Loading...
HomeMy WebLinkAboutSite Certifications - 08/24/2015Aferovej wL Geico Office Building F ity.6f lilnS 2024 Harmony Road COMMERCIAL, MULTI -FAMILY AND SUBDIVISION CERTIFICATION CHECKLIST (Overall Site Drainage) Please fill in all applicable items in this Certification Form for Commercial, Multi -Family and Overall Single Family sites. A copy of the approved grading plan must be submitted with the as - built grading plan. (It is preferred to have the as -built elevations written in red next to the approved elevations) Use "OK" for items checked or actual numbers for items verified/surveyed in the field. Use "N/A" for items that are not applicable to the site that is being certified. Please provide an As -Built Redlined or Mylar drawing showing the following: A. Detention, Drainage Facilities, and Common Open Spaces As -built Additional Detention Volume = 3,710 cu. ft. 1. Pond Certification Design Additional Detention Volume = 3,319 Cu. ft. Required Additional Detention Volume = 2,g17 Cu.. ft. OK • Provide Topographic Records and Volume Verification Calculations both tit Detention volume exceeds both the design and the required volumes. OK • Provide Pond Cross -Sections and Spot Elevations (especially @ Pond Embankment and Pond Flow Line) OK • Positive Fall to Ian (if applicable) N/A • General Pond Grading including all Side -Slopes OK •• Invert Elevation N/A • Forebay Construction and Elevation OK • Spillway Weir (Location, Elevation, Height, Opening Width) OK • Placement and size of riprap or alternative permanent erosion control measures Erosion Control Matting was used at the outlet. OK • Orifice Plate and/or Water Quality Outlet Structure Installation OK • Water Quality Capture Volume (Volume Required, Volume Provided and Water Surface Elevation) water quality Volume was included with the detention pond within the pavers. N/A • Berm and Embankment Compaction Level OK* • Subsurface Media for Water Quality Ponds and Swales SINGLE ASTERISK (*) = PER INFORMATION SUPPLIED, ENGINEER UNA13LE TO VERIFY. .V I NORTHERN ENGINEERING Fdrt Collins 2. Swales OK Location (are they within easement?) OK • Dimension and Cross -Section Verification OK • Longitudinal Slopes and Side -Slopes OK • Spot Elevations OK • Permanent Erosion Control Measures (drop structures, riprap, lining) Concrete Pan and Sod. OK • Tie-in to Storm Lines, Pans, Curbs, or other appurtenances OK a Required Minimum Freeboard, Provided Freeboard NO • Landscaping Infringement on Flow Line? 3. Pipes OK • Size and Type OK • Slopes (As -Built and comparison to 0.4% Minimum) N/A . Pipe Capacity Calculations (if slopes are significantly altered from design) OK • Invert Elevations *N/A . Installation and Backfill *N/A . Cover *N/A . Encasement and Clearance from other nearby utility lines *N/A . Joints Type and construction SINGLE ASTERISK (*) INDICATES ITEMS NOT ABLE TO BE VERIFIED BY ENGINEER. ■� INORrTHERN 2 Geico Office Building ENGI2024 Harmony Road Fort Collins 4. Concrete Pan Channels OK a Size OK a Slope OK a Cross Section *N/A e Thickness OK a Elevations 5. Inlets OK a Size and Type OK a Size of Opening (or name of Standard Detail used) Two inlets are flat grates instead of donne grates. This isn't OK e Grate Elevation an issue for capacity, but could clog and continued