Loading...
HomeMy WebLinkAboutSite Certifications - 01/09/2017fipfrovcd 1 q / o 1Z wL F,�of t� ins COMMERCIAL, MULTI -FAMILY AND SUBDIVISION CERTIFICATION FORM & CHECKLIST (Overall Site Drainage) (Project Name) 04/11/16 (Date) (For Commercial or Multi -family, please list any applicable building permit numbers) Please fill in all applicable items in this Certification Form for Commercial, Multi -Family and Overall Single Family sites. A copy of the approved grading plan must be submitted with the as -built grading plan. (It is preferred to have the as -built elevations written in red next to the approved elevations) Use "OK" for items checked or actual numbers for items verified/surveyed in the field. OK does not necessarily indicate conformance with the design, only that the as -built information was obtained. See the Engineer's report for issues of conformance. Use "N/A" for items that are not applicable to the site that is being certified. Note: N/O = Not Observed. Please provide an As -Built Redlined or Mylar drawing showing the following: A. Detention, Drainage Facilities, and Common Open Spaces 1. Pond Certification Provide Topographic Records (grading certification with as —built spot elevations) and Volume Verification Calculations. Show both the proposed and as -built elevations on the same plan sheet. OK Provide Pond Cross -Sections and Spot Elevations (especially @ Pond Embankment and Pond Flow Line) OK Positive Fall to Pan (if applicable) OK General Pond Grading including all Side -Slopes OK Invert Elevation OK Forebay Construction and Elevation N/A Spillway Weir (Location, Elevation, Height, Opening Width) OK Placement and size of riprap or alternative permanent erosion control measures OK —N O Orifice Plate and/or Water Quality Outlet Structure Installation OK Water Quality Capture Volume (Volume Required, Volume Provided and Water Surface Elevation) OK Berm and Embankment Compaction Level OK Subsurface Media for Water Quality Ponds and Swales N O 12/12/2014 Revision — Page 1 of 5 2. Swales Location (are they within easement?) OK Dimension and Cross -Section Verification OK Longitudinal Slopes and Side -Slopes OK Spot Elevations OK Permanent Erosion Control Measures (drop structures N/A. riprap OK, lining N O Tie-in to Storm Lines, Pans, Curbs, or other appurtenances OK Required Minimum Freeboard, Provided Freeboard OK Landscaping Infringement on Flow Line? N O 3. Pioes Size and Type OK Slopes (As -Built and comparison to 0.4% Minimum) OK Pipe Capacity Calculations (if slopes are significantly altered from design) N/A Invert Elevations OK Installation and Backfill N O Cover N O Encasement and Clearance from other nearby utility lines N O Joints Type and construction N O 4. Concrete Pan Channels Size OK Slope OK Cross Section OK Thickness N O Elevations OK Wiof t` Collins 12/12/2014 Revision — Page 2 of 5 S. Inlets Size and Type OK Size of Opening (or name of Standard Detail used) OK Grate Elevation OK Invert Elevation OK Box Size OK 6. Street Cross -Pans Size OK Type OK Grade OK Elevations OK Cross -Sectional Depth OK Tie-in to Curb and Gutter OK 7. Culverts Size OK Type OK Invert Elevations OK Headwalls or Wing Walls OK 8. Sub -Drains Size N O Type (Perforated/Solid) N O Cover N O Backfill N 0 Geo-Textile Liners N 0 Clean -Outs N 0 City of , t� Collins 12/12/2014 Revision — Page 3 of 5 �of tfins 9. Curb Cuts Size OK Tie-in to Swale, Pipe or other appurtenances OK 10. Common Open Spaces Overall grading contours of open spaces OK Spot elevations adjacent to private lots (property corners) OK B. Low Impact Development (LID) Certification Not Applicable 1. LID Technique Specific Checklists (see attached) Permeable Interlocking Concrete Pavers (complete if technique utilized on site) N/A Bioretention Cells (complete if technique utilized on site) N/A C. Grading Certification Not Applicable 1. Certification of Grade Elevations Minimum Opening Elevations Top of Foundation Elevations Comparison to 100-year Water Service Elevations Comparison to Freeboard Elevations and Base Floodplain Elevations — BFE 2. Verification of Site Grading Engineer to evaluate site grading compliance with the approved grading plan. OK As -built elevations are to be redlined onto the approved grading plan sheet showing the as -built spot elevations next to the design spot elevations so compliance can be verified and documented. OK 12/12/2014 Revision — Page 4 of 5 F6rt Collins D. Post -Construction Site Cleanup Not Observed 1. Permanent BMP Measures Construction Debris Clean -Up (In particular debris affecting the drainage) Smoothing of Ruts in all Construction Areas Reseeding of all Areas Affected by Construction Activities (Usually enforced by the City's Erosion Control Inspector but the engineer certifying the site needs to notify the contractor if areas are not seeded) E. Statement of Compliance This certification is signed and stamped and by signing this form the Engineer attests that both he and personnel acting under his direct charge have inspected the site and that to the best of his knowledge the as -built conditions of the drainage facilities are as described in the above form, and in the attached report and in the As - Built plans enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. F. Signature and Stamp by a Colorado Registered Professional Engineer Engineer's contact information Gary T. Whitt, PE CivilArts, Inc. gwhittCcDcivilarts.us 1500 Kansas Ave, Suite 2E 303-682-1131 Longmont, CO 80501 12/12/2014 Revision — Page 5 of 5 / Iof ';Collins Construction Inspection Checklist for Permeable Interlocking Concrete Pavers Item/Activity Yes I No I N/A Documentation/Submittal Requirements Excavation Post -excavation infiltration rates are consistent with design infiltration capacity (for "full or partial infiltration' designs) Impermeable Liner Impermeable liner meets designspecifications Impermeable liner attached to concrete perimeter wall Im rmeablc liner is not exposed Any Penetrations of the impermeable liner have been sealed and checked for water -tightness. Concrete Cut -Off Wall Meets Specifications for: - Dimensions - Reinforcement - Footings Underdrain System Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanouts covers are installed and watertight Underdrain is NOT wrapped in gcotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test Aggregate Base coarse (e.g. #2/4 has 90% fractured faces Bedding coarse e.. #89 is thoroughly washed Subbase materials are installed and compacted according to manufacturer specifications Protection During Construction 12/122014 Revision —Page 1 of PICP area is protected from construction site sediment, including runoff from the upstream catchment and construction equipment traffic. Close Out Upstream catchment is stabilized prior to diverting runoff into PICP system of F&� �- Cry 12/122014 Revision — Page 2 of 2 /t`Coof lli � Construction Inspection Checklist for Bioretention Cells Item/Activity Yes I No I N/A Documentation/Submittal Requirements Excavation Heavy equipment did not travel over bioretention