HomeMy WebLinkAboutLot Certifications - 03/26/2004 (9)Mar 19 04 08:25a
Mar 19 04 08:03a
KEM Homes
WEEKS 6 RSSOC.
970-223-4801 P.6
(970J225-2G22 P.8
March 18, 2004
Weeks & Associates, Inc.
Structural Engineers
U�1
KEM Homes
PO Box 1043
Fort Collins, Colorado 80522
Re: Fossil Lake rd Filing
Lot 2, Block 11 -
3521 Copper Spring Drive
Fort Collins, Colorado
Project No. 22002
Gentlemen:
I hereby stato that the elevations and drainage pattern shown on the enclosed Final Grade
Survey Plan were davolopod from a survey porformod on the referenced property on March 17,
2004, and accurately and truly depict the elevations as they existed on this date. To the best of
my knowledge, the surveyed grading is in compliance with the approved grading plan for this lot
and subdivision as shown on the approved utility plans. The relative elevations as depicted may
change subsequent to the date of the survey, due to the subsidence or upheaval of soil, addition
or removal of soils by acts of man, erosion by wind or water or other foctom, Therefore, this
survey may not accurately depict the elevations gnd drainage pattem of the referenced property
after the date of the survey. y
if; ... ..
012
Engineer
Date of Survey
The elevations and drainage pottem shown on the attached Plan are the Professional
Engineer's findings of the finished ground around your residence on the •date shown above.
You, the homeowner must maintain these elevations and grades to properly drain the water
away from your house. The builder of your home will not cover damage to your home caused
as a result of changes made in the finished grades.
in addition, It Is our understanding that the RWC limited warranty protection on your residence
provided by your Builder will not cover structural damage caused as a result of changes made in
the finished drainage grades. Therefore, it is your responsibility to maintain the grades as sot
by the Builder and stated by the Engineer.
Weeks & ASRnCIBIN, Inc. 300 Boardwalk. Building 3, Unit F Fort Coiling, CO 80= (970) 225-2422
970-223-4901 p.7
(9'701225-2622 p.9
Mar 19
04
09:25a
KEM Homes
Mar
19
04 08:03a
WEEKS & ASSOC.
FINAL GRADE SURVEY
LOT 2, BLOCK 11. FOSSIL LAKE 2ND FILING
3521 COPPER SPRINGS DRrvt
FORT COLLINS, COLORADO
97-2
N9OdOO'OO•F 68.00'
97.5
3030 PLAN
3-CAR GARAGE RICHT
15'02' PATIO
LOT AREA-10529 SQ. FT.
07.3
96.5 97.2
,i,e'K12' DATA
96.7 ° "
96.5 '• ��° 97.5 06.9
723' -O 8.6T
W 7.9
N �
1
BASEMENT
TOF=98.2
m CRAWL
N m GARAGE
i;
q w DO NOT E%cAVATC
700' — 4�
Y i1r n I•� Li` ?i
99.c yf, e.33
° :DRaVt 96.4
•,• •a 4.
1.° . .
• N
94.4 N90d00'00•E 4'1.66'
COPPER SPRING DRIVE S87dO911"E• 95.2
1t='L6o.�u'
KEM HOMES
PROJECT NO. 22002
MARCH 18, 2004
1" a 20'-0"
WEEKS & .ASSOCIATES