RE: Fort Collins Brewery - Drainage Certification
Dear Jay:
The purpose of this letter is to provide as -built information for the drainage facilities
constructed as part of the Fort Collins Brewery project.
Detention Pond:
The detention pond area was surveyed by Edmonds Land Surveying on September 3, 2010.
The results of that survey were used to recalculate the pond volumes using the same
methodology as that used for the design. A copy of the revised detention pond volume
rating curve is attached.
The results of the volume calculation indicate that there is adequate volume within the
pond for the required detention volume of 1.08 acre-feet. This volume corresponds to a
water surface elevation of 4940.59 within the pond. Although slightly higher than the design
elevation, this is still lower than the emergency spillway elevation of 4940.60.
In addition, the final finished floor elevation for the adjacent building was surveyed, and that
elevation was found to be 4942.08. This elevation provides 1.49 feet of freeboard from the
100-year water surface elevation to the finished floor. It should be noted that several
elements of the building structure are immediately adjacent to and subject to inundation
from the detention pond. This situation was known to the owner, architect and structural
engineer during the design process, and we have no reason to believe that this was not
accounted for adequately. We simply mention this because Apex Engineering does not
provide architectural, structural or geotechnical services and has no way to check or verify
this. We make no statements concerning, and are not responsible for, any impacts that this
situation may cause to the building, sidewalks, paving, or other structural elements of the
project
There are several aspects of the construction of the pond which may present future
maintenance issues to the owner. Those include less than ideal slopes in the bottom of the
pond and the riprap at the pipe outfalls in the pond. The pond bottom shows several areas
which may not drain completely, and the riprap installation is not as large as designed.
Neither of these issues should affect the detention or water quality performance of the
pond, and the owner has been advised (via this letter) that these areas may need occasional
maintenance in the future.
Culverts. Inlets and Pipes:
The drainage infrastructure such as culverts, inlets and pipes show many minor deviations
from design. The as -built elevations, inverts and slopes are shown on the enclosed Record
Drawings and are based on survey information provided by Edmonds Land Surveying.
Street Drainage:
There are two areas where drainage along the sides of the adjacent streets is less than
optimal. Both of these areas were addressed by minor field adjustments as coordinated
with the Engineering Inspector and other City Engineering Staff. In particular, the throats of
the two type R inlets accepting drainage from Lemay and Lincoln Avenues were constructed
and the storm manhole along storm line B was constructed higher than design with a solid
cover, which was not in accordance with design. This resulted in minor ponding at the
handicap ramp near the intersection and along the western edge of paving for Lemay
Avenue. Drainage near the ramp was provided by a small channel which was ground into
the existing asphalt, and a small gravel drain to the Type R inlet along Lincoln Avenue. It
was determined at a Feld meeting with Wayne Lenard, Tracy Dyer and Marc Virata that the
proposed solution was adequate and the small area of minor ponding adjacent to Lemay
was not an issue since the adjacent street improvements are interim.
Site Drainage:
Many of the privately owned and maintained areas within the site were not graded as per
design. These include the drive aisles, parking areas, sidewalks and the open areas
throughout the site. Most of the variances from design are minor, but several field changes
related to paving slopes were undertaken by the Owner and Contractor for reasons related
to the decision to use concrete paving instead of asphalt paving as shown in the design
documents. These as -built areas were not analyzed in detail since they are private and the
Owner is responsible for maintenance implications of the changes. Based on our visual
observation these changes do not appear to affect the overall drainage concepts or drainage
infrastructure design for the site as a whole.
Enclosed please find the following supporting information:
* Drawings of Records for drainage improvements (PDF format).
Detention pond volume calculations
Drainage Site Certification Checklist
The above stated opinions and calculations are based on the survey information provided by
Edmonds Land Surveying and information provided by the owner and contractor.
Please contact me should you need additional information.
Sincerely,
Bob Gowing, P.E.
