Loading...
HomeMy WebLinkAboutSite Certifications - 06/01/1999FOUNDATION Consulting ENGINEERING II Engineers, Inc. 1 June 1, 1999 Commission No.: 2667-03-01-02 Mr. Adam Springer \ 1 c/o Cottier Construction 350 Linden Street Fort Collins, Colorado 80524 RE: Springer Plaza, Fort Collins, Colorado Dear Mr. Springer: We have visually observed the as -built grades at the above -referenced location. These observations were initially performed on April 13, 1999. We have also compared actual elevations provided to us by Intermill Land Surveying (Project #P-98-4192) with the proposed elevations shown on Messner Engineering's grading plan (Job No. GRD-228-96). Additional post construction elevations were surveyed by our office May 22"d, 1999 in order to generate cross sections of the detention ponds which we could use to calculate their as -built volumes. These additional elevations indicate that the west overflow point of detention pond "A" is actually at an elevation of 34.89 in lieu of the 35.02 as shown on Messner Engineering's grading plan. Our calculations indicate that detention pond "A" has an as -built volume of pr imately 3288 cubic feet and detention pond "B" has an as -built volume of approximate)(eq 3040 ubic feet. Thus, the estimated as -built total volume is approximately 6328 cubic feet. The 'red overall volume per the grading plan is 8170 cubic feet. We recommend the addition of two (2) four inch speed bumps to be located at the west and east entrance/overflow points of detention pond "A". The net effect of the higher overflow point is an increase in capacity of detention pond "A". We estimate the capacity of detention pond "A" with the speed bumps to be approximately 5362 cubic feet. Thus, the total capacity of both ponds would be approximately 8402 cubic feet which exceeds that which was required. It is our opinion that the znu+umirte as -built condition, 5�lti�cpeption of the above mentioned modification, is in conformance with the approved$tdagl,1'otttave any questions, please feel free to call. p tfully'd0� 6� oa x .J•4 ^O� oµd 0 vv. -�Y/� • a ��` FOUNDATI01�7%h,NG JAC/jle CONSULTING ENGINEERS, LTD. 5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 *Fax (970) 663-1660 500 Kimbark Street, Suite 101 -Longmont, Colorado 80501 •(303) 702-0661 *Fax (303) 774-8413 COMER CONSTRUCTION, INC. P.O. BOX 1051 FORT COLLINS, COLORADO 80522 (970) 221-4621 - FAX (970) 221.4656 TO .......... ... ._.._.�...._...__._6eo- C-t-Nis._...._�TDr `t.......!/' Z 7_...........t,...Q_o._v......... __z......... T'............................................ �C�44C�1� OCR 4 f�l��]�44Lad DATE JOB NO. ATTENTION - - RE: 4S,ei 4. CmIt`3-v,� WE ARE SENDING YO Attache ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ ❑ Change order COPIES DATE NO. - DESCRIPTION (p - • 9c, . 5 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted �s requested ❑ Returned for corrections ❑ For review and comment ❑ 19 REMARKS w%c L Ga 1-i- jo i ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US /�;tcU COPY TO SIGNED: If enclosures are not as noted, kindly notify us at once. t�t I ry U) a 00 0 � W a � U) _o co o o M M M M Z Z O LL') m to N Q F- to N co 0 d Q to tf) V CO wm co co co Z Z w CD (D N NCO W F- w a QQ� U) �o J m m 0 =) C) aVl 0 OF-HLL(n W� C9 �, Z O QU)Z a F- w t.Y u. 06 N N C / I O o O { I o v / i N to 0 c� N N pN O N N O v M N O N (o C'1 0 N 119-Iai-1 m P (� I N (i1 t�0 QN 17 Iml IIq CL T LCN L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ui to Lo m 10 tri ui tri ui tti tri tri tri tri tri Cl) Cl) Cl) Cl) t7 CO M M MMMM M M M I�tnNMON� h0�(OMOON cfOMOOOMco V ,rNI�OON V N to C V' M V' Cn M to M ar M 4 to C() (O M M M M M M M M M M M M M OO V V OO It NCn� / I b N O a O 0 t0 N N P h (Np � 00000000 tri tri tri tri tri tri tri tri M M M M M M M M N �f�f,(AQMtn Cn 00 � cyj (D M 00 � to V V M '7 to to (fl M M M M Cl) M M O O cr cf to to to N V V .jYm(n ZmQ F- F- F- LL Z LL H m 0 0 U) a m cl W W EL U) v F-F- Z O iZ Z_ Z Q F- W F- W a W . Z a U) r to to to to to to to M M M M M M M M M to tDN V-M V 1-O 1` to1�d)R V m m w N to R M M M V 6 6 O M M M M M M M M M OO V V'to ITtoMO � N '7 V to 0 m I � I o P IS N YS O 0 wwwwwwww r r r r r r r . to to to to to to to U7 M M M M M M M M fl- -W(D N(D Om to WCD vj 4(0 7" too V mMto(Dw M co M M m co oovvvMMco N (DOO JYm(n ZmQ Qp��o��C� it U 0 +ID V -01 F- F- H LL Z LL I- m m m p N M M M M M M M M M to a0 M t(') V sf , to D% T- h N M OD M to V V M V to to (D M M M M M M M M N (D(Dn J Y mU) Z m Q ��U0N0U� I , J tIJ J F- F-F-LL ZLLF -m N t 0 w m O N � 1... 0 IOO f�l N V M CI w ao ao w ao co 0o ao tI7 to in to to to to M M M M M M M M h MNMT -Ito l� �O)N WOO LON toV 4M4666 M M M M M M M M O O R R V M M D) N t0 (Oh J Y mV) Z m Q � � � J tIJ � J F- F- F- LL Z LL F- m U) a 2 D 0o 0 W W a CO v z 0 a c� z z w W H >W a w W. 0 z cn , 0 0 Q 0 ry 0 �i I toLoWLo Lo M M M M M M M CM Go 0NI--GoNMN 6O V O)M M'7 Go M Go R Mto to 66 M M M M M M M O O V V LO M V (O N H > U) OD ► H(Ji(Ji2zz N 0 Q w w A V J C-1 — c� c > J O J • to Lo Lo to 00 00 co co m V ' 7 C' V M(M(MM Q to m toN Z to N OD C.) Z O ptotov(o M M co M W - Q Z z W J Z W F- C)NNco W X F= W a QQ w �o N p U) -Jo ��� VZ J§ U F F LL (n .( Q �J�J R a • ��W O I O b 1 P O n O N �i _ 1 o O N P f7 �i e 0 O O N 0 I N ro n r7 0 to to Lo LO 0 to to Lo to to to to to to to to to to m 0 to Lo to co OD OD co co W co 00 OO 00 00 OD W 00 OD 00 00 OD OD OD 00 00 00 V V V V V V' V V Nt a V V V V- V- V' V V V V V V V M M M M M M (M co M M M M M M M M M M M co co M M h to N(O 0004 M 0 M W mN NCI, f�mIqMto �m M 00 mm V 4 N r- m N-.7N to OD c-6lpCM w7 to V V MCY) toM`7M V totn(O V mm to M M M CV)M m M M M M M M mmcoM coM M m OO V' V to OO V'7 Nvvtoi OOV VNV N M Co VLO v to JYC�(n QQ JYmfn ZmQ JYpp(n Zm� JUw � oN �� -�Uw Q' � QQO��N�Mo JUx WQ O�pNO�0j 'Q ODD U U U 'Q' (� ci 9 J+ 1 J > w J+ 1 J J 9 J+ I J J _. F- F- F- LL Z W CO F- F- F- LL Z LL F- CO F- F- F- LL Z LL F co +O O O vV M v Q 1, X 1 0 Q 1 i N 0 1�\ t` 6 f0 IL Q 0 N NQQ N o „l �Np 10 N h QN P N M N M N fh tl C') a 0 0 0 Im m 0 e ry Y 0 (o Lo (o (o (o Lo (o Lo Lo (o (o 0 (o (o Lo (o Lo (n Lo to (o Lo (o (o (n Lo to (o Lo (o (o Lo (o co CD 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 OD 00 00 00 00 00 00 00 O co V V V V V V V V V V V V V V V V m m V V V V V V V V V V V V V V m M M M co M Cl) M M M M M M M M M M M M M M M M M M Cl) M M M M M M Cl) M Loco"V (MCIl- (Dh r�,O(ON(DOd1 Cl) Lo00M(o V V nM00Cr) (�_(Dr� (O fl-O V V (M(M OON (000 O(,.j j(D 704 (O 0), r' C14 M 00M V O)N 00 (0 O LON (oVCl) MCl) Vco(O(D Lf>li VMM(o(D(D (oV Vo')V�u7O u>V VMVmcoco M CV) M M M M co co m M M M M Cl) M M M M M M M M M M co M M co co O O V V (o V (o (o M O O V V V M M w O O V V V M M m Cl O V V V M M O rN V V (o N(D(D(D N(D(Dh N(D(D Il- JYm(nF- ZmQ Q��Jb>x6 JYm(>>n >mQ Q�>O>:C7 JY00(>>n ZZOOQ ��>O>=C7 JYm(n ZmQ >Q � U 0 Z +iO V a >Q > w V ti OJ ) o �j> > w V o ti OJ U 0 >0��0>�i.7 > w V ti OJ ) of F-F-HLLHZLLH m i- f- HLLZILHm FL - HLLZLLHm 1-HHLLZLLHm W O N O Lr) 00 J 0 Z e- 0 0 t 0 0 0 b O N b 0 IO O N O b Ln Ln Ln Ln Ln Ln Ln Ln J M W CR O CR cq M M m M M M M M M M M Cb Ufl to Z MLO V MtovmLo O MMM CMM M d _Z Z 00 V V L?M Lo(O w j H U Y U) -i U cn QU�� o LLW!- H-01 OLL O2ZZ C7 , Z H 0 Z a w cn �- LU kAw Ar e-N R R 0 _ 1t1 O Q x Lill 1-611,0 77 r ' "7 � r. r} r r' l'r r r r l�"}" r. •s��� st�}} �f ��}., wnao (o' .'.`cov�m,naoM IVTO st r2o-'a0m vcomrnvr,A..Co to OD r)mN�v V OItT ea}� VvS sf MMN-NM (+f Mccn M MMM M c, i vi P'] M VV�MNN(n Mccn Mc( et))� 99 ce)M(�M U Joa \OOcA u7N �v O O cn cn cn cn cn o_ N F7 ca W 3co �0.+00 IA —I I I I � IQ I A I �A I i S A R� I: I. . A r r r r l v ,n rr ao �O N(vj 0ONtntnt,n0 NN vv FOUNDATION ENGINEERING April 14, 1999 Mr. Adam Springer 4500 Vista Drive Fort Collins, Colorado 80526 Consulting Engineers, Inc. RE: Springer Plaza, Fort Collins, Colorado . Dear Mr. Springer: We have visually observed the as -built grades at the above -referenced location. These observations were performed on April 13, 1999. We have also compared actual elevations provided to us by Intermill Land Surveying (Project #P-98-4192) with the proposed elevations shown on Messner Engineering's grading plan (Job No. GRD-228-96). It is our opinion that the as -built conditions are in conformance with the approved grading plan. If you have any questions, please feel free to call. Res ��tf�u�ll/yam, W��vv-s James A. Cherry, P.E' FOUNDATION ENG JAC/jle ° 1 ° ��•�n < rJ 0. 055 I! ati ENGINEERS, LTD. 5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660 500 Kimbark Street, Suite 101 -Longmont, Colorado 80501 •(303) 702-0661 •Fax (303) 774-8413 DETENTION VOLUME PROVIDED 1 7/20/981 1 1 1 Instructions: Input contour elevation and the surface area that contour encompasses (A). The spreadsheet calculates volume provided by: V=(1/3)d(A+B+SQRT(A*B)) POND # �CONTOUR SURFACE SURFACE DEPTH BETWEEN INCREMENTALI CUMULATIVE CUMULATIVE �ELEVATIONJ AREA (A) AREA (B) CONTOURS VOLUME VOLUME VOLUME (ft) ft^2) (ft^2) (ft) (ft^3) (ft^3) (acre-ft) INVERT 32.50 0 0.00 33.00 1600 0.00 0.50 266.67 266.67 0.01 33.50 3368 1600.00 0.50 1214.90 1481.56 0.03 34.00 4592 3368.00 0.50 1982.11 3463.67 0.08 0 0.00 F 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0- -' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 IVOLUME PROVIDE[ 3463.67 1 ft' 1 0.08 lac-ft MAKEN 1r, -p ot-,m . A DETENTION VOLUME PROVIDED 1 7/20/981 1 1 Instructions: Input contour elevation and the surface area that contour encompasses (A). The spreadsheet calculates volume provided by: V=(1/3)d(A+B+SQRT(A'B)) POND # CONTOUR SURFACE SURFACE DEPTH BETWEEN INCREMENTALICUMULATIVE,CUMULATIVE ELEVATION AREA(A) AREA CONTOURS VOLUME VOLUME VOLUME (ft) (ft^2) (ft^2) (ft) (ft^3) (ft^3) (acre-ft) INVERT 33.50 0 0.00 34.00 980 0.00 0.50 163.33 163.33 0.00 34.50 4544 980.00 0.50 1272.37 1435.71 0.03 35.00 7452 4544.00 0.50 2969.18 4404.89 0.10 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 T 0.00 0.00 0.00 0.00. 1 0.00 1 0.00 0.00 0.00 0.00 0.00 IVOLUME PROVIDES 4404.89 W 0.10 ac-ft COMER CONSTRUCTION, INC. P.O. BOX 1051 FORT COLLINS, COLORADO 80522 (970) 221-4621 FAX (970) 221-4656 J_� TO _ _-��_ �_ _--C� _CJl _. .... ............................................_ � �()p r,J LA,T elr' WE ARE SENDING YOU XAttached ❑ Under separate cover via _ ❑ Shop drawings ❑ PrintsPlans ❑ Copy of letter ❑ Change order ❑ dG�4f�G3 OCR 4 ° I�I�G��44LQ� DATE JOB NO. -a 6 - /er �a2 ATTEII//ff�-�`��IINAO, RE: CC J �- Qr�a Ce(Itca the following items: ❑ Samples ❑ Specifications COPIES DATE NO. DESCRIPTION qp (del " nk CPIC4 rD/l P err �ZjU Q r�KS��% IX �ynte ��a�1.5 uirJ�ii ��eUQti 075 ��dw��.L►t.{P/'vNrv�r/ (j-e1-eC./C4A, THESE ARE TRANSMITTED as checked below: For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US - REMARKS COPY TO SIGNED: _ If enclosures are not as noted, kindly notify us at once. FOUNDATION ENGINEERING April 14, 1999 Mr. Adam Springer 4500 Vista Drive Fort Collins, Colorado 80526 Consulting Engineers, Inc. RE: Springer Plaza, Fort Collins, Colorado Dear Mr. Springer: We have visually observed the as -built grades at the above -referenced location. These observations were performed on April 13, 1999. We have also compared actual elevations provided to us by Intermill Land Surveying (Project #P-98-4192) with the proposed elevations shown on Messner Engineering's grading plan (Job No. GRD-228-96). It is our opinion that the as-built.conditions are in conformance with the approved grading plan. If you have any questions, please feel -free to call.l Respe tfully, James A. Cherry, P FOUNDATION ET JAC/j le ENGINEERS, LTD. 5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660 500 Kimbark Street, Suite 101 -Longmont, Colorado 80501 •(303) 702-0661 *Fax (303) 774-8413 JUST THE FAX COMER CONSTRUCTION, INC. 350 Linden Street P.O. Box 1051 Ft. Collins, CO 80522 Phone Number 970-221-4621 fax Number 970-221-4656 SEND TO; Compan Name S/`�� From: Date: . Q urgent Reply requested Please Comment Please Review For your Information Total pages, including cover sheet. �. COMMENTS: DRAINAGE INVESTIGATION MAKEN II Lot 3 of the Gateway at Harmony Road P.U.D. 3rd Filing CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO Prepared for Springer Investment Group 4500 Vista Drive