maintenance will need to occur. OK el Invert Elevation OK a Box Size 6. Street Cross -Pans OK e Size OK e Type OK a Grade OK a Elevations N/A* e Cross -Sectional Depth OK e Tie-in to Curb and Gutter NORTHERN 3 Geico Office Building ENGINEERING 2024 Harmony Road F6rt Collins 7. Culverts N/A • Size N/A • Type N/A • Invert Elevations N/A • Headwalls or Wing Walls 8. Sub -Drains OK Y Size OK e Type (Perforated/Solid) N/A* • Cover N/A* • Backfill N/A* e Geo-Textile Liners OK • Clean -Outs 9. Curb Cuts N/A • Size N/A • Tie-in to Swale, Pipe or other appurtenances 10. Common Open Spaces OK • Overall grading contours of open spaces OK • Spot elevations adjacent to private lots (property corners) ■� INORTHERN 4 Geico Office Building ENG2024 Harmony Road Fort Collins B. Grading certification 1. Certification of Grade Elevations: OK. o Minimum Opening Elevations OK • Top of Foundation Elevations OK • Comparison to 100-year Water Service Elevations OK • Comparison to Freeboard Elevations and Base Floodplain Elevations— BFE 2. Verification of Site Grading: OK • Engineer to evaluate site grading compliance with the approved grading plan. OK a As -built elevations are to be redlined onto the approved grading plan sheet showing the as -built spot elevations next to the design spot elevations so compliance can be verified and documented. C. Certification of Erosion Control Measures: I I 1. Permanent BMP Measures: OK • Permanent Vegetation (no more than 6" bare spots and weeds under control) N/A • Riprap or alternative permanent erosion material N/A • Riprap Bedding N/A • Cut -Off Walls or Channel Drop Structures Cross -Sections N/A • Sediment Basins N/A • Water quality ponds/Sand Filter/Bio Retention Construction and liners OK • Permanent Netting Mats or Blankets N/A • Mulching and Seeding Sod NORTHERN 5 Geico Office Building ENGINEERING 2024 Harmony Road Cf Fort Collins 2. Temporary BMP Measures: N/A • Mulching and Seeding Sod N/A • Temporary BMP Measures as shown on Erosion Control Plan D. Post -Construction Site Cleanup: OK • Construction Debris Clean -Up (In particular debris affecting the drainage) OK • Smoothing of Ruts in all Construction Areas OK Reseeding of all Areas Affected by Construction Activities (Usually enforced by the City's Erosion Control Inspector but the engineer Certifying the site needs to notify the contractor if areas are not seeded) E. Statement of Compliance: This certification is signed and stamped and by signing this form the Engineer(s) attests that they have inspected the site and to the best of their knowledge the as -built conditions of the drainage facilities are as described in the above form and in the As - Built plans enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. F. Signature and Stamp by a Colorado Registered Professional Engineer Roger Curtiss, PE Colorado PE Registration No. 27362 NORTHERN 6 Geico Office Building ENGINEERING 2024 Harmony Road ,7� rR t APPENDIX A General Grading 6 AIV It North ernE n gin eering.com // 970.221.4158 47N i �y k 14' 0. APPENDIX B Permeable Pavers NorthernEnglneering.com // 970.221.4158 _.'m R�MQPNWWT Arm" nip e Concern: Small portions of pavers where installed because the monitoring wells wF, - rotated 45". This may cause constant maintenance issues in the future. APPENDIX