Loading...
HomeMy WebLinkAboutSite Certifications - 01/29/1993.. PARSONS & Ia ASSOCIATES CONSULTING ENGINEERS January 27, 1993 Mr. Glen D. Schlueter Stormwater Utility City of Fort Collins 235 Mathews Street Fort Collins, Colorado 80524 �/�z91r3 C�a/FCd RE: First Interstate Bank Drive-Thru Facility - Stormwater Certification Our Project Number: 92.13 NEE Dear Glen: We -have completed a field review and field survey of the stormwater improvements built as part`of the First Interstate Bank Drive-Thru Facility. This project was completed on a 2.067 acre site at -the southwest corner of Boardwalk Drive and the JFK Parkway. This Follow up letter addresses three areas that we discussed to finalize this project.`' 1) The erosion control measures are installed and complete per our plans. 2) The riprap area at Pond "B" has been reshaped and is complete and drains south per_ field shots. 3) The debris and excess dirt pile have been removed. Note: there are small topsoil areas that will be smoothed and blended along with the sprinkler installation backfill to finish ground elevation for sodding. As a result of our field review, I feel that the drainage improvements are in substantial conformance with the reports and plans approved by the City of Fort Collins for this development. Please feel free to contact me should you have additonal questions. Sincerely, Mike Cole Engineer MC/gbl cc: Paul Hoffman, The Neenan Company Ted Beers, Sinnett Builders, Inc. • 432 Link Lane Plaza • Ft. Collins, Colorado 80524 • [3031221-2400 PARSONS & Ir ASSOCIATES CONSULTING ENGINEERS December 29, 1992 Mr. Glen D. Schlueter Store water Utility City of Fort Collins 235 Mathews Street � t4 Fort Collins, Colorado 80524 ! pctff t, RE: First Interstate Bank Drive-Thru Facility - Stormwater Certification Our Project Number: 92.13 NEE Dear Glen: We,have completed a field review and field survey of the stormwater improvements -built -as pa—ft-of.the First Interstate Bank Drive-Thru Facility. This project was completed on a 2.067' acre site at the southwest corner of Boardwalk Drive and the JFK Parkway. - As outlined in the drainage report, the, on -site drainage is conveyed via curbs to Detention_ Pond A at the center of the site. Drainage on the westerly edge of this site and from off -site- areas around the Cables End are conveyed via curbs and drive to off -site Detention Pond B: The outlet for Pond "A" discharges historic flows into Pond "B" and Pond "B" has been sized for this `additional flow. I have attached copies of the field data which _was compiled during the verification process. A summary of this information is compiled in the following table. POND REQUIRED VOLUME ACTUAL VOLUME AREA ORIFICE PLATE REMARKS ft3 ft3 in A 97 1 15,244 1 78.54 1 On -Site Pond B 20,400 1 22,055 1 188.69 1 Off -Site Pond • 432 Link Lane Plaza Ft. Collins, Colorado 80524 • [3031 221-2400 `1 -1 �a t Page 2 of 2 December 29, 1992 First Interstate Bank Drive-Thru Facility Stormwater Certification In; addition., ;parking lot grades and the direction of flows are as shown on th n A. i'S grading'and drainage plan. Easements for the off-site"improvements were secure approval process. 73�s'F�� 4TMW ! i. Y-Asgyou may recall, a great deal of dirt was stockpiled at -the south edge of this site as part b�oththe.First Interstate Bank and Best Buy construction activity. This dirt has been r`ern'o <a'rdthe Retersen Property has been regraded'"to facilitate the original drainage patterns`'' As a"result of our field review, I feel that the drainage improvements are in substan conformance with the reports and plans approved by the City of Fort Collins for `t development. Please feel free to contact me should you have addifonal questions. ant GRAPHIC SCALE I XIq I� I. I Rw rear l l�n-ao n I c� I I YSlIC I I I II - — — — — — — — — — ----------- - J r FTT�\ III I:�RESTA�RANT ` I r J— I 4 LEGEND 6GDlMC PROP0380 D84CRQ'fYON o • IIIVAD Rd&IR / RT R6flUt 0 • YARNO189 m N VALVES COMM M EIdYAmans A, now HYDRANT „--VZllll4l WATER LM6 ' -F=m9=aL AANITAR..G,SR -C=Am� mm 56'•ER i WILLA TGi'PHME Lou; & R136R MY �. ti .—•�-b AdLTR/C /AT 6 VAULT 1 —. DIRFLTroN now A4VN HOVNIl4PY DC BAffi!CESICNAPOR NEW PAVFYEM UA,dwG Amf NOTE.' PROPOSED CURD ANO GUTTER ARE INFALL EXCEPT AS S40HN AND . CLAS/ fOIIG `n•} 1 I I � 1 30� tTCMP �. Vxm AR n v OEC 26 M! PARSONS & ASSOCIATES 43ll Link Lane Plaza R. Collins, Cale 400 80329 CO NSULi1NG ENGINEERS (303)221-2900 92.1392.13—NEEE M. I F.I. B. KE-THRU FACILITY P. U,D.II GE CERTIFICATION EXHIBIT