cuts OK Size N/A Tie-in to Swale, Pipe or other appurtenances 10. Common Open Spaces See As -built grading plan OK Overall grading contours of open spaces OK Spot elevations adjacent to private lots (property corners) B. Low Impact Development (LID) Certification 1. LID Technique Specific Checklists (see attachedl OK Permeable Interlocking Concrete Pavers (complete if technique utilized on site) N/A Bioretention Cells (complete if technique utilized on site) C. Grading Certification 1. Certification of Grade Elevations OK Minimum Opening Elevations OK Top of Foundation Elevations N/A Comparison to 100-year Water Service Elevations N/A Comparison to Freeboard Elevations and Base Floodplain Elevations- BFE 2. Verification of Site Grading • Engineer to evaluate site grading compliance with the approved grading plan. • As -built elevations areto be reclined onto the approved grading plan sheet showingthe as -built spot elevations next to the design spot elevations so compliance can be verified and documented. 12/12/2014 Revision - Page 4 of 5 Fort Collins D. Post -Construction Site Cleanup 1. permanent BMP Measures OK Construction Debris. Clean —Up (In particular debris affecting the drainage) OE Smoothing of Ruts in all Construction Areas OK Reseeding of all Areas Affected by Construction Activities (Usually enforced by the City's Erosion Control Inspector but the engineer certifying the site needs to notify the contractor if areas are not seeded). Establi4hrnent of hydroseeding along Taft Hill has yet to occur. Onsite erosion control appears to meet criteria. E. Statement of Compliance This certification Is signed and stamped and by signing this form the Engineer(s) attests that they have inspected the site and to the best of their knowledge the as —built conditions of the drainage facilities are as described In the above form and In the As —Built plans enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificatesof Occupancy within this development. F. Shnature and Stamp by a Colorado Registered Professional Engineer Engineer's contact information: Brian J. Campbell. P.E. (Name) bca m ob el I P Iva Iva.com (Email address) 303-565-4883 (Telephone number) JVA. Inc. (Company Name) 25 Old Town Spuare Suite 200 (Company Address) PG STAMP 12/12/2014 Revision — Page 5 of i Y d V a E C3 q t cl G v s 7 O C o A dQaQ 3<<<< u a a a ¢ a z Z aZZZ ZZZZZ y Z Z q o s " tu A