Fort Collins, Colorado 80526 September 1998 Project No. GRD - 286 - 98 M 015M E Emheertxa Inc. 150 E. 29th Street, #238 Loveland, Colorado 80538 Tt-lephone: (970) 663 - 2221 September 11, 1998 Project No. GRD - 286 - 98 Mr. Basil Y. Hamdan Stormwater Utility 235 Mathews R O. Box 580 Fort Collins, Colorado 80522-0580 Dear Mr. Hamdan, L, The enclosed report represents the results of the drainage investigation for the proposed "Maken II" to be located on Lot 3 of "The Gateway At Harmony Road P.U.D. Third Filing" in the City of Fort Collins, Larimer County, Colorado. This investigation was based upon the proposed site development plan; proposed site grading plan; on -site observations; and available topographic information. The investigation was performed in accordance with the criteria established in the City of Fort Collins "Storm Drainage Design Criteria and Construction Specification Standards" manual. If you should have any questions, please feel free to contact this office. Submitted, igineering, Inc. Dennis R. Messner, President DRM/mkm Enclosures cc: Springer Investment Group Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 238 Loveland, Colorado 80538 Telephone: (970) 663-2221 Letter of Transmittal Table of Contents Scope Site Description "Historic" Conditions Proposed Development Erosion Control Measures Conclusions and Recommendations References Drainage Summary Erosion Control Cost Estimate letter i ii 1 1 1 2 2 3 4 EXHIBITS Vicinity Map "Historic" Conditions Exhibit Proposed Conditions Exhibit Calculations ii The following report represents the results of a drainage investigation for a proposed commercial development to be located in the Southeast Quarter of Section 35, Township 7 North, flange 69 West of the 6th P.M.in the City of Fort Collins, Larimer County, Colorado. The investigation was performed for the project developer, Maken Partnership. The purpose of this investigation is to determine the effects of the proposed development on the area's existing drainage conditions and to determine the improvements, if any, and the appropriate sizing for the proposed improvements so that it may be incorporated with the construction of the project. The conclusions and recommendations presented in this report are based upon the proposed site development plan; proposed building construction plans; on -site observations; and the available topographic information. The analysis was performed in accordance with the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards" manual. N The site is considered to be somewhat rectangular and contains approximately 0.853 acres. The site's East-West dimension is approximately 262 feet, its North -South dimension at the West boundary is approximately 160 feet and its North -South dimension at the East boundary is approximately 115 feet. The site abuts the westerly right -of- way of College Avenue. The site is located in the McCLELLANDS/MAIL CREEK DRAINAGE BASIN. The site is vacant and is surrounded by streets or existing development. The ground surface has been roughly graded and is bare of vegetation. The site slopes are considered to be moderate and range from 1 % to 3 %. The "historic" direction that the site slopes is from North. to South toward Mail Creek. The major portion of the site slopes from Northwest to Southeast and drains toward College Avenue. The run-off generated in the area to the West of College Avenue is directed into a 42 inch diameter storm drain that is situated along the westerly side of College Avenue. The storm drain discharges into Mail Creek. The area to the South of the site is a McDonald's restaurant. The site improvements for the restaurant have been designed to direct the surface run-off to a detention pond located at the East side of the site. No run-off from the South contributes to the drainage on site. The area to the West is an internal access drive and parking lot. The site improvements for the parking lot have been designed to direct the surface run-off to a detention pond located at the North side of the site. A small amount of run-off from the West contributes to the drainage on site. The area to the North is a Jiffy Lube and car wash. The site improvements for the Jiffy Lube and car wash have been designed to direct the surface run-off to detention ponds located at the East side of the site. A small amount of run-off from the North contributes to the drainage on site. The area to the East is College. Avenue. The street improvements for College Avenue are much lower than the site and therefore does not contribute to the drainage on site. 1 PROPOSED DEVELOPMENT The proposed development is to consist of an 11,685 square foot commercial structure to be located in the northwest corner of the site. The proposed access drives and parking are to be situated along the West, South and East sides of the structure. As previously stated the run-off from the site flows onto College Avenue. There are no other drainage facilities available to accept run-off from the site. The current City policies require that the difference between the historic rate of run-off and the developed rate of run-off be detained onsite. The release rate is to be no greater than the 2 Year Storm historic rate. The drainage plan and report for The Gateway at Harmony Road P.U.D. has established the detention requirement for the site at the difference between the allowed run-off rate, 0.5 c.f.s./acre; and the 100 Year storm event. The proposed detention facilities will outfall to the 42 inch storm drain located along College Avenue. The on -site detention is to be provided at two separate areas within the parking lots on the site. The City's policies normally require that the adjacent street flows be incorporated with the onsite detention requirements. This policy applies most efficiently when the street construction and onsite detention are performed concurrently. In this instance, it is not physically feasible to combine the two flows since the flow generated on the streets can not be intercepted and directed into an on -site detention facility and then