CC: Tom Peters, Fort Collins Brewery
Fort Collins Brewery
Detention Pond
As Built Detention Pond Volume Rating Curve
35.50
36.00
36.50
37.00
37.50
38.00
38.50
39.00
39.50
40.00
40.50
40.60
0
386
3,549
7,061
7,113
7,151
7,190
7,518
9,058
9,707
16,274
28,757
31,260
0.000
0.009
0.081
0.162
0.163
0.164
0.165
0.173
0.208
0.223
0.374
0.660
0.718
(100 year Volume) Required =
WQCV Required =
100 vear Volume+ WQCV) Required =
100-year WSEL =
WQ WSEL =
V=3d�A+B+ AB�
where:
V = volume between contour interval
d = elevation, - elevation,-,
A = area of elevation.-, contour
B = area of eievationn contour
0.000
0.001
0.020
0.060
0.081
0.082
0.082
0.084
0.095
0.108
0.147
0.255
0.069
0.092
1.08
acre-ft
acre-ft
0.001
0.021
0.081
0.162
0.244
0.326
0.410
0.505
0.613
0.760
1.015
1.084
36.597
40.593
1:29 PM
APEX ENGINEERING 9/9/2010
City of
F6rt Cottins
October 5, 2010
Fort Collins Brewery
Attn: Tom Peters
1020 E. Lincoln Ave.
Fort Collins, CO 80524
Re: Fort Collins Brewery
Mr. Peters,
Planning, Development & Transportation
Engineering Department
281 North College Avenue
PO Box 580
Fort Collins, CO 80522-0580
970.221.6605
970.221.6378 - fax
This letter is to formally inform you that the development project, Fort Collins Brewery,
has been initially accepted by the City of Fort Collins — Engineering, per the date of this
letter. This includes, but is not limited to, all infrastructure in the public right of way and
public utility easements.
Per your development agreement, you have agreed to provide to the City of Fort Collins a
two-year (2) warranty for all constructed infrastructure as shown in the approved plans
and sheet revisions for this project. In addition, your obligation also carries a five-year (5)
catastrophic failure warranty.
Please be aware that this letter does not relieve the developer, contractors, lot owners or
their subcontractors of their responsibility for the repair of any damage that may occur as
a result of the building construction.
Per your Development Construction Permit and City of Fort Collins Land Use code, the
collateral posted for this project is eligible for reduction. Upon receipt of this letter you
may contact Rebecca Bernstein @ 970.416.2135 to commence this process.
If you have any additional questions you may reach me at 970.222.6824.
Sincerely,
`yneALenard
C.O.F.C. Construction Inspector
Page 1 of 1
Jay Barber
From: Tracy Dyer
Sent: Monday, October 18, 2010 01:16 PM
To: Jay Barber; Wayne Lenard; Marc Virata; Sheri Langenberger
Cc: Glen Schlueter; Roger Buffington
Subject: RE: Fort Collins Brewery Drainage Certification
When ultimate improvements are completed these issues will be resolved. For now they are acceptable as they
relate to the interim improvements made in conjunction with the development. Thx. T
From: Jay Barber
Sent: Wednesday, October 13, 2010 10:32 AM
To: Tracy Dyer; Wayne Lenard; Marc Virata; Sheri Langenberger
Cc: Glen Schlueter; Roger Buffington
Subject: Fort Collins Brewery Drainage Certification
We received the drainage certification for the Fort Collins Brewery. We need verification that you are excepting
the ponding of street runoff at the corner of Lincoln and Lemay and west side of Lemay as discussed in paragraph
3, on page2 of the certification letter attached. We also noticed there is ponding west of the bus stop on Lincoln.
Is this acceptable?
Thank you,
Jay Barber
Storm water Engineer
City of Fort Collins
(970) 416-2241 - Office
(970) 221-6619 - Fax
jbarber@fcgov.com
10/18/2010
Jay, Barber
From: Tom Peters[tompeters@fortcollinsbrewery.com]
Sent: Thursday, October 14, 2010 02:03 PM
To: Jay Barber
Subject: Detention Pond letter
Hi Jay:
I am receipt of letter from A;ex Engineering dated Sept 24, 2010 concerning detention pond
modifications referencing the first paragraph on page 2.