w� W Jwwwww ¢ �+ C C>-}} }} }} CQ u O U D to ro c > c v v i 3 i �t a 3 � Y U c c U by U a C Y ctl N C 4! E > � •� L Y 'i. -O N 7 N N U b N •C 'O N '� t"n Cp 4�. U c o u v c o.0 3 a o °q m N c a cd Ubc .DCL A O a F Y U N 'Y N a O U 2i �C yo .. d O Y O >� v a m o o o• v E •rn op m N� ± y '� s ox o 3 a_ � c° C .E v s W w u v U o y c v a 3 0 Y •E w° o a N S o u (tt.1 a >, E F° U U U N U F E N F F N O U Ui N F •O 'y F_ C C U id .0 U N N a3 N t_ Z D 4� O G v E •E 0 O td S U o E x• Y N € N v AcGw 0 0 o O Y N �+ O eN+ = O �d '0 cG t0 " r 0 onv W 1 �-. N N tr N v d F ttl GJ o.E E E E¢ F �¢UU�a5 C C G 9 mmv' so 6 I I O,,N ❑ 2 - -1 r j BRONSON STREET 59' RIGHT OF WAV RKRII a -YAP CI MEW -�3 - -- .I R.}jNQ I HKYF- R(NTC EvirwG \ WHD I I T3nR SaN1Y CaRSINKT IT/ vxAs(P Puri r / A� •'' 15rN40FDe I i I .226e TEE rEK V10N IXu1-. OR AyCr HVI 'ilR 'd et+sfit �'� .2}2 ,221e - r �I PROPERTY ONE I, 11 ♦2211 I To f r I 7P VALLI. 1 IFrO R(YAN l\ }I- 21- I ]iM it �25 _ IV. M,111 Pi 16R 2 _ 1 I _ U, it �< 2A. D 7 r CEO Z 'D C_ 0 SLATERPAULL hord I coplan I macht IA 51. [k$IN6 r9apilET PROPOSED II' 1IG>LI If rRA'hl If AAm I1 BK UNE LN4 INE LAME N 4IX. r PE uAx a055 Yaf 1331 NlmeRlw 61YM P 303OEt p 77 DenvnY,CO. BOM2 vnw.WiRpeul.wm AI WAS 4aC 10 EXPANDED [451 --_ RATE aRNMN POO/ RAY PFID CONSMLTPM: EATSW Vµn AS. ALVWI IXM fUiRR N I®/NN I YM OSTO 1 WIPER SECTION A-n e ITS mOROYO (I PROPOSES 6l' PEAL[Aelf 6OADN0 PARR PA.NRIC WT AENM �rW m fc51 RE. STATE arrtR .I Yu salt TO WATERED aRNmR PRO/ _ PROJECT: GLOBAL VILLAGE 6w v PERFORATED WMRRM ACADEMY -FORT COLLINS - PHASE 2 sEcnoN B-B xfi NbMNaN Cameral TYfl 6 H0r6ebo01 PM CaBlu, CO - — 2 asR sa xi 9 ,V " 2 :j) IwP6�R Rd A 1 m of --rill— 1 I A OWL I— i I BIDG EXIST BLAG 3a ¢ ABDITIONI- FFE=5131.04 I - 1 f C7 m---- II y 1 fLd i 20 ss FL - R Sena }snR I E, 2 ,11r1 M4T4 61 ILL I I 1� 1 I i 6 uI q I I ---AAA��� I CpA0 fw 51Rff1 III RBIAF fYSINC = ' IYru.01(Y[NI$ YE1 T COMPLIANCE 6 ' PNAY i PWR 1 1 HORSETOOR. ROAR— - - - 100' RIGHT-OF-WAY EMT . r/ an a Tai W Wxs AARIC aFRA1WN5 aPJRABn. GENERAL NOTES- 1 .1 owusD D.R4. wing, a SAIVISM EYSW PAO`1 10 [RISnLCMI. AS WELL AS SWPST A!FRAIY,S CIIFflE NO 1L11Eg YSIROPEO. DAMAGED RI MOONED M 10 CCMIMI[MI a n4 PRESET, 41KL Y TERSER➢ CN RESTORED 10 On a TORT UTILITIES STN6N05 AT n ((. Op R'S STRESS, MOT 10 NE MRPTAFR a QYMRD S MPRMMOI 2 ,ns"I GONCRER Alb ASPnNT PANNC Srµy 6C SAW NE AIM K.0%0 PMM 10 E[CAVAMI K" (TARO