routed back into the curb and gutter. The area within the westerly half of the College Avenue right-of-way has been considered as tributary to. the detention facilities for sizing purposes. The existing detention facilities located to the West and North of the site outfall through a storm drain pipe that is located on the proposed Maken II -P.U.D. site. The existing pipe is situated under a portion of the proposed structure. Therefore the storm drain pipe will need to be relocated in order to avoid conflict with the structure. The established physical features surrounding the site greatly limit the ability to make vertical elevation changes that would allow for a single detention basin.to be provided. This also poses the problem that in order to maximize the detention volume to be placed on the site, the depth of detained run-off exceeds the desired depth of one foot. Therefore, a variance to the City's standards is requested. EROSION CONTROL MEASURES Erosion control considerations are based upon the short term activities that occur during construction and the long term measures that are to be placed for the life of the facility. The long term measures are the proposed methods and materials to be used to provide surface treatments for the driveways, parking areas, walkways and the landscape materials and plantings in the open areas that will provide a combination of ground covers to deter erosion. P6 The anticipated construction schedule should have the site grading completed, within one (1) week after' commencing construction. The schedule for construction activities is anticipated to be: Week 1, install erosion control and perform site grading; Weeks 2 & 3, construct drainage related facilitiesand install additional erosion control measures; Weeks 3 & 4, install building foundation and water and sewer service lines; Weeks 5 through 18, construct structure; Weeks 9 & 10, construct curb, gutter and sidewalks; Week 10, place pavement; and Weeks 17 & 18, install landscaping. The recommended short term erosion control methods to be incorporated with the construction activities consist of the following: prior to commencing construction a "Silt Fence" is to be placed along the eastern boundary of the site in order to control and contain mud and debris onsite; upon completion of grading operations and at the time that the drainage inlets are installed a "Straw Bale Filter" is to be placed at each inlet; and tracked mud to be cleaned up as required. Wind erosion measures are to consist of water application and roughening of exposed surfaces., CONCLUSIONS AND RECOMMENDATIONS 1. The proposed development will retain the "historic" drainage patterns. 2. The site is located in the McCLELLANDS/MAIL CREEK DRAINAGE BASIN. The site is not located within a defined floodway or flood plain. 3. All development is to be performed in accordance with City of Fort Collins criteria. A variance to the City's policies is requested from detention of adjacent street flows due to physical impracticality. 4. Onsite detention of storm water is required by the City of Fort Collins. The volume of run-off to be detained is estimated to be 8,160 cu. ft. The detention volume has been determined based upon the calculated volume of run-off generated by a 100 Year Storm. The site and the adjacent drive at the West side of the site have been considered as the tributary area to determine the volume of the detention basins. The calculated volume generated from the tributary area is to be released at a controlled rate determined by the sum of the Master Plan rate of run-off, 0.5 c.f.s./acre from the site plus the rate of run-off for the drive to the West of the site. The calculated release rate is 0.53 c1s. 5. A variance is requested from the City's standard regarding the depth of detained storm water within a parking lot. In order to provide the maximum on -site detention facilities will require ponding to a maximum depth of one and one half (1- 1/2) foot. A variance is requested to allow for the discharge of storm water from College Avenue and the adjacent right-of-way without detention. This area indicated as Area'C' is below the site and can not drain onto the site. 3 6. The City of Fort Collins Standards for temporary erosion control measures are to be incorporated with the construction activities. Specifically, the following are to be incorporated in the site construction activities: a. A "Silt Fence" is to' be placed along the easterly border of the site: b. "Straw Bale Filters" are to be placed at each inlet. C. Water application is to be made to prevent dust during the site development phase of the project. d. Roughening of the exposed earth surfaces shall take place during the site development phase of the project. 1. City of Fort Collins, STORM DRAINAGE DESIGN CRITERIA AND CONSTRUCTION STANDARDS, May 1984 with subsequent revisions and additions. 2. Final Drainage Report for The Gateway at Harmony Road P.U.D., prepared by Stewart and Associates, Inc., Fort Collins, Colorado, May 1, 1989. 3. Drainage and Erosion Control Report for The Gateway at Harmony Road P.U.D. Third Filing, prepared by WESTEC, Fort Collins, Colorado, July 19, 1995. 4. Drainage and Erosion Control Report for Taco Cabana P.U.D. Third Filing, prepared by WESTEC, Fort Collins, Colorado, July 19, 1995. 