cell during excavation Bottom of cell was "ripped" after excavation Photograph before/after "ripping". Bottom of cell is flat and level Photograph Excavated area is protected/surrounded by sediment/runoff control BMPs during construction Photograph Inlet Inlet invert elevation is at least 3 inches above containment wall/berm Measuretrecord distance between inlet and top of containment wall/berm Upstream catchment drains to inlet Foreba Forebay is installed according to design specifications Forebay has flat, concrete bottom Outlet Structure/Overflow Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media filter Impermeable Liner Impermeable liner meets design specifications Impermeable liner attached to concrete perimeter wall Impermeable liner is not exposed Underdrain S stem Underdrain pipe is per design specifications At least one cleanout is provided per underdrain lateral Cleanout pipe is not perforated Cleanouts covers are installed and watertight Underdrain is NOT wrapped in geotextile fabric Underdrain orifice plate installed at outlet structure Underdrain integrity tested after backfilling using TV and/or water test 12/122014 Revision — Page I oft City of Fortes `� C Filter Media Filter media composition is per design specifications Filter media was "machine mixed" by supplier prior to delivery Filter media installed flat and level Other Structural Com onents Containment wall/berm is continuous and level Landscaping Final landscaping does NOT include sod Final landscaping wood/rock mulch is flat and level Vegetation is planted according to landscape design specifications Verify that weed barrier is not installed Temporary irrigation installed If N/A, then verify that permanent irrigation is installed to establish/maintain vegetation Close Out Upstream catchment stabilized prior to diverting runoff into bioretention cell 12/122014 Revision —Page 2 of 2 Bella Vira in Fort Collins, Colorado Overall Site Drainage Certification Engineer's Report of Issues of Conformance Prepared for: Richmond American Homes 4350 S. Monaco St. Denver, CO 80237 Prepared by. UV CIVILARTS 1500 Kansas Ave., Suite 2-E Longmont, Colorado 80501 303-682-1131 April 24, 2015 First Revision April 26, 2016 Second Revision December 16, 2016 Overall Site Drainage Certification Engineer's Report of Issues of Conformance Detention Ponds Detention Pond #1 is generally built in conformance with the design plan with the following exceptions and comments: 1) The approved Plans did not anticipate wingwal Is for the outlet structures which were subsequently requested by the City in May, 2015. These walls have been constructed in substantial conformance with the shop drawings issued by this office as far as we can ascertain by an as -built survey of the above ground portion of the walls. The dirt backfill required by these walls has affected the volumes reported previously in that the volume of dirt backfill required has diminished water volumes at all levels. 2) The 100-year volume is achieved at water surface elevation 5122.83 (5122.08 Plan). The Plan anticipates 6" of freeboard between the 100-year water surface and the top of the - ---- - - — outlet structure. _With the -top of the outlet structure at 5122.54 it is 3-1/2" lower than the 100 year volume. The most, likely reason for the deficiency is the fact that the bottom of the -pond is_ between 2" and 3" too high, the top of the outlet box is slightly low, and the - .wingwall backfill has significantly diminished this volume. The volume at 5122.54 is approximately 62,687 cu. ft. (69,696 cu. ft. Plan). --:3)'.-Pond Cross Sections and Spot Elevations are shown on Detail Sheets 7 and 4 respectively. 4) There is no pan in Pond # 1. 5)=-The pond grading and side slopes are in general conformance with the plan, the design side -slopes being 4.25: F and the as constructed side slopes averaging 4.5:1. The invert elevation of the pond as shown on as -built Sheet 48 of 50 is approximately 3" higher than plan consistent with the bottom of the pond being slightly high. 6) There is no Forebay. 7) The spillway weir is significantly different than the plan, but the plan itself is significantly flawed in this regard. The detail on Sheet 48 of 50 of the plan indicates a one foot drop in 4 feet either side of a 24-foot wide weir planned at elevation 5123.25. The Drainage Report anticipates a minimum 0.75 foot rise from where the weir begins to operate at elevation 5123.25 to the computed outflow elevation of 5124.0. This weir has a pedestrian trail overlaid per the approved design plan. The 4:1 slope for a pedestrian trail is not in conformance with ADA and Fair Housing requirements and the sidewalk was built per the Final Grading plan (Sheet 13 of 50) per the instructive notes on the plan. In the remediation plan of May, 2015, the owner agreed to raise the sidewalk at the southeasterly corner of the Pond to an elevation of 5124.25 in order to better obtain the required freeboard and not have the Pond spill in areas other than the spillway. This has been accomplished the lowest elevation reported herein being 5124.24. The weir was 2- 0 Overall Site Drainage Certification Engineer's Report of Issues of Conformance . reconstructed in June, 2015. It was planned to have a 12:1 weir slope for the 1-foot drop in compliance with ADA. This did not happen. After the sidewalk was re -constructed the low point of the weir continues to be built higher than plan (the low point being 5123.84 and much shallower (approximately 5-6" vs. 1.0 foot) and being approximately 22.6 feet wide (24 feet -Plan). As a result, the capacity of the overflow weir is better, but still less than the computed outflow rate presented in Table A.11.2 of the approved Final Drainage Report. The riprap installation was staked per the remediation plan of May, 2015 to encompass the entire width of the spillway to the toe of the slope of the Regional Detention Pond. The rip -rap was buried at the time of survey as -built and its extent and depth have not been confirmed. Spillway weir elevations are as shown on Detail Sheet 7. 8) As stated above the placement of the riprap was staked to cover the entire spillway but has not been confirmed. 9) The orifice plate.of the Water Quality Outlet Structure and the Structure itself are built in —-relatively-good-conformance with the design. See Sheet 48 of 50 for the details. Y 10) The Water.Quality Volume as constructed is 10,020 cu. ft. at elevation of 5119.36. Water.Quality:Volume is supposed to be 10,020 cu. ft. per the drainage report. -- - -_-- _ -.: -.1.1) The -Berm and Embankment Compaction Levels are conforming based on test results provided by the Developer and performed by CTL Thompson on January 29, 2015. -.:=.