lE $STEMMAS W IDJEES, NANI 3 EWRACIUR TO PROM µ1 Ma55ARY ERNM CT IIRa OURNC CM TRLCxOI PLACE ,RNM CONTROL PR02C11W AT ALL EXISTING .In CORNSA(AY TRW ME CMSPIKI. AREA. EROSM CMIR0. KOSTER. NMI K..' M MC, URTL CMSTRfCnUN IS 1.11, AND µl ES!AAD ERP I05 ADSWATTLY WUTATEO ON OMNRS A1T401AL TOR RNOV4 A COORNINAR DEV0.1nM Rf W IKWNIS LM1S a MISTRIAL S4VAQ IEYS PRORrnM OF ISMS 10 R,Yui. PRESS. RSCVY EM ON 0"', A TTCT [1gN[EM ALA,R a., N2AyDROI OR ryAENG RMY ALtlTNAAL aYWMx a PA1 EUT. TRIALS, L%TQ sIM1CTURfs, ETC ID W RR09FD As MOSARE11 Global Village Inlemational Schools A03AMpal BNd.UI13A AIYaTIr, CO BW 1T-3/33 0320r1s PROJECT NO: JVA#23371 Dftkm BY: DSI EARECIOED BY: in E,MRO BY: En sH nT GRADING AND DRAINAGE PLAN cto 61PiET ff 0 w 6 0`(n �r N rn G I I, r; " BRONSON STREET 54' RICR f OF WAY Mcm-W WAY 1 1,I II 1 1 1 1 jEns1Nc s1aM NRAw _ 1 / r WI.01'WW WAB WI W/ I i' RN RIM 00'MI I ' IPAX511M 04 .NMI-p-WAI I PL f0 SMUD PR W I] U C PUIf %C w ama' MV !I})}! YOW 16Ua•PK,WOSOF /I W/ aM[ COIINI� I X 1' RM M) } PK PP[ D. PPltl'rXlr v;i - II I MY lI}J'ID In' Q PVCI COIA IN rµl 10 PDVp / IXY W W I Inn Ir r R'M Prc Nasou rl l 51r]»(n' PK) l vDRY I 9t eR MADwNL - '; Mw(S)nWAW(e PM1 i eY 23 }a 22' n MV 5I23.10 1 t - - - '.r M REVOH MIND MW RM .WD P(PLAa W NV 51t)SY rLUM WM YMr v PUW XIIP. NP PIP n' wv 51}).2 / BY %MMn M51[ MAVARO uNRMµ IMI,I 6 rP[( TRW MaiYU 0[BTS PW PN M MDS BY XAMMt ADD R"NL PW blxe9O 1 6 g Mtt W[x MDS W 1x 10 µD THE SUPIAD IS WD lu1 O'Ui: AU nr M DOREEP NAWV NV 51^1901L' PLXI PKI i I / _ = 6 NV S l 0 B `K $pL M M AWA, PRE OIAOL UED, ",=123 3 AN] YNM RA WOIIC.NEINYS I r l }n II YPICw ICU2 r /�p9 .•�l , I W � 4 RD CO RD. Xo LW co WAR 5127 7 f Y 6'Ae' wrc' No, saW1s (n' PKI j ' I wv bN4M (6' vK) � ''1— 6•wv sl}A.5n n0� EGXME[l�—.LyySt_ ]Lfl 'Pow an5M - - MY 51216IW(6!xv V9'I �in--PKF _. IW U n' I'K a IYL't BLDG ADDITION FFE=5128.54 RD m1m.1 ., 5""D (R' "Al RNA5 Z I MWNAWMW A RIY v B) '.lx 01 Do aaWRlu11 1wv Slx. Jo MV SIMnA (P'PK)�� •1 .6U n'PK OI WS _ L 6'b' Wrf AD CN'WLCI a' My 51N n-1�� ��I S NY 51m C, Ixv 51N 90 (VPK) (n w U, r P. w a5'lt 2 RD WNEn r➢1 o Je WI D �BEIXF c ) _ r xv Wnm ( xv s+xs )e Is' m �r 1 t 9 FMt Ir PRE n' xv p 25,14 BLDG . .rcMnVLL51r251r.ryP)K Y NV 51208 AMMONeaxD v BDGEXIST �� rZ l T, ill PO m ir,. r WY DIN A N PW 512141 1 10' MY 5126.4, FFE-5131.04 V li n- PK a I.Wn _ 1 Q Nv vmn (Ir PK) I II i we'.x-Ln r I. m1,0 1. My 51I).W m _ , I E \ I /-w co I w/caxc ca. nx N fIryOJ I � -in li X' PI Ni nyl. a OIXIw �� I i YE LIEEI CI.O µW DO DR, smr 5 I � rvr 4 B 50n / I II I �. 