4 STORM WATER DETENTION SUMMARY SITE DRAINS TO "McCLELLANDS / MAIL CREEK" DRAINAGE BASIN GROSS SITE AREA (includes 1/2 of College Ave.) = 44,809 Sq. Ft. = 1.03 Ac. t NET SITE AREA = 37,134 Sq.Ft: = 0.85 Ac. f HISTORIC "C" = 0.20 DEVELOPED "C" = 0.85 HISTORIC "Q2" = 0.54 c.f.s. MASTER PLAN RATE OF RELEASE = 0.50 c.f.s. / acre PEAK DISCHARGE FROM DETENTION, Q = 0.53 c.f.s. BASIN "A" - CRITERIA BASED DETENTION VOLUME = 4,944 Cu.Ft. t BASIN "B" - CRITERIA BASED DETENTION VOLUME = 3,216 Cu.Ft. ± BASIN `A" -PLAN DETENTION VOLUME = 4,840 Cu.Ft. BASIN "B" - PLAN DETENTION VOLUME = 3,256 Cu.Ft. BASIN "A" - MAXIMUM DEPTH OF DETAINED WATER = 1.5 Ft. 0 High Water Elevation 5034.00 BASIN "B" - MAXIMUM DEPTH OF DETAINED WATER = 1.5 Ft. ® High Water Elevation 5034.00 September 11, 1998 Project No. GRD - 286 - 98 Mr. Basil Hamdan Stormwater Utility City of Fort Collins 235 Mathews R O. Box 580 Fort Collins, Colorado 80522 - 0580 Re: Maken II - P.U.D., Fort Collins, Colorado Dear Mr. Hamdan, The estimated cost for erosion control devices for the subject site has been estimated to be: 1. - Silt Fence 2. Straw Bale Filter 19011 @ $2.5b/ft. = 2 Each ® $75.00/Ea. Total Cost ® 150% = 1.5 x $625.00 $475.00 $937.50 The cost to re -seed the 37,157 square foot site at $0.0298/sq.ft. = $1,107.28 150% of the re -seeding cost = 1.5 x $1,107.28 = $1,660.92 Therefore, the subject project's estimated erosion control security amountis determined to be $1,660.92. This amount is to be included as surety for the erosion control guarantee along with any other surety requirements that may be a part of the City's "Developer's Agreement" requirements. If you should have any questions or desire additional information, please feel free to contact this office. y Submitted, Engineering. Inc. Dennis R. Messner, President cc: Springer Investment Group Civil and Environmental Engineering Consultants 150 E. 29th Street,.Suite 238 Loveland, Colorado 80538 Telephone: (970) 663-2221 Hr, 0514 Hv"$ VICINTY MAP (Nat -to -scale) NIKE9R' ✓ _!.r ROE�c'��.rs _S� fa r ZBt STDW DO I ET00T I � �r — 1� � s f 9 0elm((` � �S � :I EEE °0 URGUN Sid �; .EOF4 Q�eTOrE?i=so,, 4 ems i ' S y• �..s 3FUSAC �.. 3FUA n H � ems' � AI$ION WAu4 ENAD `w CT R $t+ELMMURS� '�k9U ! a} 5� ,TPA d sA`� Ai' uI C r ffTAQL.rG!; peE50 a j YAoi cw kit TpUTMAYI IC1 N�JI fE,Ey�*4 u LE 8 ra+-l+EC \Sylef i e 3f0P1� �wL E'SI TO SEAM. t MARMOMT D 5 _{ cfue _.......^ e .` ... 2 EETUMFIELD CT 3 TROUTMAN PKW g' '.� r MASSAU CT 5 ROIANN CT . S ELISMERE CT ^/FRAME •; ODESSA CT •�i,Y, ,.. 3 � � F/IM.T LM .. W • l I'' .. ,'. V.o 11 Cti .. 29T '.`APPLE .L BEOSSOM L . ' .. . _ des C{ O x FOS CK �+ aDUT LVIEWn` ♦ 1cnvff bU MAKEN II P. U. D. Property Description: Lot 3 of The Gateway At Harmony Road P. U. D. Third Filing, Fort Collins, Colorado -I 7C$YAvVL DRAINAGE INVESTIGATION CALCULATIONS Client: SPRINGER INVESTMENT GROUP Project No: GRD-286-98 Project MAKEN lI P.U.D. Date: 5/19/98 Location: Lot 3 Gateway P Harmony Road P.U.D., Fort Collins, CO By: D.R.M. This investigation is being performed to determine the requited detention volume, discharge rates, and structure sizing for the subject project site. The site is located in the "McClellands / Mail Creek" Drainage Basin. RATIONAL METHOD Runoff Coefficients, "C" RATIONAL METHOD City of Fort Collins S.D.D.C.&C.S. (fable 3-3) Frequency Adjustment Factors Land Use Description "C' Building/Roofs 0.95 Drives and Walks 0.95 Gravel Surfaced 0.50 Undeveloped Areas 0.20 Grassed Landscaped Areas 0,15 EXISTING CONDITIONS: Storm Return Period ears Freq. Factor "Cf 2 1.00 5 1.00 10 1 1.00 lOD 1.25 Offsite & On -site Area Draining to S. College Avenue Offsite Basin 91 + Onsite Basins "A", "B", "C" & "D" Building/Roof Drives and Walks Gravel Surfaced Landscape Undeveloped Open Areas Area= 0 Sq.Ft. Area= 7,040 Sq.Ft. Aim = 0 Sq.Ft. Area= 35,374 Sq.Ft. IandscapedAmas Area= 1,070 Sq.Ft. TOTAL SITE AREA Area = 43,484 Sq.Ft. = 1.00 Acres Avg. C = [(0.95 x 0)+(0.95 x 7,040)+(0.50 x 0)+(0.20 x 35,374)+(0.15 x 1,070)] + 43,484 Avg. "C" = 0.32 Time of Concentration Overland: Tom 1.87(1.1 - CCf ) 4D + SN/3 Distance, D = 160 Ft. Elev. Diff. = 5037. 5033 = 4 Ft. Slope, S = Elev. diff. / Dist. = 4 /.160 = 0.025 Ft. / Ft. Page 1 of 9 DRAINAGE INVESTIGATION CALCULATIONS Client: SPRINGER INVESTMENT GROUP Project No: GRD-286-98 Project: MAKEN 11 P.U.D. Date: 5119M Location: Lot 3 Gateway Harmony Road P.U.D., Fort Collins. CO_ By: D.R.M. EXISTING CONDITIONS: Offsite & On -site Area Draining to S. College Avenue - Offsite Basin #1 + Onsite Basins "A", "B", "C" & "D" (continued) To = 1.87(1.1 - CCf ) JD + SAl/3 - 1.87 (1.1 - (0.32 x 1.00)) 4160 / 2.SA1/3 = 13.60 Min. Time of Concentration Channeliaed: Distance, D ® 150 Ft. Elev. Diff. = 5033 - 5031.5 = 1.5 Ft. Slope, S = Elev. diff. / Dist. = 1.5 / 150 = 0.01 Ft. / Ft. From Figure 3 - 2. Velocity across "Nearly Bare Ground" @ 1.0 % = 1 Ft. / Sec. Time Channeli2ed, Tch = Dist. / ( Vel. x 60) = 150 / ( 1 x-60) = 2.5 Min. Time of Concentration, Tc = To + Tch = 13.6 + 2.5 = 16.1 Min. USE tc = 15 Minutes Rainfall Intensities, @ Tc = 15 minute I 2 = 2.10 in. / hr. I 100 = 6.00 in. / hr. Q=CiACf Q 2 = 0.32 x 2.10 x 1.00x 1.00= 0.67 c,f.s. Q.100 = 0.32 x 6.00 x 1.00 x 1.25 = 2.40 c.f.s. PROPOSED CONDITIONS: The rate of release from detention has been established by the original "Gateway at Harmony Road P.U.D." Therefore, no calculations have been made to determine the run-off volumes based upon the calculations for the existing conditions. The original "Gateway at Harmony Road P. U. D." report has determined the detention release rate to be 0.5 c.f.s. / acre. (Refer to the FINAL DRAINAGE REPORT, THE GATEWAY AT HARMONY ROAD P.U.D., May 1, 1989, prepared by Stewart & Associates, Inc.) Area Draining to Detention in South Parking ' Lot Offsite Basin #1 + Onsite Basin 'A' Budding/Roof Area 5,720 Sq.Ft, Drives and Walks Gravel Surfaced Landscape Undeveloped Open Areas Landscaped Auras TOTAL AREA Area=- '20,423 Sq.Ft. Area 0 Sq.Ft. Arm = 0 Sq.Ft. Arm = 1,459 Sq.Ft. Area= 27,602 Sq.Ft. = 0.63 Acres Page 2 of 9 0 DRAINAGE INVESTIGATION CALCULATIONS Client: SPRINGER INVESTMENT GROUP Project No: GRD-286-98 Project: MAKEN II P.U.D. Date: 5/19198 Location: Lot 3, Gateway R Harmony Road P.U:D., Fort Collins, CO By: D.R.M_ PROPOSED CONDITIONS: Area Draining to Detention in South Parking Lot - ORsite Basin #1 + Onsite Basin 'A' (continued) Avg, C = [(0.95 x 5,720)+(0.95 x 20,423)+(0.50 x 0)+(0.20 x 0)+(0.15 x 1,459)j + 27.602 Avg, "C = 0.91 DETENTION VOLUME CALCULATION FOR PROPOSED SITE CONDITIONS QRelease = 0.5 c.Wacre per original Gateway at Harmony Road P.U.D. . QRelease = 0.5 c.f.s./acre x 0.63 ac. = 0.32 c_f.s. CCf = 0.91 x 1.25 = 1.11 > 1.00 Therefore, USE CCf = 1.00 At Q100 Proposed = CIACf = 1.00 x I x 0.63 = 0.63 x I (in./hr.) Time min. Rainfall Int., I in./hr. Q100 Prop. c.f.s.l Vol. @ Q100 cuff[. Q Rel. @ 2 Yr. c.f.s.) Vol. Rel. (cu.ft.) Vol. Diff, (cu.R 10 7.15 4.50 2 700 0.32 192 2,508 15 6.00 3.78 3 402 0.32 288 3,114 20 5.15 3.24 3 888 0.32 384 3 504 25 4.55 2.87 4,305 . 