--12)The:installation of.the Subsurface Media for the Ponds and Swales was not observed. - Detention Pond #2 is generallybuilt in conformance with the design plan with the following exceptions: 1) The approved Plans'did not anticipate wingwalls for the outlet structures which were subsequently requested by the City in May, 2015. These walls have been constructed in substantial conformance with the shop drawings issued by this office as far as we can ascertain by an as -built survey of the above ground portion of the walls. The dirt backfill required by these walls has affected the volumes reported previously in that the volume of dirt backfill required has diminished water volumes at all levels. 2) The 100-year volume is achieved at water surface elevation 5122.56 (5122.22 Plan). The Plan anticipates 6" of freeboard between the 100-year water surface and the top of the outlet structure whereas the as constructed freeboard is approximately 3/4". The most likely reason for the deficiency is the fact that the wingwalls and dirt backfill were not anticipated and the top of the outlet box is slightly low. 3) Pond Cross Sections and Spot Elevations are shown on Detail Sheets 8 and 3 respectively. 4) There is no pan in Pond #2. -3- Overall Site Drainage Certification Engineer's Report of Issues of Conformance 5) The pond grading and side slopes are in general conformance with the plan, the design side slopes being 4.25:1 and the as constructed side slopes averaging 4:1. 6) The invert elevation of the pond is approximately 3" higher than plan. 7) There is no Forebay. 8) The spillway weir is significantly different than the plan. The detail on Sheet 48 of 50 of the plan indicates a one foot drop in 4 feet either side of a 24-foot wide weir planned at elevation 5123.5. The constructed low point of the weir is at elevation 5122.95 and therefore the outlet structure (elevation 5122.62) will now operate before the emergency overflow does. The outlet structure should perform as planned. The weir is 29.1 feet wide between an elevation of 5123.22 and 5123.68 and below. It rises 0.91 feet in 5.8 feet of width on the north side and rises 1.10 feet in 19.4 feet of width on the south side (or 0.37 feet in the south 11.3 feet). Additional material was recently placed on the previously deficient embankment areas to an elevation of between 5124.0 and 5124.6. -- — ------ Spillway weir elevations are as shown on Detail Sheet 8. 9)._ The -rip -rap located at and below the weir is now buried and was not observed. 10):The orifice.plate-of.the Water. Quality Outlet Structure and the Structure itself are built in —relatively good conformance with the design. See Sheet 48 of 50 for the details. 11) The -Water Quality Volume as constructed is 2,113 cu. ft. to the as -built water quality elevation-of_5118..21- This exceeds the volume computed from the Plan contours at 1,160 - - =- _ -- cu: ft. and the volume from the Drainage Report at 1,260 cu. ft. 12) The -Berm and Embankment Compaction Levels are conforming based on test results provided by the Developer and performed by CTL Thompson on February 2, 2015. -- - _ -- 13) The installation of the Subsurface Media for the Ponds and Swales was not observed. -4- J Overall Site Drainage Certification Engineer's Report of Issues of Conformance Detention Pond #3 is generally built in conformance with the design plan with the following exceptions: 1) The approved Plans did not anticipate wingwalls for the outlet structures which were subsequently requested by the City in May, 2015. These walls have been constructed in substantial conformance with the shop drawings issued by this office as far as we can ascertain by an as -built survey of the above ground portion of the walls. The dirt backfill required by these walls has affected the volumes reported previously in that the volume of dirt backfill required has diminished water volumes at all levels. 2) The 100-year volume is achieved at water surface elevation 5136.07 (5136.00 Plan). The Plan anticipates 6" of freeboard between the 100-year water surface and the top of the outlet structure —the as constructed freeboard is approximately 6". 3) Pond Cross Sections and Spot Elevations are shown on Detail Sheets 9 and 5, respectively. 4) There is a concrete pan in Pond #3. See Concrete Pan Channels below. -: - --5) -=The-pond-grading and side slopes are in general conformance with the plan, the design „ . side slopes being 4.2:1 and the as constructed side slopes averaging 4.4:1. _ - -6) The invert elevation of the pond is correct as constructed. 7) There is no Forebay. _8) _.The. spillway -weir is significantly different than the plan, but the plan itself is significantly flawed in this regard. The detail on Sheet 48 of 50 of the plan indicates a -one-foot drop -in 4 feef either side of a 20-foot wide weir planned at elevation 5137.5. _ -This weir has a pedestrian trail overlaid per the approved design plan. The 4:1 slope for a _ pedestrian trail is not in conformance with ADA and Fair Housing requirements and the sidewalk was staked but not precisely built per the Final Grading plan (Sheet 13 of 50) per the instructive notes on the plan. In April 2015, the owner agreed to rebuild the weir with a one -foot drop in 12 feet either side if a 20-foot weir. As constructed, the weir is somewhat deficient. It drops 0.6-0.7 feet in 12 feet each side of an 18.0-foot weir. The lowest elevation is 5137.62 feet (planned to be 5137.5 feet). Spillway weir elevations are as shown on Detail Sheet 9. 9) The riprap installed at the weir is buried and was not observed. 10) The orifice plate of the Water Quality Outlet Structure and the Structure itself are built in relatively good conformance with the design. See Sheet 48 of 50 for the details. 11) The Water Quality Volume as constructed is 4,320 cu. ft.at elevation of 5134.15. The Water Quality Volume per the Plan contours is 4,320 cu. ft. and the volume from the Drainage Report at 4,010 cu. ft. The Water Quality Volume as constructed is 4,320 cu. ft. which is the more conservative of the two volumes. - 5 - 0 Overall Site Drainage Certification Engineer's Report of Issues of Conformance 12) The Berm and Embankment Compaction Levels are conforming based on test results provided by the Developer on January 29, 2015. 13) The installation of the Subsurface Media for the Ponds and Swales was not observed. Swales In general, there are no standard details for the swale construction in the design plans (except on Sheet 50 of 50 in Erosion Control, Details and this detail was not used for design purposes) and therefore our analysis relies upon the contours shown on the Final Grading Plan Sheets 11-13 of 50. The location of all the major swales fall in the platted Tracts which are all Drainage Easements and therefore the locations are good. The remainder of the discussion is particular to each swale. -.___Swale.