C Permeable Paver Checklist NorthernEngineering.com // 970.221.4158 Construction Inspection Checklist for Permeable Interlocking Concrete Pavers Item/ Yes INO INIA I Dommentation/Submittal Requirements Excavation Post -excavation infiltration rates are greater than 0.5 in/hr (for "full -infiltration" designs) _ s'- Im rmcable Liner Impermeable liner meets design specifications _ I Impermeable liner attached to concrete perimeter wall ✓' Impermeable liner is not exposed / - Underdrain System Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanouts covers are ir I far, Underdrain is NOT wrapped in geotextile fabric ..' Underdrain orifice plate installed at outlet structure Underdrain inWrity - teste�aher backfilling using Tv and/ water test - - Aggregate Base coarse (e.g. a2/4) has 90% fractured faces ✓' _ Bedding coarse (e.g. #89) is WoraeghlYsvastt e, Subbase materials are installed and compacted acco ding to manufacturer specifications I ,- , Protection During Construction PICP area is protected from construction site sediment, including runoff from the upstream catchment construction equipment traffic. I adze out Upstream catchment is stabilized prior to diverting runoff into PICP system ✓ ...L--- 9/9/2024 Revision Construction Inspection Checklist for Permeable Interlocking Concrete Pavers Item/Activity Yes I No I N/A Documentation/Submittal Requirements Excavation Post -excavation infiltration rates are greater than 0.5 in/hr (for "full -infiltration" designs) I x Not in OBS 1500 SF add on scope Mao Impermeable Liner Impermeable liner meets design specifications x Impermeable liner attached to concrete perlmeterwall x Impermeable liner is not exposed x Underdrain System Underdrain pipe is per design specifications x Not In DES 1500 SF add on scope Mao At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanouts covers are Installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure x done by others Underdrain integrity tested after backfilling using TV and/or water test Aggregate Base coarse (e.g. #2/4) has 90%fractured faces x Confirmed in DES add on area Mao Bedding coarse (e.g. #89) is thoroughly washed x Confirmed in DES add on area Mao Subbase materials are installed and compacted according to manufacturer specifications x Confirmed In DES add on area Mao Protection During Construction PICP area Is protected from construction site sediment, including runoff from the upstream catchment and construction equipment traffic. x Confirmed In DES add on area Mao Close Out Upstream catchment is stabilized prior to diverting runoff into PICP system 9/9/2014 Revision `�� 7-14-15 APPENDIX D Storm Sewer Yl/zg - volacify Now North ern Englneering.com 11 970.221.4158 i APPENDIX E Detention Facilities ;;at.ay OrnM E.o D<Ienlwn PIGw1N ow," _ Afww NwrrWl Wblet lc,l F*, o y trttennnce .. - �• \ Permenent� yyr -Ezp*, ne d noa • a. EM+nr SatMy �^ Omen `� Ou11en 'Ben 1EnIDeMnte01, _ >.kraood ED Pw Pr ED Pone VMM Po d vwm ED (tw Cn Prdee ) VM1 t ED Por..t E D Ywo. 4t An y 1 �YY! Northern Engineering.com // 970.221.4158 W INORTHERN ENGINEERING ASBRcu: rin¢�s7Bnulu m4smu�wo. mim l4 nntrt: EAi4 SMZI.4159 fort O.M.e, W MV4 ww.40AMneryinRnrytpn Project Mle Gelco Office BulldIng Date: August 11, 2015 Pmjen Number 959.001 Ulcs By: C. Snowdon Client Steve Allen Pond Designation As -Built Detention Volume 4,96190 126A N/A N/A 0 0 N/A N/A N/A 0 0 4,96200 570.64 0.1 17.35 37.35 1494 N/A NIA N/A 0 14.94 4,962A0 1,067.14 0.1 8189 11924 47.696 N/A NIA N/A 0 47 G96 4,96220 1,39126 0.1 123.22 24246 9G.984 N/A N/A N/A 0 96.9M 4,962.30 ], G26.51 0.1 151.19 393. fi5 157.46 N/A N/A N/A 0 15746 4,962,40 L854.34 O.1 17404 567,69 22J.O76 N/A N/A N/A 0 227.076 4,962,50 2,083.915 0.1 196.92 764. 