I am agreeing to the wording of this paragraph and if any modifications have to be made to
detention pond, I agree to implement them on my costs.
Let me know if you need anything further from me. thanks
NOTE NEW ADDRESS:
1020 East Lincoln Ave.
Fort Collins, CO 80524
Phones, fax and emails remain the same.
Tom Peters
970-472-1499 x15
1
Foy C'bl.t„oJ
DRAINAGE SITE CERTIFICATION CHEKCLIST
Please fill out all.applicable items in this certification
form for single family, multi -family and commercial
properties.
Write "OK" for items checked or actual number checked ini
field.
Use "N/An for items that are not applicable to the property i
that is being certified.
A. Drainage facilities certification
1. Pond Certification
OK ---volume verifications f} rtlft r��a Vo L +ti,C C�LCy�fJ i ,u�,
a.,topographic records and volume
b.cross-sections and spot elevations
(V j/k -positive fall to pan No pA,v
Gk. -side slopes
Ok--invert.elevation
-spillway elevation
j
Q 1L -placement and size of riprap
(>IL -side slopes
CX -grading
i
}
• O�__-orifice plate installation and size-
Pi/fit -compaction of berm of1y5 fat-jE C ar+P4r_1)o^j
N/pr -structural integrity of pond SCC f41M- it
LVeCreg—
M/A-subsurface media for water quality ponds and
swales
2. . Swales /Vo 5&JALLS
r.//A -location (are they within easement)
i
VIA -dimensions and cross-section verification..
`i
PJIA-longitudinal slopes and side slopes
i
NIA -spot elevations
y
i
r
1
i
NIA -permanent erosion control measures ,(drop structures,
riprap, etc.....)
nl/A-tie-in to pipes, pans, curbs, etc....
a.
/U)A -weir size (elevations, size, opening, etc.)
PI11)A-available freeboard
(� 4-landscaping infringement on swales
3. Pipes
OK --size and type
(24--slopes (as -built and comparison to minimum 0.4%
slope)
(J/A -pipe capacity calculations if slopes are
significantly altered
OK --invert elevations 90 P OV IMATC/icTt.�� ; T� iOLS�Lrv.
S'F A(T.AcHL'2 (24;-c,49-0 10/LAW1rJCj
(,1/A-installation and backfill material
Cho
OK --cover
`k
DAL -encasement and clearance from other utility lines
close by
tJ/A-joints 10,40 /VQT oft&EAjf P.yF in►Si/�i �/�T>�
4. Concrete Pan Channels ,NO Co�e2 �z P 4^Ar
N/A -size
N%/k-slope
N (4-super elevation
Nbi-cross -section
P)/�-thickness
Ak-elevations
5. Inlets
i
Or. --size and type
6>._ -size of opening (or name of standard used)
C)L -grate elevation 4SC65 ►26c'u 0 ,O/2AWw'j6 j
Ok -invert elevation
Ok--box size
6.. Cross pans j/p CROSS PAN S
NO -size
NIA -type
MA -grade
NIA -elevation
/U/A-cross-sectional depth
-tie-in to curb and gutter
7. Culverts
®�,-size
C2I,-type R.�.i�. xtj Rail)
pr-- -invert elevation i
/JIA-headwalls f'SS's Loo4 O►C.
8. Underdrains
tj Ih .size
1UJA -type
/v A -cover
/V/A-backf ill
f
/VIA}-geotextiles I
NSF}-cleanouts
I
9. Curb cuts IUD C L.(l b 0 `rs
NIA -size f
N)/1--tie in to swale, pipe,, etc,...