#1--has a.trapezo idal. shape which has an approximate 4.5' to 5' flat bottom per the - - -- — design and. 8'.to-9_ as -constructed. The average depth is 1.5' to 2' by design and I' to 2' as built. The side slopes are designed to be 3.5:1, the longitudinal slopes vary widely from approximately 1 % to 3% and averaging 2%. As -constructed the side slopes vary between 3:1 and 6:1 and are for the most part 4.5:1. The as -constructed longitudinal slopes vary from 1 % to 3% and average 1.9%. Despite the variances, this swale will function more or less per the design. Swale_#2 has a V-shape and discharges into Pond #3. The average depth is 2.5' to 3' by design and the same as -built. The side slopes are designed to be 4:1, the design of the longitudinal slopes vary widely from approximately -.04% to +1.5% and averages approximately 1%. As -constructed the side slopes are approximately 4:1, the longitudinal slope is 1.47%. A utility trench at the rear of the lots has disturbed the grading where the swale enters Pond #3 upstream of the trickle pan. This area needs to be remediated to provide a smooth transition of the swale to the end of the pan. Swale #3 has a V-shape. The average depth is approximately 2.5 feet by design and more or less the same as built. The side slopes are designed to be 4:1, the longitudinal slopes vary widely from approximately 2.5% to 5% and averaging 3%. As -constructed the side slopes vary from 4:1 to 10:1, the longitudinal slopes vary from approximately 1.5% to 7% and average 3.5%. The downstream end of the swale as it enters the westerly side of Storm Line 2 falls into the culverts at 3:1 in the last 6'. The swale has some silt accumulation in the lower approximately 175' prior to the final 6' before the culverts. The swale should be re- graded to provide a consistent longitudinal slope or the upstream end of the culverts should be armored with riprap. Otherwise the swale should function more or less per design. 6- Overall Site Drainage Certification Engineer's Report of Issues of Conformance Swale #4 has a V-shape. The average depth is 1.0' by design and as built. The side slopes vary and are designed to be 3.5:1 to 4:1, the longitudinal slopes vary widely from approximately 2.5% to 5% and averaging 3.5%. As -constructed the side slopes are 3.5:1 to 4.5:1, the longitudinal slopes vary from approximately 2% to 4.5% and average 3.0%. This swale conforms more or less to the design from its upper reaches to the area right before Storm Line 4 where it varies considerably from the design. At this point it opens to the bank of culverts further south than designed and had riprap installed on the southerly bank to deflect the drainage flows northeasterly toward the culverts. The swale running along the northerly edge of the riprap has been regraded and the riprap is no longer visible (buried?). There is also an unnamed Swale running along the southerly side of Block 2 as discussed --below-which intersects this area. As recommend, riprap was extended up the northwesterly slope of Swale 4 and is now in general conformance Swale #5 has a V-shape. The average depth varies from 1.5' to 3' by design and - - - approximately the same as built.. The side slopes vary and are designed to be 3.5:1 to 4:1, the !-longitudinal slopes vary widely from approximately 1% to 4% and averaging 2%. As - constructed the -side slopes vary widely between 2:1 to 6:1. The longitudinal slopes vary from approximately=2.0% to 6.6% and average 2.8%. Despite the variances, this swale will function more or less per the design. Swale #6 has a V-shape and discharge into Pond #2. The average depth is approximately 5' '_'by_design and:the.-same:as built. The side slopes are designed to be 4:1, the longitudinal slopes are designed at an average of a bit less than 3%. As -constructed the side slopes are also approximately 4:1-the longitudinal slopes vary from approximately 2% to 4.5% (one short section of 7.5% as shown on the Detail Sheet and average 3%. There is an unnamed swale parallel to the southerly side of the trail running along the southerly side of Block 2. It is not part of the design but is not detrimental to the design. There is an unnamed swale lying northerly of West Elizabeth north of the area into Bella Vita Drive which is part of the design grading. This swale actually lies on the adjoining property by design. The average depth is approximately 2' by design and the same as measured from the northerly side. The side slopes are designed to be 3.5:1, the longitudinal slopes vary widely from approximately 2.5% to 6% and averaging 4%. As -constructed the side slopes are also approximately 4:1 on the northerly side but the berm which supposed to be built between West Elizabeth and the southerly side of the swale is missing leaving very minimal side slopes on the south side of the swale. The longitudinal slopes vary from approximately 1.5% to 4.5% and average 3%. -7- Overall Site Drainage Certification Engineer's Report of Issues of Conformance Pipes The Storm Sewer pipes are shown on the Storm Sewer Utility As-Builts submitted to the Utility Engineering Department. The pipes are all correct for size and type. The slopes vary slightly from design in all cases generally with greater slopes except Storm Lines 7 & 9 which are lesser slopes. Storm Line 9 is little affected. Storm Line 7 has barely enough capacity as -built but enough is enough. The invert elevations are in substantial conformance with the design or relatively so where slightly higher or lower which affects the slopes as discussed above. Installation, Backfill, Cover, Encasement and Joint Types were not observed by Civil Arts. Concrete Pan Channels There is only one concrete pan in Detention Pond #3. It is the correct width, substantially correct longitudinal slope and generally correct cross-section. We did not observe its thickness. The pan is built at substantially the correct elevation. Inlets _ = -The inlets are all -the correct size except Inlets 4, 5 & 6. Inlets 4 & 5 are I inlet larger than design for each location. The size of Inlet 6 is not specified on the approved plan but is drawn as 1 FC inlet in the CAD and is constructed as 2 inlets. The types are all correct. The grates and = -their openings are built:per-the standard detail shown on Sheet 49 of 50. The grate and invert elevations are shown on the .Utility As-Builts submitted to the Utility Engineering Department - - and are all the -grates are at or slightly lower than design which is acceptable. The inverts are all in substantial conformance with the design (inverts in running slightly higher than design and inverts out slightly lower except Storm Line 2 which is slightly higher as a rule than design but the relative elevations are acceptable. The boxes appear to be Fort Collins Standard based on the information supplied in the plans. Street Cross -Pans Street Cross pans are built in general conformance with the design as shown on Detail Sheet 6. -8- Overall Site Drainage Certification Engineer's Report of Issues of Conformance Culverts There is one small culvert at the far south west end of the site which is the correct size and type. The invert elevations are exactly built to plan. Sub -drains Refer to the Utility As-builts for underdrain information. Curb Cuts The curb cuts and sidewalk culverts are built in substantial conformance with the details shown on Sheets 49 & 50 of 50 except as noted below. The concrete part of the structures are built in substantial conformance with the design as far as elevations go except that the back of the sidewalk culvert on West Elizabeth going into Pond #1 has an opening of only 7". -9- I> THE AS -BUILT INFORMATION SHOWN ON THIS RECORD I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN - DRAWING ACCURATELY PRESENTS DATA FROM FIELD HEREON WAS PREPARED BASED ON A FIELD SURVEY DONE - - - - PROPERTY LINE SURVEYS PERFORMED BY CIVIL ARTS, INC. ON 4/1*/14, UNDER MY RESPONSIBLE CHARGE. 