0.32 480 3,825 30 4.10 2.58 4,644 0.32 576 4,068 40 3.45 2.17 5,208 0.32 768 4,440 50 2.95 1.86 5.580 0.32 960 4,620 60 2.65 1.67 6 012 ZILZZ-0.32 1 152 4 860 70 2.35• 1.48 6 216 0.32 1 344 4.872 80 2.15 1.35 6480 0.32 1536 4 944 90 1.95 1.23 6 642 0.32 1,728 1 4,914 100 1.75 1.10 1 6,600 1 0.32 1,920 4.680 110 1.60 1.01 1 6,666 1 0.32 2 112 4,554 120 1.45 0.91 1 6,552 1 0.32 2,304 4.248 Therefore, a minimum of 4,944 cu, ft. of Detention Storage Volume is desired for Basin 'A'. 9 Page 3 of 9 DRAINAGE INVESTIGATION CALCULATIONS Client: SPRINGER INVESTMENT GROUP Project No: GRD-286.98 Project: MAKEN H P.U.D. Date: 5/19/98 Location: Lot 3 Gateway @ Harmony Road P.U.D.. Fort Collins. CO By: D.R.M. PROPOSED CONDITIONS: Area Draining to Detention in South Parking Lot - Offs1te Basin #1 + Onsite Basin 'A' (continued) A• 1,1 T_ ✓l�l y,"..0 ,� Elevation lam/ Area (Sq. Ft Avg, Area (Sq. Ft. Elev, Diff. t. Volume Cu. Ft. E Volume Ci. Ft.) Outlet 503350 12 281 0.25 70 70 5033.75 550 1.263 0.25 316 386 5034.00 1975 2,575 0.25 644 1030 5034,25 3175 3,798 0.25 947 1977 5034.50 4,400 5.100 1 0.25 1,275 1 3,252 5034.75 5,800 6,550 0.25 I637.5 4,890 5035 7,300 4,890 - 4,944, Therefore Volume @ Elev. 5034.00 OK Area Draining to Detention in East Parking Lot Offsite Basin #2 + Onsite Basin 'B' + Onsite Basin 'C' (College Ave.) + Onsite Basin 'D' Building/Roof Drives and Walla Gravel Surfaced Landscape Undeveloped Open Arms Landscaped Arts Area= 5.909 Sq.Ft. Area= 13,315 Sq.Ft. Area= 0 Sq.Ft. Area = 0 Sq.Ft. Area = 4,157 Sq.Ft. (includes 1/2 of College Ave.) (includes 1/2 of College Ave.) TOTAL SITE AREA Area 23,381 Sq.Ft. = 0,54 Acres Avg. C = ((0.95 x 5,909)+(0.95 x 13,315)+(0.50 x 0)+(0.20 x 0)+(0.15 x 4,157)) + 23,381 Avg. "C" = 0.81 DETENTION VOLUME CALCULATION FOR PROPOSED SITE CONDITIONS QRelease = 0.5 c.fsiacre x 0.54 ac. = 0.27 c.f.s. CCf = 0.81 x 1.25 = 1.18 > 1.00 Therefore, USE CCf = 1.00 At Q100 Proposed = CIACf = 1.00 x I x 0.3 = 0.54 x I (in../hr.) Page 4 of 9 DRAINAGE INVESTIGATION CALCULATIONS Client: SPRINGER INVESTMENT GROUP Project No: GRD-286-98 Project: MAKEN II P.U.D. Date: 5/19198 Location: ' Lot 3 Gateway @ Harmony Road P.U.D., Fort Collins, CO By: D.R.M. PROPOSED CONDITIONS: Area Draining to Detention in East Parking Lot - OfYsite Basin #2 + Onsite Basin 'B' + Onsite Basin 'C' + Onsite Basin 'D' (continued) DETENTION VOLUME: Time min. Rainfall Int., I (in./hr. QI00 Prop. c.f s. Vol. @ Q100 cu.ft. Q Rel. @ 2 Yr. c,f.s,) Vol. Rel. (cu.ft.) Vol.*Diff. (cu.ft 10 7.15 3.86 2 316 0.27 162 2,154 15 6.00 3.24 2 916 0.27 243 2 673 20 5.15 2.78 3,336 0.27 324 3,012 25 4.55 2.46 3 690 0.27 405 3,285 30 4,10 2.21 3,978 0.27 496 3,492 40 3.45 1.86 4 464 0.27 648 3,916 50 2.95 1.59 4 770 0.27 810 3 960 60 2.65 1.43 5148 0.27 972 4176 70 2.35 1.27 5.334 0.27 1,134 4,200 80 2.15 1.16 5.568 0.27 1,296 4,272 90 1 1.95 1.05 5,670 0.27 1 458 4.212 100 1 1.75 0.95 5 700 1 0.27 1 1,620 4 080 110 1.60 0.86 5 67b 0,27 1,782 3,894 120 1 1.45 0.78 5,616 1 0.27 1 1,944 3 672 Therefore, a minimum of 4,272 cu. ft. of Detention Storage Volume is desired for Basin'B' with College Avenue considered as contributing. Consider Detention Volume required without College Avenue contributing: Building/Roof Arm = 5,909 Sq.Ft. Drives and walks Area = 8,962 Sq.Ft. (w/o College Ave.) Gravel Surfaced Landscape Area= 0 Sq.Ft. Undeveloped Open Arras Area = 0 Sq.Ft. Landscaped Areas Area = 2.814 Sq.Ft. (w/o College Ave.) TOTAL SITE AREA Area = 17.685 Sq.Ft. = 0.41 Acres Avg. C = [(0.95 x 5,909)+(0.95 x 8,962)+(0.50 x 0)+(0.20 x 0)+(0.15 x 2,814)) + 17,685 Avg. "C" = 0.82 DETENTION VOLUME CALCULATION FOR PROPOSED SITE CONDITIONS QRelease = 0.5 c.f.s./acre x 0.41 ac. = 0.21 c.f.s. CCf = 0.82 x 1.25 = 1.03 > 1.00 Therefore, USE CCf = 1.00 At Q100 Proposed = CIACf = 1.00 x I x 0.3 = - 0,41 x I (in./hr.) Page 5 of 9 DRAINAGE INVESTIGATION CALCULATIONS Client: SPRINGER INVESTMENT GROUP Project No: . GRD-286-98 Project: MAKEN II P.U_D. Date: 5/19l98 Location: Lot 3 Gateway @ Harmony Road P.U.D.. Fort Collins, CO By: D.R.M. PROPOSED . CONDITIONS: Area Draining to Detention in East Parking Lot Offsite Basin #2 + Onsite Basin 'B' + Onsite Basin 'C' + Onsite Basin 'D' (continued) DETENTION VOLUME: Consider Detention Volume required without College Avenue contributing: Time min. Rainfall Inc., I in./hr. Q100 Prop. c.f.s. Vol. @ QlW (cu.ft.) Q Rel. @ 2 Yr. (c.f.s.) Vol. Rel. (tuft Vol. Diff. cu.ft. 10 7.15 2.93 1758 0.21 126 1,632 15 6.00 2.46 2,214 0.21 189 2025 20 5.15 2.11 2 532 0.21 252 2,280 25 4.55 1.87 2,805 0.21 315 2,490 30 4.10 1.68 3,024 1 0:21 378 2,646 40 3.45 1.41 3 384 0.21 504 2,880 50 2.95 1.21 3 630 0.21 630 3,000 60 2.65 1.09 3 924 0.21 756 3 168 70 2.35 0.96 4 032 0.21 882 3 150 80 2,15 0.88 4224 0.21 1,008 3,216 90 1 1.95 1 0.80 4.320 0.21 1,134 1 3 186 100 1.75 1 0.72 4 320 0.21 1,260 3 060 110 1.60 1 0.66 4,356 1 0.21 1,386 2 970 120 1.45 1 0.59 4,248 1 0.21 1.512 1 2,736 Therefore, a minimum of 3,216 cu. ft. of Detention Storage Volume is desired for Basin 'B' without College Avenue considered as contributing. Since it is not physically feasible to route the run-off from College Avenue onto the site' and the additional volume would place an undue liability due to the depth required to generate the desired volume, a waiver to the requirement of detaining the adjacent street is to be made. Note that the street flows art directed to existing inlets that discharge to the existing 42" storm drain at the eastern side of the site. Therefore, the storm drain will retain the existing flows. 