i
B. Certification of Grade Elevations Adjacent to Drainage
Facilities: f
1
i
t
i
,Nick —minimum opening elevations No A43Ace.•cs UparvrjGs
Q K-.-top of foundation elevations
pk -comparison to 100 year WSEL's (Freeboard S(�L *TV4[ HC-,�
requirements and floodplain issues)
C. Certification of Erosion Control Measures:'
1. Permanent Measures:
Or, -Permanent vegetation (6"'bare spots and weeds under
control) STD LL Sd('c)AQ S }�o� 1 nJ P�NiJ i S i
bY__ -riprap tA'105CAA ri& Lov�Lj (rooms
iQ lA -riprap bedding N oT DRYS(_ YRvr=
PJA -drop sections
®L -sediment basins/water'quality ponds
tJIA -netting mats/blankets
NIf} -mulching
2. Temporary Measures:
DL mulching N0 j D%J -Sri e
DL-inlet filter installation So
ADDQ€S5 PL-P_F_>,_0mAr-jc-F_
oy-. check bale -dams
OIL -seeding and temporary vegetation
Or. --silt fence
D. Site Cleanup After Construction
D K- -construction clean up
Q/L -smoothing of ruts
0y,- reseeding
E. Statement of Compliance
This certification is signed and stamped and by signing
this form the engineer(s) attests that they have inspected
the site and to the best of their knowledge the as -built
conditions of the drainage facilities are as described in
the above form and in the redlined plans enclosed. .
Failure to properly disclose all known information could
result in the rejection of this certification and prevent
the release of any Stormwater Utility holds on Building
Permits and/or Certificates of,Occupancy.
F. .Signature and Stamp by a Colorado Registered
Professional Engineer.
i
MATCH TO EXIST BORROW DITCH
MATCH TO EXISTING SIDEWALK
CONTRACTOR TO TRAN9TION AS NEEDED
w I W
MATCH TO EXISTING EOA
SAWCUI EXIST PAYING
NOTE: LOCATION OF STREET CL I
IS APPROXIMATE. CONTRACTOR TO
COORDINATE EXACT STREET CUT
LOCATION NTH CITY INSPECTOR (TYP.)
MATCH TO EXISTING EOA
INSTALL TEMPORARY DIVERSION SWALE
IN INTERIM CONDITION O 0.50i
NSTALL NEENAH R-25M INLET
IN INTERIM CONDITION AT ELEV 39.32
MANHOLE TO BE RAISED IN ULTIMATE
BUILDOUT OF LEMAY TO 491050
EXIST PRPA POWER POLE AND
POWER LINE TO REMAIN
b
\
r '9
HANDR SAI IEV
I
I
M.
/ I
i
NOTE: CONTRACTOR SHALL CONTACT THE
PRPA SUPERVISOR AT LEAST ONE WEEK
I
IN
I, I
PRIOR TO STARTING CONSTRUCTION.
1
o;
INFLOW CURB
i I
CONTRACTOR SHALL MEET ALL PRPA
REQUIREMENTS FOR CONSTRUCTION IN
AND GUTTERI
1
I
Y
1
PRPA EASEMENT AND ADJACENT TO
(
PRPA FACILITIES
d'
A
DIP
FFE=4942.4608 - -
NOTE: DETENTION
ABUTER
M
I
+
1
INSTALL TEMPORARY MVER90N SWALE
DIRECTLY
POND DIRECTLY ABUTS BUILDING
1
IN INTERN CONDITION O O.SOR
FOUNDATION
WALL. FOUNDATION AND
I
I
BUDDING TO
BUILDING TO BE OEBICNED AND
1
9
I
FFE 942.25
CONSTRUCTED TO ACCWOUATE
1
I
1
WATER LEVELS, SEE
\
TYPE L RIPRAP, D50=9'
I
`O
SFLUXUATINGTRUCTURAL
STRUCNRAL PLANS N ARCHIIECNRAL
DRAWINGS.
I
1
PLACE 6' BELOW FINISHED GRADE
1
COVER W/6' TOPSOIL AND SOO
'NtN i
I
RAISED DECK TO BE ELEVATED OVER
\
Y
Q \
1T``1V\
/I
11
SEE LANDSCAPE PLAN
1
I
y
,{
LOW CHORD ELEV 4994411..0
DETENTION POND
INFLOW CURB T T IYSE IOU
AND WRIER O dP '' 9 VDL REOD
e.-------- aaxx .,oex
laxux)
r W Yrt
o4wm
ZYe IVO r ..