1/16/15. 1/23/15, 1/26/15. 2/2//15. AND 7/24/2015. ST EXIST STORM LINE QD /i PROP STORM DRAIN LINE PROP BUILDING OUTLINE APRIL 11, 2015 APRIL 11, 2016 - - - - -:9 SUB -BASIN DELINEATION DIRECTION OF FLOW 4 DRAINAGE BASIN ID V R R„ SILT FENCE SF Y01 100-YEAR RUNOFF EX. SILT FENCE COEFFICIENT VEHICLE TRACKING VTC BASIN AREA (ACRES) CONTROL PAD INLET PROTECTION IP 3 DRAINAGE DESIGN POINT CURB SOCK CS STRAW WATTLE SW SUMMARY OF DEVELITPED RUNOFF DRAINAGE AREA. DESIGN P01W RUNOFF 2yNr, cN 100.year, cf. 1 0.93 1 42] 1,07 RI 1.>0 1 4.45 2 2 1.53 6.99 2.OJ.Od R2 4.15 IA.98 ] 3 128 5.03 .1,4 R3 2.75 B.9O 4 4 1.9T 9.1..1 5 5 0.82 3.59 S,W R5 2.69 8_29 6 6 2.53 11.10 7 1 2.92 13.41 7.9.10 RT 5,54 25.]9 8 A O,s9 Z65 1,3,4.8. 13 RA 3.36 22. 11 9 9 1.18 5AR 9.10 RB 2.54 tt 16 10 10 1.37 9.41 11 1' 0.48 214 2,11 W,0i,p5 R11 4.47 19.87 12 12 0.71 3.211 6,12 R12 2.92 13.54 13 13 1.18 5.2.1 1 .341304 R13 224 16.07 14. 1b 0.99 4.02 7.4.10, 1" HIT" 5.91 26,96 140 146 0.57 3.14 56.7.9,10.12,14a, 14b. 15, 19, 18. 19 R14D 11.64 53.91 15 15 120 5.11 15.16 R15 2.36 11.00 16 16 1.30 &OR 17 17 0.71 109 2.11,17.0.t,0�,0-0,d6 R17 5.28 22.73 i l,tl R17 Na rva 16 1a 0.74 ]24 19 19 0.83 3.M 20 20 1.10 4./1 21. 21. 0.30 1.]4 21b 21b 1.65 7.21 22 22 0,17 0.75 23 23 0.16 0.60 24 24 1A8 6.64 01,2223,2 ,28 R24 2.58 11.19 25 25 0.55 240 26 20 2.01 L78 21b,25 R26 N4 14.61 2% 27 0.46 217 25.27 R27 0.82 3.77 28 28 0.13 0.58 29 29 0.08 026 21a,210.2629 RM 3.55 16.12 01 01 1.05 4.62 02 02 I'M A.12 03 00 125 5.66 04(ppm0a 3) 0,1(,rdb 3) 125 5.80 OS(p9nne 2) 05(ODrWe 2) 0.67 2.42 OBIPOnbR 1I D6I00n4R 1) 0.00 lA4 07 07 1 3 0.12 30 30 1 0.25 120 11 31 1 0.23 1.10 Aroxbva0: 4a. e.ee..H Ox. CHECKED BY: w.0 u4h, o.r C.....It WNNNr.. D•N CHECKED BY: R:.n.su4Rr mH cNECKen nr..lmua,.. nx. CNICKE9.Y. F.b W exn.aen nx. 0 20' 40' 6O' Oxec�lener: ® e,.N.�,•.�W re..�. Nx. NOTES: CHUCKED BY: 1. ALL STORM INLETS ARE COMBO INLETS WRH Ox. 3362 NEENAH VANE GRATES. LarWFvyr AnM1IhOM. dripilw7HW, A Pfmxd.w 10.1 vsl W:nlnw . rx1 C41NA m eoex:' Am .e• 1w1 s: em w x•u CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800.922.1987 or 5348700 x.x. ro ' +e war O C0 01 z J J U Z O ^ O j 0 Q Z J W m O d d z f z x 0 7 CAROkcd HHF PaIR 12-07-07 RRviria74 PrgjBve / 2427 is OF 50 LOT 12` TF-5141.5 CIVIL ARTS, INC. AS-BUILTS 01/23/2015 07/24/2015 THE AS -BUILT INFORMATION SHOWN ON THIS RECORD DRAWING ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIVIL ARTS. INC. ON 4/14/14. 11/18/14, 1/1SA5. 1/23/1S, 1/26/15, 7/9/15, AND /EE O Y"'�"v! Af APRIL 11, 2016 I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED EASED ON A MELD SURVEY DONE UNDER MY RESPONSIBLE CHARGE APRIL 11. 2016 LEGEND CONSTRUCTION BARRIER FENCE DRAINAGE BASIN ID — — — — PROPERTY LINE n It A„ SILT FENCE SF ST EXIST STORM LINE YM YW 1D0-YEAR RUNOFF E%. SILT FENCE COEFFICIENT PROP STORM DRAIN LINE VEHICLE TRACKING BASIN AREA (ACRES) CONTROL PAD VTC PROP BUILDING OUTLINE D p, �, W. 63Z_11�.eu=-3>1WA SUB -BASIN DELINEATION INLET PROTECTION IP DRAINAGE DESIGN POINT SCALE _ 1. - 40. DIRECTION OF FLOW CURB SOCK CS NOTES: 1. ALL STORM INLETS ARE COMBO INLETS WITH PROP AREA INLET STRAW WATTLE SW 3362 NEENAH VANE GRATES. CRy of Fort Collins, Colorado UTILITY PLAN Approval AnNo.tiv: wee mN cnecaeo en ccNRorv: W.n.rN.VW .M ceecxeon: Ceececver: iNM e.w.. IryN CNeceevrv: IN,MwNnwNn MN cNeceen rv: .mreninnW MNn•r ..�. nMCSAv rv: �• 1mWevyr A..AHLvlvr, n4wnW. A vrmomlP ru rn w.. eWl n+.*M ro ter:' von. .v bn aia Yr SW CALL UTILITY NOWiCAMOV CENTER OF COLORADO 1-800A22-1987 or 504-8700 0 U Al 2 0 V ,O,ww W ° vJ > Q WV � Z � ZQ Q. Lu m Qo cc F Q 2 f 2 0 O CAD YYfs }.n E. dMA CUWW P.&Orrud ENS/scs CARCked ENS/SGS Dot. 12-07-07 Revision Project IF 2427 19 of 50 NOTES: 1. ALL STORM INLETS ARE COMBO INLETS WITH 3362 NEENAH VANE GRATES. LEGEND 4 DRAINAGE BASIN ID -- — PROPERTY LINE ST EXIST STORM LINE 100-YEAR RUNOFF COEFFICIENT PROP STORM DRAIN LINE AREA (ACRES) PROP BUILDING OUTLINE BASIN SUB -BASIN DELINEATION DRAINAGE DESIGN POINT DIRECTION OF FLOW PROP AREA INLET CONSTRUCTION BARRIER FENCE SILT FENCE $F EK. SILT FENCE (IN VEHICLE TRACKING VTG CONTROL PAD INLET PROTECTION IP CURB SOCK CS SCALE - 1' 40' STRAW WATTLE SW CIVIL ARTS, INC. AS-BUILTS 0 /26/2015 07/24/2015 ME AS -BUILT INFORMATION SHORN ON THIS RECORD DRAWING ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY COAL ARTS, INC ON 1/20/15 AND 7/24/15. aA�L�1 kt LPRIL 11. 2016 1 I HEREBY CERTIFY THAT ME AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED BASED ON A FIELD SURVEY DONE UNDER MY RESPONSIBLE f -A APRIL 11. 2016 FORT COLLINS -LOVELAND WATER DISTRICT SOLTFI FORT COLLINS SANITATION DISTRICT AU NTic1LAH D. DTWLo 1HIv2W Da: bL. Te F.14 PE., PSmcl P+pinm DR:e All Huaaa� MNs'aL EdcEau cJ voA:irsom n BxE. Rnxpp mv: Se yPP.M e vN.M IM iFo Cal�s�Lay.lIDd Faer Usme n! 0e SeM Fwl Co:lvx SmhWo O.,a:: PLEASANT VALLEY AND LAKE CANAL COMPANY AIHHoval Mcm* 0EYEVIED BY THE PLEAS ANT VALLEY AND LANE CANAL COMPANY ON THLS_DAY OF NI THIS PLAT HAS BEEN SIGNED BY THE PLEASANT VALLEY AND LANE CANAL CC DPANY BUT THL9lHALL NOT MEAN R APPROVES TIE ENGINEERING, SURVEYING, DESIGN. CONSTRUCTION, OR OTHER PROFESSIONAL WORK THE MNATURES NEAN ONLY THAT THE COMPANY HAS SEEN THE SHEETS. MENED. AND COOPERATEO WITH ME OWNER M PROVMNO INFORMAT*DK THE OWNER AND THE PROFESSIONALS IT HAS EMPLOYED ME SOLELY RESPONSIBLE FOR THE END RESULT, City of Fad CioNM, Colorado UTILITY PLAN Approval AW'UWPD: cxccNEo er: Ww. LSF w�. CMCREO YY: wul..w,PMr Pm CHECKED BY: A...... LlN Pm cxecREort: inW.Eyw nn. CHECHES.: Peb otl LenW. nr. cxECNEort: cxc GA...: oa. k 0 CALL UnITY NOTIFICATION CENTER DE MORAN 1-8 00-922.1987 or SM4700 .Pe 4w1 MP.RP.—A O U N 2 J O U 2 bi W O W Q W cr LLJ 2 r^ O Z 'O v O Q Q Z Z_ Q n ORajpnad ENS/SGS CAmkad EMS/SGS Palo 12-07-07 REN1a1Dn ProjacE / 2427 20 OF 50 I I SEE SLPIIY It WlL .LS-BUILLS FOR % WLKRT9 Y IN i3 yYYJ �� �i�� � • I / IRN RJ to t Ymn i .uaG 1}'A R .7 A .. I I I I n R _�1YY _ n -- _ IY� R - - - _ _ % tt awn .7 - -M .�oae uv _ - - - _ %� rry Jay _ - - wrl Mo rw Rs.i SWALE 4 . _ _ _ _ _ _ - o- R� aA __ - _ I RORS R SEE ALSO SHEETS 18 & 19 OF 50 AS -BUILT CIVIL ARTS, INC. LFGEND RECORD DRAWING s µE SVOT1gLEvtiI0.R CIS'WIYLS 01/26/2015 I ELEVAigN3 07/24/2015 I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED BASED ON A FIELD SURVEY DONE UNDER MY RESPONSIBLE NIAP(Y - IAPRIL 11, 2016,�:-' THE AS -BUILT INFORMATION SHOWN ON THIS RECORD DRAWING ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIVIL ARTS. INC. ON 11/16/2014. 1/16/2014. 1/23/2014. AND 7/24/2015. #w SCAI F I'-ff APRIL 11. 