Loading...
HomeMy WebLinkAboutLot Certifications - 12/27/2010Utilities City 0� electric • stormwater. wastewater • water Fort Collins For700 t PO Box 580 Fart Collins,, CO 80522 970.221.6700 970.221.6619 fax • 970.224.6003 TDD u6lities@fcgov.com • fcgov.com/ublihes CERTIFICATION OF LOT GRADING Pursuant to City Code § 26-544 and City Land Use Code § 3.2.2 (e) U �r Date: November 17, 2010 Zn Permit Application No. B1004835 1� Address: 3634 Copper Spring.Drive, Fort Collins, CO 80528 Lot: 11 Block: Block 1, McClelland's Creek PD & PLD Subdivision: Fossil Creek Ranch Fifth Filing I, Larry C. Owen, a Colorado registered professional engineer, verify that the above referenced property in the City of Fort Collins, Colorado, has been inspected by me or an appropriately qualified. professional under my direct supervision, and verify that construction of all stormwater facilities and grading is complete, and that the elevations and drainage patterns shown on the attached drawing(s) which were developed from a survey performed on October 30, 2010, accurately and truly depict the elevations and drainage patterns as they existed on the date of the survey. Based on this information, I certify that (check one): X The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved drainage and grading plan for the property (information attached). • See attached excerpt from approved overlot grading plan for subdivision, along with as -built grading plan for developed lot. ❑ The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/si(g,i a manner consistent with the approved drainage plan. SEE By: 3715 Shallow Pond Drive, Fort Col (address of signing party) NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Oecupan for the IoVsite, including but not limited to drawings of the lotlslts showing the approved design and as -bulk surveyed elevations of all structures, drainage and grading features (e.g. swales, retaining walls, lot comers), written Informationlexplanation of discrepancies, and other Information necessary to confirm the above certification to: j p rn a0 I � 05 ��I I IE 9�� 74 x i 1 l co � 0 W Z 0 Q I � CLa az �0¢ 0cr Cl LL 2 � W 2 W w0 4 qp z W 9�„} + �• o c c w r a re. lee °e+--�`�-- L w 0 +�+ �O it UO ZF ri O Ua U Q. O re• lee m d � Q r �. O 'p N c0 RY++' Co C E i O0 L� IO6• C 0 O U 3 � CL V C 0 O c6 ++ c v L �l rn Co a' M ot0 Z4m C L cnw wo w�a a Ow -*_ in OZ IM m co W 3 0 0. c o U) a +, mU) `L° 0- o n a) o m U a w a. N 0 Z 5 0 w 0 w U O� U 0 rx• r Z O I Ww N }w J � AA Oc