Rw
WIT&
�
a� uioaa .n
Y.9.Ylf N t' aEaC) R I.Id® e�ux mm u saecwx n.n
n o
x Axrrxcawr mxw ry tm ue
m� W.�aa.m.exxa>a
wr wa xx. aaxxia xa.. cwror ry4wx
e°�xArx4�anTM�yv^ °x^'
a.P, x.. a aao4o w mrs...ca re
w, ruaa�c nm uws a arzem, ,wA
TIIOIf .I [C/�TI/1\I
DETENTION POND RETAINING WALLS
ALONG LINCOLN AVENUE
ULTIMATE CONDITION
HITS
NOM
I ALL PROPOSED SLOPES NTNW ROW SHALL RAVE A MOPE NO STEEPER
THAN 4:1.
2. ALL CURB AND GUTTER IS OUNALL UNLESS OTHERWISE NOTED.
3, ALL PROPOSED GRADES ARE RELATIVE TO A BASELINE OF 4906.
4. ALL PROPOSED GRADES ARE ILOWINE OR TOP OF SURFACE. UNLESS
OTHERWISE NOTED.
5. CONTRACTOR TO ENSURE INTERIM PAVEMENT PATCHING MEETS LUCASS
STANDARDS IN RELATION TO ALLOWABLE CROSS -MOPES FOR
RECONSTRUCTION OF PAVEMENT PROPOSED SPOT ELEVATIONS SHOWN
FOR EXISTING PAVEMENT ARE APPROXIMATE (FROM TOPOGRAPHIC SURVEY)
AND SHOULD BE VERIFIED BY CONTRACTOR PRIOR TO NEW PAVEMENT
IMPROVEMENTS.
6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL UNITS ARE TO BE
DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL
REPAIRS ARE TO BE IN ACCORDANCE WITH CITY STANDARDS
T. THE ENTIRE SITE IS WITHIN THE CACHE LA POUDRE 5W-TEAR
FLOOOPIAN.
8- STREET TREES TO BE MINTED IN THE ULTIMATE PARK STRIP SHALL BE
PLANTED SO THAT FUTURE ULTIMATE GRADING WILL NOT HARM THE TREE
LANDSCAPE INSTALLER SHALL COORDINATE ELEVATION OF AND GRADING
AROUND STREET TREES WITH THE LANDSCAPE ARCHTECT AND ENGINEER
PRIOR TO INSTALLATION.
MATCH TO EXIST BORROW DITCH_
t
$ 1 \ 1
9_�3'v3'x4 CDNC FAD
- 42
-INSTALL TEMPORARY DIVERSION SWALE \\ t PV,
C O O 0.80% \ I•QiLe \\
..__ _. -. \\ r00
TERN
MARGIN TO EXIST
_ATCH TO EXIST 6 BIKE LANE- - MATCH i0 EAST STRIPING
RECYCLED ASPHALT SHOULDER
WIDTH - 2 MN. DEPTH - \
TEMP ASPHALT
MADE AREA SOUTH OF PROPOSED PAWING PROP INTERIM DRIVEWAY TO TIE EXISTING BUS STOP TO BE RELOCATED SIDEWALK CONNECTION.
AS NEEDED TO PROVIDE A SEAMLESS TRANSITION NlD WTDRIM PAVEMENT WIDENING ACCORDING TO TRANSPORT REOUREMENTS. MATCH TO EXISTING j
FROM EDGE OF BIKE LANE TO EXISTING (%ROUND. ADDITIONAL PAVEMENT REWIRED PROP BUS STOP BENCH RELOCATION CONTRACTOR TO CONTACT TRANSPORT PRIOR EDGE Of PAYING f GRADING SHALL ENSURE PERPEIUARON CONTRACTOR TO COORDINATE EXACT TO STARTING CONSTUCTION TO COORDINATE.