2016 SHEET - DETAIL 1 y.aw i - _ _-_ _ -._._ _.. �4LE BELLA VIRA AS -BOIL TS SHEET DETAIL-2 EA .a. TF-5132.1 A o w.A wAn Eldl wYE lIR� �W lw s s r� waw wren -. b And, b - -- -TAKI SWALE 5 I 1 1 1 f 1 SEE S10RN SEKR 1 I - 1 IIn I CUL VRrs a INLETS \ a \ f w.ma I / w yec mntl �:N N j b w• m w ns w.mu 'i> mw - wr wm rr _ a � 1 SE. nl •A �1V-MJ M[�Y16. b 1 v waa wstlien�L \ Rbn nw � ______ NEED r0 �� Ep1END 1 I II I SEE ALSO SHEET 19 OF 50 AS -BUILT 7A, _ _SWQtw---4",f[ntlM �� em wiT CIVIL ARTS, INC. LE RECORD DRAWING sF CONMURS - PLAN COOMRS 11 /2 0/2 014 SPOr ELEVA➢DNS - AS-DWLT ELEVATONS 07/24/2015 1 HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOMN HEREON WAS PREPARED BASED ON A FIELD SURVEY DONE UNDER MY RESPONSIBLE �AR/rs// " �APRIL 11, 2016 THE AS -BUILT INFORMATION SHOWN ON THIS RECORD DRAWING ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIVIL ARTS, INC. ON 10/24/14. 11/18/14. 1/23/15. 777/�9/15, AND77//J244�/iS SCAI F: 1"-10' APRIL 11, 201.5 BELLA VIRA AS-BU/L TS SHEET — DETAIL J pR TAT 5 w TF=5129.59 G % Aua esi / •PO O vl. � YnAA RRR wr. YAK O LOCK 7 / � 1 Y Y .nsn y yx • � � 1M1rM A� A. Y1fY �q � Yw s � 0.yF11Y I DID Mtl fAAAA u LiY�IfYY ��11 Iu •� A. A. Aw rnn RR -11YTS FW R w TS .e 'Ok AS WLl 0 Ym �i.Y 1p =a Y .. _ P. �{ YP * iF 9 _ fi(Yfi- p R- _ MV •p.Y j�Y to AY Ap _ _ _ _ _ _ _ io -M i (YiR. - _ _ _ _ _ Ilk „l - - --$R a 'LYE n L.waaOa n Jr. _a SEE 200 "N - SCALE: 1"=10' A a AA LEGEND WPRAP Um SALE LONTWRS • KAN CONTWRS SPOT ELEVAMNS . AS-& l EIf VAMONS CIVIL ARTS, INC. AS—BUILTS 02/02/2015 07/24/2015 1 HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED BASED ON A FIELD SURVEY DONE UNDER MY RESPONSSLE r &Rt APRIL 11, 2016' THE AS -BUILT INFORMATION SHOWN ON THIS RECORD ORA'MNO ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIAL ARTS. INC. ON 1/IB/15. 1/23/15. 2/2/15. 7/9/15, AND 7/24/15. j-Ty-- alt APRIL 11, 2016 BELLA VIRA AS -BOIL TS �J ` YA`°'a'P rmen_nY Lrgrot ,ro Fnl SIIRveNb 01VILARTS APR0. 2% NHS ETH t03f-0 t'�t0' xmR R. Pp$ Ilu IO3�tW-O_.5-dTL SHEET 1}20 EEi 1-5 SHEET eL.ae - o.Rm: AlVYCMF - o.zm IzwY�- e.tEn< DETAIL-3 SHEET - DETAIL 4 IPA s N FaYJ �d7b1�i k=� TP Ylll mnA� �F�4�/ 1n IT B \ \ 51292 A \ SEE ALSO SHEET 20 OF 50 AS -BUILT BLEND PWPMMa SW4E Cp TIX - PIAN CWTOIJP$ S 07 REVATONS - AS-8U 1 RCv�T0N5 CIVIL ARTS, INC. RECORD DRAWING 01/26/2015 07/24/2015 SCALE- 1'-20' I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED BASED ON A FIELD SURN£Y DONE UNDER MY RESPONSIBLE ^" APRIL 11, 2018 THE AS -BUILT INFORMATION SHOWN ON THIS RECORD DRAWING ACCURATELY PRESENTS DATA FROM FIELD SURFEYS PENFCRMED BY CIAL ARTS. INC. ON 8/6/14. 1/15/15, 1/10/15. 1/20/15. 7/9/15, AND 7/24/15. APRIL 11, 2016 BELLA VIRA AS -BOIL TS dxo pitiT - fIT11l. f a wnp SEE ALSO SHEET 19 OF 50 AS -BUILT KEY MAP SCAT F. , -. 00 I FGFND RWR Rum xwALf CON,WRS .PLAN WNTOURS v T ELEwLnoNx . Ax T EEEVA>Nlxe CIVIL ARTS, INC. RECORD DRAWING 01/26/2015 07/24/2015 rtly I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED BASED ON A FIELD SURVEY DONE ' "" UNDER MY RESPONSIBLE CHARGE II APRIL 11. 2016 THE AS -BUILT INFORMATION SHOWN ON THIS RECORD DRAMING ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIVIL ARTS, INC. ON 4/14/14, 11/18/14. 1/16/15. 1/23/15, 2tt//21/15, AND 7/24/15. '&A, _ APRIL 11. 2018 BELLA VIRA AS -BOIL TS ��ii���//// q�NG f]aNL1,4 LYpbl Gfl>M'1 $MYF114 CIVILARTS RAs vuN En n N. a a 4 SHEET - DETAIL 6 OF- II r TLOj I� h 1 I ( A I LOT 5 j 40 _S150 INTERSECTION DETAIL OF PRATOLINA COURT, SUNFLOWER DR. AND WEST ELIZABETH ST. F R„a - ���� •. � - Arne LOT TF.512 w� A LOT B TF.5131.2 A (' INTERSECTION DETAIL OF BANYAN DR. AND WEST ELIZABETH ST. Flplt'E ... W.. �f ' _ � T 1 _ 1 I 1 m 1 LA 1 TF. 1 W 1 1 1 1 FTTF-5132611 INTERSECTION DETAIL OF FIORE COURT AND BANYAN DRIVE CIVIL ARTS, INC. AS-BUILTS 01/26/2015 THE AS -BUILT INFORMATION SHOWN ON THIS RECORD DRATANC ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIVIL ARTS, INC. ON 1/26/15 *ijqmet APRIL 11, 2016 I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED BASED ON A FIELD SURVEY DONE UNDER MY RESPONSIBLE CHARGE. APRIL 11. 2016 KEY MAP ➢CALF: 1'.A00' RIPRAP S.'a CONi n - PLAN C IOUR5 SPoT UX.MONS - AS -BUILT n(VA1gNS SCALE, 1".2U' BELLA VIRA AS -BOIL TS SHEET — DETAIL 7 .k. 5124.51 POND WEIR N°R¢°NTAALL �WAE: I -.IV VERTCAL KkE: I--,' Ia6 Y 5124.02 . 512A.01 LGM POUR, -s123 e. �]l�'i LL• LLl 5130 5125 5120 5113 5130 5125 5120 5115 " 0+75 at —. 2.W Acp S . ... ........ .... T POND 11 SEE ALW Pd 01 SKET �TAy_. +r R4 � �rn W&k.512440 \ Ab pyp N POND it MAP S E, I'.3T HORIZONTAL SCALE: 1'=1' VERTICAL SCALE: 1"=O' 5130 5125 5120 5115 0+75 1+00 1+25 1+50 1+75 2400 2+25 2+50 2+75 3+00 3+25 3+50 POND ii CROSq S TION ST- A T I+W 1+ZD 1+W HORIZONTAL SCALE'.1--l' VERTICAL SCALF1'=O' SIM 5125 5120 1+75 2+00 2+25 2450 5n5 2+75 3+00 3+25 3+50 }+]5 POND III CROSS SECTION NORTHWEST -SOUTHEAST CIVIL ARTS, INC. AS-BUILTS 01/26/2015 07/24/2015 THE AS -BUILT INFORMATION SHOWN ON THIS RECORD DRAMNO ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIVIL ARTS, INC. ON 8/6/14, 1/26/15, AND 7/24/1& ' aa# APRIL It. 2D16 I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOPM HEREON WAS PREPARED BASED ON A FIELD SURVEY DONE UNDER MY RESPCNSiBLE CHHJARRRAGE.�/�/, APRIL 11, 2016 LEGEND 0.VRA0 SwLLE CONTOURS . 0.AN CON1gIR5 SPOT ELEVAMg . A5-BUIL7 EMVATGNS POND #1 CROSS -SECTIONS BELLA VIRA AS-BUILTS ErvMEERFG :: PI[]ALt1]1 :: 15W IVee A.nia 9J0 t-E xANNNG V.V ` rx]Acnu 1>v�wE ulex:l 5]n.n NG CIVILARTS APRIL 20. 2WS E1N o 1031-0 feVc 0 " W 1-.10' Pp5 IPII-O_/5-RULI °°"° "BLS oET T_a SHEET ]E✓OrW - o.amI RwoeE - .,t . Acwwa - E.xn< DETAIL-7 SHEET — DETAIL 8 SCALE HORIZONTAL SCµ(: 1•�10' POND 2 WEIR 1,_.?L SCALE: j I. W2+13 - - 51 N.OS J33 Sf 51216E 511522 LOw PpHT MY E�F 5130 5125 5120 5115 0+75 5130 5125 5120 HORIZONTAL SCALE: 1'-1' VERTICAL SCALE: Y=U 5130 5125 5120 1+DO 1+25 1+50 1+75 2+0D POND 02 CROSS SECTION WEST -EAST 5115 6- 0+75 2+25 HORIZONTAL SCALE:1'=1' VERTICAL SCALE :1'-D' 5130 5125 WE 5120 1+00 1+25 1+50 1+75 POND 47 CR055 SECTION NORTH -SOUTH 5115 2+00 J 5115 2a50 SHFF.T DF.TA11,3 CIVIL ARTS, INC. AS-BUILTS 01 /26/2015 07/24/2015 THE AS -BUILT INFORMATION SHOVIN ON THIS RECORD DRAMNO ACCURATELY PRESENTS DATA FROM HELD SURVEYS PERFORMED BY C1NL ARTS INC ON 6/6/14, 1/26/15, AND 7/24/44S J,/L XN�OA�I��'�I APRIL 11. 2015 I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED BASED ON A HEIR SURVEY DONE UNDER MY RESPONSIBLE C-HAR/G/GE/J/�/ POND 42 MAP CANE: r.3o :. APRIL 11, 2016 . LEGEND RRRAP SWAU — C TWRS . PLAN Cell➢IAS W01 DSVAMONS . A!II ELEVA1 S KEY MAP kTS POND #2 CROSS -SECTIONS BELLA VIRA AS -BOIL TS 4 5145 5140 5135 SCALE HORIZONTAL xALG 1'-IO' ARXAL xN[: 1'.1' POND 3 WEIR WkL 513R..b wAU-!t]6!t zU 4 SE LOw PgNi : 3377z wLLF 4 HORIZONTAL SCALE: 1'=1' VERTICAL SCALE:1'.O' 5145 5140 5135 5130 5125 5145 5140 5135 5130 5125 0475 1+00 1425 1.50 1475 2.00 2+25 2+50 2+75 PV - 11 POND /3 CROSS SECTIONWEST-EAST HORIZONTAL SCALE:1'=1' VERTICAL SCALE: 1'=V wSEL-5, .0] . ,CD-YR LOLN2 SHEET - DETAIL 9 CIVIL ARTS, INC. AS-BUILTS 01/26/2015 07/24/2015 THE AS -BUILT INFORMATION SHOWN ON THIS RECORD DRAWNG ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIVIL ARTS. INC. ON B/6/14, 1/26/1% AND 7/24/15. A: APRIL 11, 2015 1 HEREBY CERTIFY THAT ME AS -BUILT INFORMATION SHO" HEREON WAS PREPARED BASED ON A FIELD SURVEY DCNF UNDER MY RESPONSIBLE WAROE. f APRIL 11. 