64v 6'.6' I \ SIx590 �PK PR" MADWA, Y� W 114, 10 Pp10 wv MR) 51mm(N. l,, __- -1.IIN RM PKw.-..- _ _ P �____._ _ - 1 -- PM 51]1195 _--- MY an4(6'mr WK) _ HORSETOOTH ROAD .. _ 100 RICIIr Or WAY __. SLATE R PAU LL hordIcoplanI macht 1=1 NIXOWIOnN St..1 P 303.907.NT1 Denver, CO. ROM w aletec, ull.com GLOBAL VILLAGE ACADEMY -FORT COLLINS - PHASE 2 NWWlweet ComNr 0 Teti & HOIWB1DND0 Fart Collins, CO I Global Village I Intemational Schools 403 SMM AIriM BW. UDXA A ... CO 3001742423 OMM15 UPDATEDCONST PROJECTNO: JVA#2337C DM" BY. ow CHECNM BY: ETN APPROVED By ETN SHEET TITLE: STORM DRAIN PLAN C1.1 Mm 2 4 STA. 16+78.37-51.6 STA 10+10 AT INTERSECTION R'ZE OF CENTERUNES OF BRONSON TA: h+1255-35.45' AT - FL-51 AND HORSE7GOIH ROADS ENO DATIVE STF48 a51-49.2T AT EXISTING RAISED MEDIAN BEGIN CUP - �-+- - tt-5123.55 END CURVE STA: 16+ea61-49.68' R sleum FL-5127.5 N SAWCUT RPAVEMENT I EITHER STA. 12+86.65.49.12' RT STA: 14+79.52W9.4B' AT PROTECT EASTNC ELEC VAULT IN PLACE, NOItiH OR SOUTH BIKE LANE BEGIN WRVS FOLLOW EMSTINC .DINT GRADE BREAK EXISTING STRIPING STRIPE AS APPROPRIATE (M) tt-5124.79 PATTERN IN CONCRETE FL 5126.7E PROVIDE TRAFFIC RATEp C01£N, 10 v-t:- 12+00 - 13+00 - _ _ 1.100 - 1'- ._ t5+00.. _ _. _. COORDINATE �E WIN UTILITY ORNER STA11+08,62-35.30' RTCURD k CUTTER TYPCONCRET: 7 e[cIH TURN uNE __. +. _ __ _ pAVM40 __ - SOUTH TAFT HILL ROAD FL P23h2+MATCH EXISTING -- -_________ 10� I Ldil C_ l-- — 173- —ro—w ru r 10 24 796 SW -ME !EXISTI G FIBER OPTIC tf - CONTRACTORNTo VE R" LOCATION UAND m 1 ��IGHi-CF-WAY, TTY �DEPTH, COORDINATE WITH UTILITY DWNER + Hi PO - c - 2809 ME m / ;111 13 _ _ _- _ �. ro ~ - Ll STA: 15+52.04w9.55' RT - GRADE 68REM _ S,6 SiA. I _ ,I i CAME OREM F. 5 28ff5 Z Ilt - S12 m SIDEWALK``� AMP SEE ENLARfiY� CDAO EST BLDG \ STA 16+9158-7 Y' (..BELOW � FEE= 31.04 EN n I R3 E= �. ml AV ; � R•512 43 A ESTRIPE CR0 COMPLETELY RE NEW RAMP TO E BREAK � 4.39' D WALY MOVE $7RAICHi 5 °-�-�- SEE SHEEP G.1 SLATERPAULL AT FOR STRIPING, hord I coplan macht 22_ HOMZONTAAL CONTROL so D 60 i SCALE IN FEET I O GENERAL NOTES• 1. ANY DAMAGED CURB, CUTTER MD SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, 9DEW4LKS, 1331 Nineteenth Street I P 303.607.0977 CURBS AND GUTTERS, DESTROYED. DAMAGED OR REMOVED Denver, CO. 80202 