31256 > 3,216 Therefore, Volume at Elev. 5034.00 OK Page 6 of 9 DRAINAGE INVESTIGATION CALCULATIONS Client: SPRINGER INVESTMENT GROUP Project No: GRD-286.98 Project: MAKEN II P.U.D. Date: 5/19/98 Location: Lot 3 Gateway 0 Harmony Road P.U.D.. Fort Collins, CO By: D.R.M. PROPOSED CONDITIONS: Determine Orifice Opening Area for Basin 'A': Orifice Equation: Q - CA J2gh h - 5034.00 - 5031.50 = 2.50 ft. Q Release = .0.32 c.f.s. C = 0.65 A = Q / (C42gh) = 0.32 / (0.65 4(2 x 32.2 x 2.50)] = 0.04 sq.ft_ With Round Opening A = rrr" 2 Radius, R = JA/a = J 0.041n = 0.11 ft. Radius, R = ft. x 12 in./ft. = 1.32 in. With Square Opening A = w^2 Width of Opening, W = JA = 40,04 = 0.20 ft. Width of Opening, W = ft. x 12 in./ft. = 2.40 in. Use 2-318" dia. Round Opening or 2-318" Square Orifice opening for outlet control device. Determine Orifice Opening Area for Basin 'B': Orifice Equation: Q = CA 42gh h = 5034.00 - 5031.50 = 2.50 ft. Q Release = 0.21 c.f.s. C = 0.65 A = Q / (CJ2gh) = 0.211 (0.65 J(2 x 32.2. x 2.50)] = 0.03 sq.ft. With Round Opening A = nr^2 Radius, R = JA/n = J 0.03/7r = 0.10 ft. Radius, R = ft. x 12 in./ft. = 1.20 in. With Square Opening A = WA Width of Opening, W = JA = 40.03 = 0.17 ft. Width of Opening, W = ft, x 12 in./ft. = 2.04 in. Use 2.112" dia. Round Opening or 2" Square Opening for outlet control device. Page 7 of 9 DRAINAGE INVESTIGATION CALCULATIONS Client: SPRINGER INVESTMENT GROUP Project No: GRD-286-98 Project: MAKEN II P.U.D. Date: 5/19198 Location: Lot 3 Gateway (a Harmony Road P.U.D.. Fort Collins, CO By: D.R.M. PROPOSED CONDITIONS: CHECK FLOWS -FOR PROPOSED CONDITIONS: Consider Offsite and Onsite areas concentrating at Basin 'A' Offslte Area #1 Building/Roof Drives and Walks Gravel Surfaced Landscape Undeveloped Open Areas Landscaped Areas . Area= 0 Sq.Ft. Area= 6,370 Sq.Ft. Arm = 0 Sq.Ft, Arm = 0 Sq.Ft. Area= 1.390 Sq.Ft. TOTAL SITE AREA Area 7,760 Sq.Ft. _ ! 0 18 Acres Avg. C = [(0.95 x 0)+(0.95 x 6.370)+(0.50 x 0)+(0.20 x 0)+(0.15 x 1,390)) + 7,760 Avg. "C.' _ 0.81 Time of Concentration Overland: To = 1.87(1.1 - CCf) dD + SAlr3 Distance, D = 60 Ft. Elev. Diff. = 5038.5 - 5036.5 = 2 Ft. Slope, S = Elev. diff. / Dist. = 4 / 60 = 3.33 % To = 1.87(1.1 - CCf ) 4D + SAJ/3 = 1.87.(1.1 - (0.81 x 1.00)) d60 / 3.33A1/3 = 2.30 Min. Time of Concentration Channelized: Distance, D = 115 Ft. Elev. Diff. = 5036.5 - 5035.5 = 1 Ft. Slope, S = Elev, diff. / Dist = 1.0 / 115 = 0.87 % From Figure 3 - 2. Velocity across "Shallow Gutter Flow" @ 0.9 % = 1.9 Ft. / Sec. Time Channelized, Tch = Dist. / (Vel. x 60) = 115 / ( 1.9 x 60) = 1.01 Min. Page 8 of 9 DRAINAGE INVESTIGATION CALCULATIONS Client SPRINGER INVESTMENT GROUP Project No: GRD-286698 Project MAKEN II P.U.D. Date: 5/19/98 Location: Lot 3 Gateway Harmony Road P.U.D., Fort Collins, CO By: D.R.M. PROPOSED CONDITIONS: Consider Offsite and Onsite areas concentrating at Basin 'A' - Offsite Area 'A' (continued) Time of Concentration across paved parkingiot. _ Distance, D = 135 Ft. Elev. Diff. = 5034.5 - 5033.0 = 1.5 Ft. Slope, S - Elev. diff. / Dist. = 1.5 / 135 = 1.11 From Figure 3 - 2. Velocity across "Paved Area Flow" @ 1.1 % = 2.1 Ft. / Sec. Time Channelized, Tp = Dist / ( Vel. x 60) = 135 / ( 2.1 z 60) = 1.07 Min.. Time of Concentration, Tc = To + Tch + Tp = 2.30 + 1,01 + 1.07 = 4.38 Min: USE tc = 5 Minutes Rainfall Intensities, @ Tc - 5 minute I 2 = 3.25 in. / hr.. I 100 s 9.00 in. / hr. Q=CiACf Q2=0.81.x3.25x0.18x1.00= 0.47 c.f.s. Q 100 = 1.00 x 9.00 z 0.18 = 1.621 c.f.s. Flow to be carried in gutter or valley pan n = 0.016 Q = 1A86 ARA213 SA1/2 + n Slope, S = 0.012 @ 2" depth in valley - pan Area, A = _ 1.53 sq. ft. Wp = 12.33 ft, R = A/Wp = 0.12 ft. Q = 3,79 c.f.s. 3,79 >> 1.62 Therefore, OK Total Flow exiting Site from piped system: . Q out of Basin 'A' + Qout Basin 'B' = 0.32 + 0.21 = 0.53 c.f.s. Q from upstream detention = 0.65 c.f.s. Check for Q = 0.32 + 0.65 = 0.97 c.f.s. @ 12" dia. w/ S = 0.6% Q = 2.76 c.f.s. Check for Q = 0,32 + 0.21 + 0.65 = 1.18 c.f.s.: @ 15" dia. w/ S = 2.8% Q = 10.81 c.f.s. Page 9 of 9 A RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: STANDARD FORM A MAKEN II P.U.D. COMPLETED BY: '-Messner Enor. Assoc. D.R.M. DATE: 11_ 96 DEVELOPED ERODIBILITY Asb Lsb Ssb Sb PS SUBBAgIN ZONE (ac) (ft) M (feet) (t) M Entire Moderate 0.853 235 1.3% 77.7 Site MAACH 1991 8.14 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS TANDARD FORM B PROJECT: MAKEN II P.U.D.' DATE: 11-22-96 COMPLETED BY: MPcsner Enjr Assoc D R M Erosion Control C-Factor P-Factor Method Value Value Content Bare Soil 1.00 1.00 Road/Walk 0.01 1.00 Silt Barrier 1.00 0.50 Sediment Trap 1.00 0.50 Gravel Filter 1.00 0.80 MAJOR PS SUB AREA BASIN M BASIN (AC) CALCULATIONS ntire 77.7 0.853 O.B53 Bare Soil = 0.40 ac. Road/Walk = 0.453 ac. wtd. C = (1.0 x 0.40) + (0.01 x 0.453)/ 0.653 =0.47 wtd. P = 0.5 x 0.5 x 0.5 = 0.13 Eff. = (1 - Pc' x 'P')) x.100 _ (1 - (0.47 x 0.13)) x 100 = 93.9 93.9V)77:7 Therefore, OK MARCH 1991 8.15 oesIGH CRITERIA CONSTRUCTION SEQUENCE PROJECT: MAKFN TT n rt r STANDARD FORM C SnQUEaCa FOR 19 97 ONLY COMPLETED BY: Messner Enar'._ D.R.M.DATE: 11_2 —96 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR MONTH -------------------•------- OVERLOT GRADING WIND EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Sail Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other ---------------------------- 1997 Jan-1 Feb! Markpr I May! Junl JullAug ISep IOct INov IDec 1. i I I ----------------••-------•--------------------•-------------� STRUCTURES: INSTALLED BY MAINTAINED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON HDI/SF-C:1989 . Ii:Zd�'1[s7:IKsL`YL'Za]MZP111Ya The City of Fort Collins StarmFater Wlily session control inspector must be mUOed at least 24 hours prior to any construction an this site. NI r qu'red perimeter Gill fencing shall be install year to any land disturbing octiviy (slockpilmg. stripping• grading. etc,), At other required control measures sholl be insisted at Pe appropriate time In the mmWclion sequence tie indicated in the approved project schedule. construction plans. and erosion control report. Pre -disturbance vegetation shall be Protected and retained whemer Qaibe. Removal or disturbance f existing vegetation shall be limited to the or required for immediatecroslructi n Perform and for the shortest practical pence of time Design Pent Basin Mao Designation (=vas) ROUond 'C' Or (C-W aim (cf.a.) 06L Veluma (cn K) 0 ReNaae WAL) D.P. 01 Offend /1 0.18 0.81 0.39 1.29 N/A N/A D.P. /2 ORsiG /2 