61 30S 944 N/A N/A N/A 0 305,844 4,962.60 2,290.84 0,1 218,14 983,35 393.34 N/A N/A N/A tl 393.34 4,96270 2,380.26 0.1 23355 12169 49676 N/A N/A N/A 0 496,7G 4,962.80 2,493.59 0.1 243.69 1460.59 584.236 N/A N/A N/A 0 584235 4,962.90 2,G96.12 0.1 259A9 1720.09 688.032 N/A N/A N/A 0 688032 4,963.00 2,938,30 0.1 28177 2001.8 800. 73 N/A N/A N/A 0 800,72 4,963.10 3,188AG 01 30634 230E 14 923.25G N/A N/A N/A 0 923,255 4,963,20 3,44G 56 0.1 331 75 2639.89 1055.956 N/A N/A NIA 0 1055.956 4,963.30 3,711,94 0.1 35792 1997.81 1199,124 N/A N/A N/A 0 i199.124 4,96340 4,004.32 a 38581 3383.62 1353448 N/A N/A N/A 0 1353448 4,963.50 4,394.66 0.1 419.95 3803.57 1521.428 N/A N/A N/A a 1521428 4,963,50 4,736, 14 a 1 456.54 4260. 11 1704.044 N/A N/A N/A 0 1704.044 4,96370 4,93044 0.1 483.33 4743.44 1897.376 N/A N/A N/A 0 1897.376 4,963.80 5,073.88 0.1 500.22 5243.65 2097.46 N/A N/A N/A 0 2097.46 4,95390 5,181.10 0.1 51275 57564 2302.56 N/A N/A N/A O 2302.56 4,964.00 5,256.61 a 521.99 627829 2511.316 N/A N/A N/A 0 2511.316 4,961.10 5,298.27 0.1 52J.J4 G806.03 2722,412 12.09 N/A N/A 0 2722412 4,964.20 5.228,99 0.1 526.36 )332.39 2932,956 132.06 0.1 Z21 7,21 2940.166 4,964.30 5,001,18 0.1 511. Si 78439 3131 S6 405,71 0.1 26.89 34.1 3171.66 4,964.40 4,6249D 0.1 481.3 8325.21 3330 OM 821.92 0.1 61.69 95.78 3425.864 4,984.50 4,14065 0.1 438.28 816348 3SOS 392 1,34910 0.1 108.85 204G3 3710022 PM4 APPENDIX F Record Drawings NorthwnEngin"ring.com // 970.221.4158 i f�r•�, i �i jl'I l �• _ � -•. �: __..) _dam-?_. Y \� Y - - -- _. w). _.- _ 1. _ _— _ n .•�. `�'. EL RECORD DRAWING ' •r�- I wnuN rwe 1rE Amnner a n.s rciD iEDeunnw. wE carY . EnGre wm. aYBii sY., Yo1 mBN nPeNum [writ 7�8�__-_ c: re•xer�y ® NORTH sD D m U eD rM LEGEND wDPUM1 mwAXr �.. �..� wawsD Eee sEAW£ p E xvw64D S.NrAAr zBEP snva s rvDrm� c.a ¢xaa G ,vaaD EIEOIM sarYa - rcum rtrm.m u,m Drux - MD>O¢O sear vzw EMAG GASH„E _- E. s.NTAvr sEIER ss EBalwc YARn .. EKIVrG EIECMC , EUSIING rzMLF .A. XIHTAI WYFFA WR ,uP Gr EA11 VV'3 P5C>D¢D 1...Ala. IT ■ rMC2G¢D CLEnn'W' b M59Y➢ F.E[Ti'C 1PMSQIUFR E➢STK GE[MG Vµnl � [AsinG 14ArrK vMEI R EASra: FH mT6 .T.Y. YARn EnsnNe GA5 uERa EMnnG RP.,WE %EEpESILL �� EYST,1. 1..1 Bn6 PEGS 1 r I.AIEG E11TM1 ¢Mq xunRL CMRF YAIq E6rFY Q [ESNs CNp Si1P C E1151xG YAlE11 �L O s snw mYM1c YYN v¢E T•s e1Elr4 MES G NOTES: Y[ Ys E"'E 'AB.. R AY IMN tMAQOIp YRIi6 Arz M ®NArz Yen YwM w ws mua,m n YWA ■ x M4VN.GaiM1' Gr lrc camcmn m .w. M [OSlol3 a .0 ErQEGWr9 unulEsTK x nE rmM a TEE fI1N. PEOGAG9a�E f� LKA'wG Y O u�Tom. Ma PESPp.SAE i.R Al LtiMOVx WgAgp1M V11Un6 E.F.1S.DAOG¢CONSTiuCiMV»ECRICAaW; 4RSTTHE@'1I Wi ]. AlL YARR i111W45 A!0 v4 `2S hVE dLLr QMIICALLr 1®WES[N1E0 Mq ME NOr TO Sf4E. ,.r XGP.1AA MM 1r YE aG.L NXMur ¢„MA, SEIEEN MX Au E.i.v SEr.FA ...& NRM uuNs A YVHIEs 5 ErTEX 10 11E Mi . 