2016 LFUND ®N R"R POND A3 MAP SWAIE 5(JEE; �'-OC CdRWRS . PIIM CpIT0UR5 SPOT ELEVATORS . A"MT ELEVA1 5145 POND #3 CROSS- SECTIONS 5140 BELLA VIRA AS -BOIL TS 5135 ? /N 5150 5130 0+75 1400 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+75 4+DO 4425 POND 43 CROSS SECTION NORTH -SOUTH I l SM ` E 2' . Y -' L111 I I Oi00 5 \V A LOT 4 LOT 5 LOT 6 vv LOT 2 LOT\\3 \ OT 7 \ \ , 1 \ LOT 8 J 1 , 1 ,.! / \\ T 13 OT 12 1 5 LOT B T 11 LOT 1 \I 1 LT 14 1 aRACT B 1 �— I °trot \ J S. WIDE \ LOT 1 ARICNLE Cl-4 EL \\ ( STM LIN T 6 J I 1 , I L 1 1 O.oO I '45 0+ 1 s° - J ] 17l!'RO Xr (!YplLIN9.. ] ma E59 TRAOr F T --- LOT a 11 LOT 5 LOT 4 LOT 3 SLOT 1 JL! TM LINE 5. L.4 JLY _ -__--TRAL'Z,$ \ - 4 1 nnm �inw AY a �x \ "I �' t1£M4W.4YY I ot';I I//N)1'..- I I I Itl L111 LN11111'IIAI IIII 4a IIu111 11 '1111 As Bull II::IUI(NIAIluN s 111ltc> CIVIL ARTS INC. 1111 PAI PF�;ASI PON III'ItP6h:11\'l l'IIIINT A, 11RATI'I1II IZIIINIaIIAIAI IUIPI III1V Iri I:ISI'I NI R111.I1I11' I' 1\111 J.S"0D x, R i4jgA Aril INCIINIII', IIIIIII 4.�41I'IA\II Mti RECORD DRAWING `g# nl 9II IL239 2 s�$RIL1J.lUrA�N�$ 4 21-2015 g✓�p,'�.. ^NMni�I, n�„O ��Mn9NALnM,o^ SEE REVISED VERSION SEE REVISED VERSION ❑--� s,4o7, SHUT 39A SHF.F.T 3913 ,,�I$TORM LINE 2 . STORM LINE 4 STORM LINE 5 I 4f N 1f/C PoNgf AT OPd:P/AN9 7xu[ u9 NI ]RT11 STORM LINE 6 LOTIS LINE LOT 4 6 LOT h 11. LOT 3. II / ♦� LOT 3 LOT 2., LOT 1 rxr rzr 1 l_ 75 1+0D 1.25 m • 4 Y I mY mY K wm 1a '2 IA I Im 1. NOTE SEE OETAIL SHEETS FOR ADDITIONAL INFORMATION ON OUTLET CONTROL STRUCTURES. Y. ALL CONSTRUCTION ACTMTIES NEAR THE FORT COLLINS-LOVEUND WATER DISTRICT'S WATERLINE OR WITHIN THE ASSOCIATED EASEMENT SHALL BE COORDINATED WITH THE DISTRICT PRIOR TO COMMENCING. 3. ALL STORM SEWERS TO BE INSPECTED BY THE COY 4, AN ENGINEER APPROVED EQUAL PIPE MAY BE SUBSTITUTED FOR ANY RCP PIPE NOT UNDER TRAFFIC LOADING. 5. ALL RCP TO BE CLASS III (3) Q .------------ - _rra rr,�•r nu Paw AT onyao 1W "D STORM LINE 7 0 25' 50' 100, HORI® 0 2.5' 5' 10' VER® 5108IS ., 5140 74 - [xlsrl c cwn-E PROPoSED Exl NL GRADE MI571 cR ➢E PRO CSEO CPIDE 5145 a _ I GRADE 5145 5130 5130 5145 5145 5130 5130 N - HW.° aR L I (])t5- RCP 1 "MIN ~ Hw= Dz 40 PROPOSED 5140 5140 5125 5125 5140 CxI Nc CUDE 5140 5125 EwS'I c cRAOE 5125 Hw-JG MIN. �I� i G cRAOC J F. $n \� RCP . R' (ItNGIN 2= _ \ -+ LRME ' 5135 a"MIN 1, ss Lr. (Ps' 5135 5135 5120 r Ncw 5120 5135 5135 5120 — 5120 d LL ' R ^ C •,, nw=le.ez x. Qn 8 Nuj~i� IHCWOES g a . . 5130 FE �. �1 1. 5130 N 5130 5115 5115 5130 � `2B a 5130 5115 '0° �' 5115 rnZ i• Jib •[ '�` 7}LT RCP . c_as 5125 5125 5 5110 ~3P e' S110 S `" 5 110 iIEN w INCLuo s 5110 1 R N 'm 8 G� INV•510 17 5120 5120 1 5120 5105 5105 5120 5120 1 5105 5105 3"" W•u= o� 1 5115 5115 5100"g 5100 1 5115 1 5115 5100 5100 U+UU U+SU 1+00 U+UU U+SU 1+UU U+UU U+SU 1+UU 1+50 U+UU U+50 1+00 0+00 0+50 1+00 0 25' 50' 100, SCALE ® City of FOR Collim, Colorado UTILITY PLAN Approval YADYLD: Dr4rY— Px- o.aao ar: rr�aw.wrwv R.. .... an. cxecuo er: Tmxr,WW.. R.W cxacuo er. r.Ir.•II....I.n oW cxecra• or: •xII.Ix.•I.I.I� a.. cxecxeo ar. w f. AI I. UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 Or 5344700 O U f0 Z J O U z O LL W 5 �a Q /off 0 M Y! Q W a tl.ect PP CAwcked JFS .pate 12-07-07 Revivion fl'ojec! f 2427 39 OF 50 18.35 RETAINING WALL. EG-PT 47.6g (STRUCTURAL DESIGN _ EOCI BY OTHERS) T LINE A". AYne \ ! )l WIR LINE WNT-WR I (SEE REVISED ' I WIN PROFILE) nl 1 I IY _-1 ---I I �_ _ PROPERTY LINE 5150 5145 Sim 5110 1-q) 1 I I e I ) ) I RE -ALIGN CONCRETE --__ ACCOMPEDESODIAN TRAINEN TO $ o FFLL I 1 STORM NEW n 2 45.95 1 46.39 4022 I _ STOR4 PIPE LOCATION t- •jy'a I•• it 1/LOT-CDR L - 2 LOT -COLT I Ek- 4057 46,35 / 42.58 \ • F EG-ME"-- / a2_58 40.69 ~ C EG-PC • \ 1 EOC-POD O . qt_-4 n �l Oi UN 47.70_ - WALL -TOP I O'INRL ' EOC-PC 41.43 - 1 4A88 � r2+Op 46.23 Aty 'S(74LL_TBWALL-iOP` 2t15'EOC-ME - - C•.,, ..R nn't'r—EOC'ME �2+50 °+9�1vu11a1n 40.33 \) IT1' �2+75 S. �EOC-ME" aas�T40.66 _- muma.¢.. 42.80 --5140 WALL WALL -TOP - _ WALL -TOP__ 1~ r $ 42.29 �``!`'� -51 .2 40,40 WALL -TOE_ 41.58 WALL -TOE', , � EG-PC RETAINING WALL 40.60 (STRUCTURAL DESIGN -- 155 LF. (3)15- RCP O 0.50E WALL -TOE BY OTHERS) ---_ (LENGTH INCLUDES FES) 16' THICK TYPE L RIPRRAP W/ 4- TYPE I BEDDING & 4' BEDDINGTYPE 11 TN OF PROTECTION - 106 _-WIDTH OFPRO PROTECTION BEYOND EDGES OF FLARED END SECTION ASSUMED GRADE AT CENERUNE OF STORM PIPE IS' FES 4199 Z STA:1 IS m ELEV.5444:66 i1 15' FES 156.15 LF - STA: 2+99.60 ELEV:5T4f49- - (3)15' RCP O 85BIF 0 4J"A (LENGTH INCLUDE$ FES) o'y N 16' THICK TYPE L RIPRRAP W/ 4- TYPE I BEDDING & 4- TYPE II BEDDING. LENGTH OF PROTECTION 10' WIDTH OF PROTECTION - 2' BEYOND EDGES OF FLARED n i++ n END SECTION d_ Qa x rc Of w a i 195 1.10 1.75 2-0 2+25 2+SO 2+75 31W STM-4 RORVANTAL SCALE: 1-27 VERTICAL SCALE: V-Z CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 OR Bill CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOUR DIG, GRADE, OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTRIDES. OWMIS ASSAIES W RESNWSBUTY Fan EASMO UTUTY LUCAT10vS. THE UTUTIES SHOM M TWS MARKS HAVE RON PLOTTUI FRaN THE MST AVAn WMATIM. It 1% H04ETER. THE KV0NS9UtY a 1ME CONTMCR TO FIELD WRIFY TIE LOCATCh Q ALL UTILITIES %Fdt TO THE STMT W µY CCMSIBUCTKN A VT BENCHMARK CITY M FORT oXLNS B AFIK 22-07 Fa1M0 2' ALUIYMN CAP M MI BAY 1EAR M HEST ROM OF OVBEAM TRNL NEST ELIZABETN ST, DEVATMN-StX59 NOYO 12n WADAISWO DTY M FIAT MMS YNCHLIMK M-92 ELEVATXIN.511E.25 N 19n WMMSTEO rrKEY MAP CIVIL ARTS, INC. 515a RECORD DRAWING 11-20-2014 IHHU.1.Y t.1 LiII1 Ili.AI Ilil b ODIIJ i;l n!. Y.A1U�] m Tl�nl uL�lcN1 11rAItI R lul�,::vnin,ci�cn n ..i 1 1 W.iIB I II H<l 5145 � x 4Pd a a Feed ggU_` 25579 `-d'IgNUARY 20, fUII-%, 40y'M,x,•,�u�� III \I L11J I N I I \ I \ i I I TN-11 r1, 1, Llt\t\ N-111111<1 III {NI I NI+it'. 510 5i I I A I< I I IIINI I II11( I \ I I A 1�.' 1 I INI I ,NNO III II III P IA 11 2"11 s'pysa F'`""• 12 91 JLUARY 201. {®�1 3130 3+50 N60 CITY OF FDRT COLLNS, COLORADO UTRI7, PLAN APPROVAL e=PRovEo [nv-E91.9REFR-- W.i� CHOKED By �RILT� qiE— aECAFo er .cI` 0 w. Trt6RCERCISEDF P1!