0.04 0.15 0.m - D.OS N/A N/A [D.P 13 OnsiG 'A' 0,48 0.95 1.09 ZL g 4,944 0.32 OP. /4 OnMts B. 0.30 0.94 071 2.15 3.2te 0.21 O.P. /5 OnaRe 'C' 0.18 U.e1 O.E 129 N/A N/A D.P. /8 OnsiG U. OLIO 0.5 0.13 0.45 N/A MIA DP All soils gNpoxg sonny lava To kept i odMry (shipping. o. grading.utilityripity In or di cing along lind rising. etc.? Shsil be xReg in a . or oche condition 5y ering or trot is s. along Iona aonGms crew mulch, project H abler por wa shall ll rem control a j d m n site °I w mall it ea installed. no eo a aroes ameiae project street y vy mesa expo wed perm aieGrGp on ofor more than thirty land can before rise Time temporary unless a permanent voed control (e.g. sees UtilM, landscaping• etc) ts Installed, unless I otherwise approved by the Slormwoter Utility. ' The property shall be watered and maintained at oil time • during construction ` activities zaas to prevent wind -caused erosion. At land disturbing octiviies 4 enter be Immedialery discontinued when fugitive duet impacts adjacent properties, m determined by the City of Fart Collin Engineering Department. All temporary (structural) erosion control measures shall be inspected and repaired or reconstructed as necessary after each runoff event to assure continued performance of their function. AI relainem sediments. pordicularly these on paved modway surfaces, shall W removed and dip of In a Prowler and location so as not to cause their asterisk into any dnmageway. �e No soil stockpile shall exceed ten (10) feel In height. AI sail stockpiles shall few protected from sediment transport by surface roughening watering,, and perimeter I _ silt fencing. My mil stockpwe remaining alter 30 do" sMll be seeded and mulched. City Ordinance prohibits the backing, dropping, or depositing of voile or ne a any 184 Veil ry Pon - other motanol onto City streets by or from any vehicle. ANYmodyertanty deposited p SEE DETAIL material shall be cleaned immeairitely by the collimator. AT LEFT I I OFFSITE 'I BASIN /i I Existing 8' PVC e =r uarr Storm Drain-I(� I POINT #1 DESIGN :feting Manhole a. OR; 0+00 LSto and Verticdl r4' VALLEY PAN m 5we 503 1 C & Gutter v.8eN 5032.93t v.8R E = 5032.93t / Typically Indicates Existing 6' Vertical Curb @ Cutter FILTER FABRIC "OD POST _ l-- - exxmlEo TRENCH } :IIV FILTER FABRIC ATTACH SECURELY w000 POST TO vast 1. =Buren ENO nL1ERFF /�RU'OF ED fl1CNilL PER 1 p.zs A'.R6 aLn W iri* o RUNG" / RUNOr ratio. 2 MPEEm rep fEHR.M rial FYEM. M✓T'f SERYpr 10 'A➢wOXWRIFIY elal ME xYI ONE HOME Of PC MIN. . rNKsE Nw afar axlFD. AEYhID TRENCH mum 9WL K aFiO511ro He AN AREA M A 4anlwr EllIN SCLROX VICW ammEP�inlE SILT FENCE DETAIL WT TO SCALE .!7 Hook eRRrz A IIIIIIIII smur ova SEdaa win [ incase Res eDOLEA A mid mum rw� ZA¢x THE Mae. .SSEArN 2 INSHLOCT. Real AND wA.•6 THE % �. FILTERS AnneEAGI STORY EARY Ra.lo.E xvMETn FrmX DHE xur a THE ETFN CETH HASam ruID. �. SWICIE SIWO ix pa091ro rsW1^v1FAa e• MN 0 Ad Affix; TO A SELMn1r AN 16TAMa °X PUTS OR rtrnox A -A SR FIR 3 S ivnmm�o M OFr � ROME10nm AREA INLET FILTER STRAW BALES NOT 70STILE C� STORM WATER DETENTION SUMMARY SIDE DRAINS TO 'MCCLELLANOS / MAIL CREEK' OEUNAGE BASIN GRUBS STE AREA (included 1/2 of Collage Ave.) -46.401 Sq.It. - 1.07 Ac.2 NET SITE AREA - 37.157 Sq.FL - 0.853 M.3 HISTORIC •C• - 020 DEVELOPED OC' - O.B5 HISTORIC •02' - 0.54 CJ.s. CmTERm EASED MENTION VOLUME - BLISS Cu.Pt-* PUN DETENION VOLUME - 8.170 Cu.FL MAXIMUM DEPTH CIF MANED WATER - t.50It. MAXIMUM PENS DISCIWRCE FROM MENTION, 0-YIISTORIC' 02 + OOFTSTE =•1.72 c.fS 3 5Es> dots\ aRE= Existing Landscape Tim(xn to 12e Removed to Construct sidewalk along Rgar of Building � I Existing 6.1 6.2 /- - Jiffy Lucre IIIII111 / Building J DESIGN 1MI 6. POINT /2 J. 5. \ OFFSITE BASIN }'2 Proposed 'Silt Fen 5.7 / /roposed�Bur sing F.F./ 5036.25 7 Proposed Landscaping Wall Top of Wall = 35.25 -1F All FLOW L1,115 sxouA All FLOW wf uuL6>s ReiWie LreIUTm. Ewe 50 6. Ouvr W. Be PVC Storm . . /- lv 1+41.0 Top ¢ro- SInv.B- MJn/S= 502M Place Orifice Plate In Inlet SEE DETAII MCDONALDS BASIN aG' H.W. SEEM 15, 1 X011lEap-J�E-1}ht eraara srar[ m mnE[r SIT 11 xk 2y LLL - ar [ttlox txRu MRorx mrnox rxRu tExttx GRATED INLET TYPE 13 Storm •u�l•T EXISTING CURB a GUDERHI SECTION C-C SECTION D-D 1N sin 6aLrs 0 esa TO IOU o 2, 1 n 3ft M OR 2V sea data l2-2Y[ALL MIVSO naaNe wrz LY 2:r VON N• Y• n s leioa ORIFICE PLATE DETAIL u ■ ^ U. x..m r nuaAD raw c SOMEc[ FOR sine ONLY ewnnm EY: urines r.rw r w2 9-1_98 M RflE RED, ins MODI .. n O AN pemeRs Rmin s�wnmD site vs'ru.R'uTFe.� Not Applicable s:'Pstrike Site is Less than 1 Acre Other Retwe ronam-O mNrru ORkrm 1WOMEN SM. Evvi p. Fit F. Has w2°.W ov,..aw TZi" Vcs..rn n,M nnmmn T,,Nwwr ai pi waaakift Heelln9•/Nam/RMxbA aMxnea Rem ain w uRmANm w w¢1ARIMA^MINd CWRMIR wrt Sa9rnnD A^Rp.ID A vn v Mr lave w _ it �I Propose Londscoping Wall l Top of all 34.25 V 1 aywe o Proposed\lnlet A2 U Sta. 2+ 45 Top Grate �5032.50 m Inv.12'W= 5927.50 i Inv.15'S= 5026.373 (Match Exist.) Place Orifice Plate Horizontally w S N in Inlet SEE DETAIL AT RIGHT 3 , 5 xa� N 0.18 ac. C' .3 1.2 Existing Manr1hole 0 Sto. 3+38.74 Q-I' n ty Rim No 5031.30 UI Inv.15eNW=5024.96 LL Inv.42' N=5016.1t Inv.42e 5=5016.1t 10 aD E_..i W C _ z a lzi O 20 60 / Contour 2 Interval = 0.5' Zp V) wild R NOTE: I. top Of Curb is 0.5' Above Flow line Unless Otherwise W EllL Noted. 1y,y Z B 2. See Soils Report Ira Pavement Thickness. H a C k 1 ]. See MCM1itaduml Site Plan for Builmng Dimensions. rs� I W W Out - 50t3- Typically Indicates Exi ling a4 Ground Surtaca Contop U Typically Indicates Pro osed City of Fori Collins, Colorado g a IDlah Surface Contou UTILITY PLAN APPROVAL ZI o: o Q. \.ftvvv Drainage Basin Limit entifier APPROVEDyE Oir�m a QI 9 DATE: JULY 31,199E T I'Colly Indicates Ex' ing CHECKED BY: }zs•gp. SCALE: 65 NDrED 99.11 PPavement Surface El ation N°1O' a ^O�erURT� K DMWN: M.S.R. or Flow Line of Gutt CHECKED BY: ,46 '7-1/L-CHKD. 0 R M t y Typically Indicates Pr osed Pavement Surtaca El alion CHECKED BY: Project No. + or Flow Line of Cult ` R" °f"^ GRD-228-96 CHECKED BY: SHEEP Tycat Dcally e 9 Indicates Or a CC �� Floirection CHECKED BY: 3 of 6