1.1 MEAS TRACT 4IIS EA..1- l0i Cx[NY.113 UT V EASE M OM1 rA4E M AED ONEA Y Y ViDbAryal f rYE VH »41 ¢ STA�T.D A14[ ME bSEP R4L AW t4i4D 1' 4OK M rae5� RQx [irrApEwt 1 WM rIEt9 Br nE p EN• a®ECR4 W WM511W(IEP_ x ALL'pmM¢ YM pTY S1 .T n . EIArGYB11 E .Vl6 rtE xIIXV¢D S'du 4Vdrs 1O¢rtvAR Ma .1 .1. Br M ONEN CA TE ." , i SR .E . .AI 6 nr ,/.p V¢ r 1. ALLOYAgE u¢5 Yni. nE EM"TA . MO .1 G P n 1E., Ap 1 rCEN¢Y TE bM1 . oAW. Y„. AL. r£XYIR NE 1.1R BIM1Yx} NE W uE MS£. MY O11EP FLSn XG 1..9 1O REM.IX YMI IlE }6iFA IM IT MY GAWgD WNB. NiRR IM 911EYAU{ FLSMIG FNIPi m EOvsTNGilnt M a6L M xIXFL15. SOrxAllLt NRIE MO NRFAS CCSIPDrf➢. DNIARp Ui Rla� GVE m Cd15i'AIfOW Ei Tps ROEa 91ALL H DER.VID M P M F m TO V rCM TMo 51MpMp5 AL IIE GElB6En'S , . T. m ME .CQPI4NLE 6 CPiIER➢ NW.901R AM/d IPKN LO nE ®IM6 Ci TE rWif fAtIM1R M O9AMCY n. Mr DwA¢D m rcYvum cwNErz Lm,Ax Y,M1 Y PEnA® a ksrcrn xM NA1pnG rer» AlY m on a rw coons norms i] Ml pSPN6 VRnFS 9WY1 Or Tls qM' OC,gYG BON N1P City of Fort Colli", Colorado UTTLITY PLAN APPROVAL sneer C3A0 Ot 15 Sheet ® NORTH TO R 1. ]R nFW (IR MI) IEm• TAR LEGEND: VISTA. STOM SE. a pTAR.D S1Gb SLY2R IpRmF➢ STb N[t � NNTR.R SOIIAR �)-- EPSTFE COIIPA _SO ] IRA3D IT Ooos,L ttwN wn • aTTw Fwosm IT len:r L TFA uropone vRT ORARr m ARRY FRsosD LOT ue L vRowsR wr.ER rwRzmN ,. FINPLAID TART n ",M PAWN SONTR.ARE SPOT nFVRTON �y Yx' 1.0. TAci EIEV/IOA YT FAWRSO SLOM IS WVRORN.TT IOIS OF Slolo.EIT -a. IRmIAA1 T... NOTES: L TE 9[E. n"T .M L. Lf IT NNRW YXMTUpM uwAST ATVRDITaAST wcx wow OR TI.Es OR MRA s" IT, Olt RL9umvT ITITT cw.ACrw r..EAFY Ts ms ns". m AL, vn�LRND uwmTO, NEOF N T. BEFORE LMCIONL OLR LV6TROILTWL. Mt LMTRACTOR w4L RE MRONSSRIf FOR IMAyR. 4 I.NNEA. RTNIT's .M 91.4E RE IE .. FW Ip ALL RWpRw WOfl..00 uTI TES 3. OFFER TO M KAT FW LOT .KAR TRACT %K% usmNrz Im nYpSW1 LII%J1^ F<ELIIpo. RmW LA .I, T.M 1 .Ryy 1 ALL ..TI fEV1. ARS BARED OR OR aT. IVT CA ." ORICµ T"yok NM I... (W.RLSItD). ALE CDMI wLLT FR SpCXLLVM RfiE9M.E. A ALL [IM .1. AT IT. nlV.. ALT RTKR 4tlB .RL omRs CRµ£ nX.T106 S w.CORN 1.1 OR RE . UY .. ALLDNAOE u.S MN 1ME 0.FiERS .T.T ROF M. .. 9E OT TAW C9P6. MO.. MOTS or FIRS. B.{LWy TIE pbK uqE. ANR RMR LSMAG LAND LOTS D RaNR .I . M eLRp TOR L. INiTS 0 STIEFT aT ARL YFRDSINATL. nnAt Z`s To K °u oxu, AS SIT cc .ATo tli :BEN an ii tti Rap. SImO. > sE[ .E Tp SA.I . ME IA`R V.. To, AUPYAgE L¢l 'N ITT TARM lVE ARO ..' C LA . ILA. A.fTART eElY2 Ld 0T, AM CFY16..M ALSO MOTS M p.. Rm w ... IRE, wvp DMER L..I. L. LSE. To REALM YOw 1K TmoR . S p1 RARA® 6OB, pRHA w RRRRAAI msmo PRIOR To TOASyA,nS1mPF0. RARA.�W ALL K �pE LLB NO 1610®c A IT oy� ff FWT CRi1p siA�A AT OE BE`.6(Vp S C1PM£ FRW To M .00EI. OF CORfTm MIOL(]G3 N.R/IR YItM To SIR .. OF OR F`Af1 mLl . OR DavvAR[O. PROJECT BENCHMARKS .I M .R Olr a rwI mn. ewTLmn) s-A tN.R1w�- wms MAw eeI - rw Raw..sA wr m �e1w�- .mT.Io MCR 79 - 1n.a16Rdj - N.p1 vmun 2 a>ee amAwa r.e Cw4�A ewme,wE I-m p a :.w1a ury EAwLLn. AwLn w w - uweylwj - heM Been Yiealm �11.an�[we «r N�N„einrNw sweNta�R� a Laayl FIELD SURVEY BY: NL Wel [nis FM ISO M Mw splwrrow 6 MO] Raa+Y a*mw 1T, Tms uuA vnm xorEroOlox Lwrm a RAw MYaEBMI. City of Fort Collins, Colorado UTILITY PLAN APPROVAL 1'Suu, MI. RECORD DRAWING 1w TIES .mrm w.Rxcs FROLLaD er xpT:Ew LRVEmaw 2'iN4 BA4R M x1) eiOd.ld WO�E9PJ 9. D3%. ROR T xR wm Fwt RIOAaIAclT, TITS Tvn NFaw.TOL C4.00 Of 15 Shoots