www.6lalerpaUll.com I]+00 17+21.40 ;R DUE TO CONSTRUCTION OF THE PROACT, SHALL BE _ -- �- - REPLACED OR RESTORED TO DTY OF FORT COLLINS -- STANDARDS AT THE DEVELOPERS EXPENSE PRIOR 70 THE CONSULTANT: ACCEPTANCE 7 COMPLETED IMPROVEMENTS AND/OR PRIOR 10 THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 2. UNITS OF STREET CUT ARE APPROXIMATE. FINAL UNITS ARE 1 TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT 1 CD.LINS ENGINEERING INSPECTOR, ALL REPAIRS TO BE IN ACCORDANCE R1T1 DRY STREET REPAIR STANDARDS. 1 I' y 0 TRACTOR TO MATCH EXISTING JOINTING PATTERN IN - AND REINFORCINCRETE G TO BEOF PERHILL CDOTCMOSPECFICATIONSUNG r ) M-412-1. 4. CALL ON O FORT COLLINS TRAFTIC OPERATIONS AT (970) - - '6 416-2268 TO COORDINATE SIGNAL POE RELOCATION A Y" o'^°•• w" MINIMUM OF 3 WEEKS PRIOR TO WORN. t-r. Mona-.•- - • 1 '` 4 City of Fort Collins, Colorado n.» ov>ww .. n>nuw UTILITY PLAN APPROVAL AT LU � g ^ APPROVED: DO'uP-e ow CURVE w STRIPING O CHECKED BY'. w.r+w..r.rWIN ow = CHECKED BV9 a1e,-..I.,uuny ow FROM HT ON XISTNG RAMP .I CHECKED BY , I inw 6aYYee ow CHECKED BY: PROJECT: vw mA wears ow CHECKED BY: e„wa,eenr PMni- os CHECKED BY: nY GLOBAL VILLAGE ��i� ��=��_111111 i C� G ACC di ON MEC� L m •K�. ii.w rA«w IJ+w 14+00 15+00 16+00 TAFT HILL CENTERLINE SCALE: 1'40' HOW l'-5' VERY 7 5135 ±77 _ 31.q EXIST GRADE 69.50' — 5130 r: 18.32' ; g -20:05'— --- — _ - 2.5% FINISHED OOOE - 69.56 S139' 18.21 19.9 _ _ - I 5130 — -- — 5125 EXIST GRADE -- i1NI5NF0 GRADE 0,00 0+75 0+00 14+50 CROSS SECTION 16+50 CROSS SECM SCALE: I'-1O HORIZ SCALE I'-10' HOR12 1'-S VERT 1'-5' VERT t 7 D 0+75 17+00 17+S0 111 zze3 tt 27.88 Roc 2798 FL VV -"-,28.31 TOC 27.98 TOG \ 28.01 FG 2 28.44 FL .� 21.TLC 1 1 28.11 FG- U°C 1 28.08 FIG - \ i lr 28.13 FL 1 i� 78.58 FG 2a63 EX 2a57 2567 FG 1 2816 FL oa o 28.16 TOC o 1.8% 7a26 F A� � op° \ 1.0%� 284I FC ° °O° I za.zi FL I 11 2,. 7iTOG �2572_FC _ _ r 11E. 28.67 FG 2a77 FG} I I I \ P lit IPRO1ECi 9FNA1 P 29'08 � 2a95 4E xex I I II II I II PmESif IAN RAMP DETAIL SCALE I'-S' l 6 ACADEMY -FORT COLLINS - PHASE 2 2130 W. HORSETOOTH ROAD FORT COLLINS, CO 60528 OWNER: Global Village International Schools 403 South Airport Blvd Unit A Aurora, CO 80017.2423 ISSUE: OM22715 CONSTRUCTION DOCUMENTS 10215715 REVISED RAMP AND STRIPING PROJECT NO: JVA# 2337C DRAWN BY: KRB CHECKED BY: ETN APPROVED BY: ETN SHEET TITLE: TAFT HILL RIGHT TURN LANE PLAN & PROFILE C4■0 6HEEY OF