— CMCKM B FJ� CHECKM BY FRNSOL9ERYC�p0.AF1� CAIE�— o CKM B DATE: u:d+auu DRAWN BY: TPp4N9N C10:'IXFD BY: aTw *8 NO. av SIBET NO: 39A OF 5120 mm ASSUMED GRADE AT CENTERLINE OF STORM PIPE 15' FES 512616 STA:1+51.16 n ELEV ` 7618 LF 15' FES 5724' -3 L_F (7)15• RCP 110% STA2+S5.OB ELEV. (LENGTH INCLUDES F�c2W ES) 101 Z YT1j1 16' THICK TYPE L RIPRRAP B W/ A' TYPE I BEOOIHG k 4- TYPE N BEDDING. LENGTH OF PROTECTION = 1D WIDTH OF PROTECTION 2' BEYOND EDGES OF FLARED n»p END SECTION k+ If Qo zG� M,dh m� z X o x Silo 1 00 1125 I'D 1-75 2+00 2+25 2+50 STM-S f1URRTICALLCAA : I-T VERTICAL BCALE: 1'-Z' gm Sim CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 OR 811 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOUR DIG, GRADE. OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. OMORM ASIAAS NO RESDIX19Bum FOR EXSs NG UTILITY LOCATIONS THE UnUMS SNOWY ON Tws DRAWNG HAYS BEEN MOVED F THE BEST AYAUBLE INFORMAIION. IT 1% HOWEVER THE RESPOH9BRITY W M CONIMACTOR TO HELD Wit" 1HE LMATW CF ALL U1RIM5 PRIOR TO IHE START OF ANY CONSTRUCBON ACIIVTf BENCHMARK OTY OF FORT C NS BENCHMARK 22-97 FOISNO r ALUWNUM CAP ON M BASE NEAR ENE WEST NOW OF OWR ANO MAIL WEST EUZABETH S1. EIEVAIDN.5158.99 NOW 1229 UNAOAM O OTT OF Fat MLINS BENGnNM M-22 EIEVAINNI-511B.25 NOVO 1929 UNADAISTED iai/. TKEY MAP CIVIL ARTS, INC. RECORD DRAY 1"*T�' 11-20-2014 I III A�BL111I IN OWS1 A II ON11111\\ N ON I I III RI L I IRI) I1NAWINI, q AC1 UNn It 111RIN N I. FIAT A I NI IM yN 11 R\F 111'! P1 I lP A 1p OBt. J 1'I\II RI`IN1 11\IN 11)91 R2+11 .: 5121 `CIS `A I[ J1 ANTIAKY 20, y ALE wN� HBB1 5110 2,75 243 25519 SE = g: "�RUn9r zrt.bNl� '¢�DAAI,MtYNWp SeRY CITY OF FOOT COLLNS, COLORAOC UTILPY PLAN APPROVAL AFPRovEo z rmtr .M. BY A9-EcsT�TTwATErranm� DTI CHECKFO BY BALE: .111V,00 DRAWNBY: wd Gfi.CKED HI. CHECKED BY: OTw 1R6RC"EAUCFD� BRT- KIBNO WIN cN ED BY. : palls-s-RFOa3Tpq q� CIIECK. BY [;Ef7mo 39B c EcKED BY OF LO'lW1[a 9AR lnvbNlY mawm slimaAunsraPl iV wGNGW` STM LINE 1 9TM LINE -]� I 'v oN 1 N' SIDEWAIJf J I a 5 Pf1A$EZ g I x I1 !1 rc / e'T/ r 0.000+2s ;r \� MULTIFAMILY DEVE\PMENT u R)IJ],u R� V h - Jo 0+50 0♦ ?5 . N �' \ M SSONa C a,. '11R0LT I Or ING A STM LINE B ����)�� 1 1 mm I I NA N � _ I � � Inl l;l ln'I INlln IIIAI IIn n ItII .'INI xtl.Aunp Nnl IN, N IU ItI nN K AA 1'lll VAN 1111 ty 11 AI'Ll 11 til xA'I'p U11.N1 [INrn4NI5 \`\ \\\\ /,xry�, = .II.1II.\I. I. N i A TRACT D N I �/e 9N 1 uro i¢IGIWG®o°Pua I I I B,,• 76379 S EXTEND EXISTING Box CULVERT �� €4 p I TroMImCIMPROVEMENTS Mooi -R OR STRUCTURAL A r 1, i O!HIL V. 4'y, (�P a Vim:° / / \ 5iM /.'m.� `O DESIGN SEE SHEETS SI-SA THIS SET / I "Tyy11 IAMa % \ 1 LINE - v .or mr a N YM BW 1 1 N I I j�jjF 1E"y wmw I \ 1. SEE OCTAL SHEETS FOR ADDITIONAL INFORMATION ON 1 I I PROPOSED CURB '.I /x OUTLET CONTROL STRUCTURES B' AND GUTTER SO 2. ALL CONSTRUCTION ACTIVITIES NEAR THE FORT T 1 I\\ o C // NN \ \ SI ALK 1 COWNS LOVEIAND WATER DISTRICT'S WATERLINE OR WITHIN THE ASSOCIATED EASEMENT SHALL BE COORDINATED WITH THE DISTRICT PRIOR TO COMMENCING. all"'\11 �- N u t I 1'1 \ 3. ALL STORM SEWERS TD BE INSPECTED BY THE CITY IT LOT I �. Lrr 1 v I 4. SU ENGINEER ORANYAPPROVED EQUAL PIPE MAY BE ER 1 EXISTING 11 SUBSTITUTED FOR ANY RCP PIPE NOT UNDER TRAFFIC HEAOW 5. ALL RCP TO BE CLASS IS (3) III / •-' II II ti III I11I TRACT C — / �e�' l ��\ `LO � 1 I en euNxM. DEtDIDOx PDxB e,IM'a•''u oM� \ I I / CIVIL ARTS, INC. 1 ° 5 E - V RECORD DRAWING. 23' S0' 100, COLLINS - ER DISTRICT 0 25' 50' 100' SCALE - f = t0' ® SOVFH FORT COLLINS ® HOR1Z - I- - 50' SCALE - 1- : 50' 4-21 -2015 SANITATION DISTRICT 0 2.3' S' 10' ® W. MiclYel D. DITWIiP. MenSVer Date VERT - 1' • 5' Mr. Teal FeaBl. F.E. Diann a'. Dale STORM LINE 1 STORM LINE 3 STORM LINE 8 STORM LINE 9 STORM LINE 10 RCBC EXTENSION AS exuE• tAlewtia..l exi um uJ _ tea.' � .al � �,o.�. i �G?L_ 1 0+00 0+50 1+00 1+50 I _ I I � I I I EXISTING ENCASED / ELECTRIC/FIBER OPTIC / 10' JEIWGPMY B..QrwA,l BxuE.v/ — J mvJifiNAN'v lAsaew/ %YrsYIM'v.Ln \ -BY SYAAAAAOIXFNFW) it \ _ AY(Zv/xW An� as \ EXISTING .L 4 z — ----- a>E, OeRlep I III I. IA I I I , INI OI[NI N I ION A I IKi 1111 1111\ VIIIII x 11l> DIIA W INL, -- � I � > A.11'1lAll 11 llll SllKl'S IIAIA IROM FIP:IPNUHt L1'S I'1711'VIt411'.N B1' _—_--� fall i ICI <:IVII AKIN INI nN nI"I-NILI'36i NOVl MITI iL lx 21.21114,ANI1 'e mou'i5 OPOSCD I L1 W G 5125 1 1 [%H \ RO SFO GRADE F%I uG GRI➢E � wmffmqmwu�� 4 LaeWee�. 8e,euerinp, E PLe l `1� .1 wn nloA- Ge.. W .11 .1. W laxt MR RM] CALL UTILITY NOTIFICATION CENTER OF COLORADO 1d00A22 1007 of SS44700 n�l°u%uv Oe° O U as 2 J J O U C IL J IL U. �a all Qj M v! Q W 2 a "g $�� PLEASANT VALLEY AND 5130 5130 5130 LAKE CANAL COMPANY a Approval Block = fy INC ow $•j ~ RanTHISEDBYTHEPLEMANTVALLEYANOLANEGWLLCOWMYON GC NOVOSED G E \ eOMFABEEN BY - _ THSIGNED E ptisal VALLEY ANO imi cMYTHINaN BIR TNIll65 NM YEAN O AWROVEE THE = 5125 '�� 125 -t].B 9NCw 01F. ENGINEERING, OVRVEYWD, DESIGN, CONMLICTON, OR OTHER PROFESSIONAL E WORK THE SIGNATURES M CAN ONLYTIAT TIE COMPANY HAS SEEN INS SHEETS, SIGNED, AND Q PS COOTEO WITH THE OWNER IN PROVIDING INFORNal THE �e>oee the Eleeete [upa—'lon 10 HGL PROPS 0 GRACE OWNER ANO THE PROFESN.. IT HAS Mall ARE SOLELY F R \� I o RESPONSIBLE FOR THE END RESULT.Ta 5120 5120 AEG 5120 \` / /,,,SSS \ J ROBERTUNMMIL4PRENOENT t5' ADS W 51 a 361% N 8 1 5 m S • .00R -I City o/ Fart Collins, Colorado .. ( NCTH i UTILl PLAN Approval HC UOES 0 227.1APPRovEo: FES) CAD file 5110 ~11 5110 5110 2427 NO Sne PP CURRENT START WA: l 1`. 11 cxBCNm n: Designed in END STR'. I 15 CONIC Y—ii . mama al EISTIN jt 'Ytfi'RGBG CxenaoaY: CAecked JF5 \ I \ " STI. 0 Al S]'.Oe INv-5t 11.]B w.n.welxwr pr Dal[ 12-07-07 5105 5105 '! 5105 clRCIao BY: �1 • I t III W ELECTR E1RER OPTIC vast E.NA� ax. RavTsiorG -! OF ,89 cxlclaoaY: RTafecf j 2A2] TSTAOP TOP Dr .WPRO%. fNCASE1uF.NT 5110.21 P—wRerMu eel. CNEFJND aY: 5100 1 5100 40 l 0+50 0+00 0+50 1+00 1+50 2+00 0+50 1+00 1+50 eDxE°. DeY OF 50 a ns \ ` �xNY.0 D1o1 \ n IYNJ r r o e \\\ �m/.w elYnNe /nlnn InpY �np tlMR \ 1rYTp]'OnC A OIL J `M N . D I w "runwo' I I --- en N YRO. se 1d An'i NO SBeStlB5G6 PLDw ccena .?. SECTIONAA SECTION B-B o mao to m�"...1•I® .IR. N.fP'.".'E"°'. Ir r u 1r D SECTION D-0 "Dr .onoPx .NNrtP Yrrtn AYw..e«u. SECTION C-C DETENTION POND #1 - OUTLET STRUCTURE DETAILS \ 1' 4' 3,-6- \ 3 6 q'W1NNpA\ 10 er : t A B r A ................`'_ ,��E 2•• E EEEm. l 5' 4 TeAl. . FLsef Aa,A Ts SECTION A+1 SECTION BLB 10 OC9LWfgN WOCV PJIU POND Mellll.l MI PA NI 000 u.w•ew "o. a // 11 - 1:Np1r..m wu. Yal.nm 11 // P.wm�ml�.�m.o"�mwa1O as SECTION D.D . N"'°'m' "'". Jess Pn.NanR DETENTION POND #3 - OUTLET STRUCTURE DETAILS \ \�ww w.t 4 3-6. �� MU • 7 6 N n-.oL E r B rA/i°io Bop .sae 4a \I! � - 11ffjo,,, A B PUN CIVIL ARTS, INC. AS-BUILTS 04/15/2015 07/24/2015 10/12/2016 THE AS -BUILT INFORMATION! SHOWN ON THIS RECORD DRAWING ACCURATELY PRESENTS DATA FROM FIELD SURVEYS PERFORMED BY CIVIL ARTS. INC. ON 4/15/15 AND 7/24/15. t DECCMDER 16. 2016 4 RO. aseas LL 0 AF90 kG5 SECTION A•A UBECTION BB � 0 ®�® � mlal�a o _ loan o.., �1a1�1ra ' II II �ne.+�� +NNYiIm 1a . unai"'.mes rXioa°'Ec1[[� •. B. SECTION D-0 N OLD . pI,iML�WN. MP wvw lw. DETENTION POND #2 - OUTLET STRUCTURE DETAILS ELI EL3 H EL2 Si W S2 DETENTION POND - EMERGENCY SPILLWAY DETAILS NTS I HEREBY CERTIFY THAT THE AS -BUILT INFORMATION SHOWN HEREON WAS PREPARED BASED ON A FIELD SURVEY MINE UNDER MY RESPONSIRI r�AQOF DE jEMBER 16,. POND #1 W SI SZ H ELt EL2 EL3 1 Y_ 4' 4' 1' 24.25 23.25 24.25 2 24' 4' 4' 7' 24.5 23.5 24.5 3 20' 4' 1 4' 1 ' 30.5 37.5 38.5 -SLL UMNA4t HLHUHI FUK MORE, INFORMATION City of Fort Collins, Colorado UTILITY PLAN Approval APPROWD: aa� ass .ECH6a aY: w.. A.Nq ass cxec@O BY'. CNECNEO BY. CXECHEO BY, CHECNEOBY'. aH....«r..r a.. CHECNEDBY: — CALL UTILITY NOTIFICATION CENTER OF COLORADO 1.900.922.1967 or 534-0700 .Ho. m Ymm O U N Z J J 0 U r z O LL GD File 2427 END DETAILS ,Oes{ d SGS CAecBed SDS Odle 12-07-07 P.evisi.. Project' 2427 48 OF 50