OF AINAGE FLOW OFF STREET. FOR THE INTERIM CONDITION LOCATION NTH TRANSPORT \
CROSS SLOPE = zox
DmwkW d Retard
TInr4 DrexEO d Ilxrud Nm ban Frpree Wee m v.ryd�
abeYae Arm fdmwdr teas Tu.eryN, e.� Ap�0, r, Y nY
r�por@L tr h emeeey d e,.4r-bunt a q WerYn
IMideJ Iw•M.
TM Eba tiw ben mlrwd 1y h C4 dFvXCdhtrmnp
mry. TN4 mM tenet e,4ly rWpa , byh nMwlW
EWalaaax h Oq 6W,.., hC4 dram Ca tramrecy
a+ecar,xdaxdhta ah nNwda�riot
prdftftW.ftpaWh
r.qWTMnlwtlm.mIng.. gaNa
amparca dM1W W rynnWRy 1rh Ogdfas Catrr tr
dlna.l4rur. dlYs rl,ar,n hl a9 Y rWIYM daTAr h
miW,wMn Ora
City of Fort CoWna, Colorado
UTHITY PLAN Approval
APPROVED: DATE_
CRy Engin�
01EOND BY: DAIS:
WPta/W.t.ta UtEKy
CHECKED BY: Wmxx n y DAR:.-
q cmo BY: DALE:_
�mREFnq ,Ti w
STORY \\ 1 -� ,I •\ 1 '\ 1SCAM V-W
LINE B
i -STORY '
\ \ l \ NOTE
LINE E I STORY- \ I STORY 5' TYPE\R' WEET` L SEE DETAIL SHEETS FOR ADDITIONAL
\STORM • \ OUTLET STRUCTURE LINE 8 LINE B STA: 10+42.16 INFORMATION.
tI
PIPE ENO I STA: 10+43.85 STORY PWE ENO STORM N: 1458079.37
STA: 10400 %lNE F \ N: 1458074.75I NE F STA: 9+97.45 I NE F E: 3123626.44
N: 141M1067.00 I I E: TAL SHEET
�, '�
F. 312357&2i y SEE DETAIL SHEET - N: 1458079.28
-_ _ - �1 I I \ l� E: 312351D.2B
LINERE \ 0+4 16
_ r
-- ---�
--
• 1
(SINE \ — - --- _ *3. �fTl _ _ ._= 9 .45 \, ml
Ise
0t
\W
STORM LINE C 5' TYPE'R' INLET
\ / \
E: 3123593.04 \\ STORM LINE C AV \`� STORM LINE C A / '\
LINCOLN
\ \ \
AVE. — - — — — — —
MODIFIED 10' THE R MALT \
STA: 10t05.17
INSTALL W EXISTING 2-I5' STORM
STORM LINE D STORM LINE E STORM LINE F
HORL SCALE
1--20'
-VERT. SCALE
1"-W
4%0
o
4960
ri
a
49SS
--
4955
m^.
��
t3
+�^a
4950
a
'
4950
_
rc1z
PROPOSED
GRADE
4945
4945
26.0
16•
4940
494_0-
I
` J
ElOS1W0
GROUND
4935
_
62
_
_ -- 4935
4930
4930
4925
4M
4920
49W
491S
-
- 4915
HORL SCALE 1'-20'
_
VERL SCALE 1'-5'
w
I
4960
_
_
a
�.6
1
49SS
49
S
49SO
$
4
-_ tm
s
_
go
_
4
EIOSIINC
«tOLIHD
4945
_
--
—
_
_S
-
4W
4935
—
4935_
_17
Y 43.g5
F.
Lg6!'4
w>Y
4930
4930
4925
4935
49,20
4M
4915
— -
_
_
—
4915
HORL SCALE
I'-20'
VERT. SCALE
1'=5'
4960
4960
49SS
495S
i
R
4950
49SO
+am$
a
z--._
. rc
4
- -
_
PROPOSED
a
_ _..
4945
--
GRADE
—
-
F
4940
—
3. ex
C
4935
1n'
RcP J
- -
- -
4935
-
STING
GROUND
4930
4930
AIM
_---
_
4935
4=1
--
-
4920_
4915
--
--
-
_
4915
DnrYW d Rsmld
de.W iaw Frmb IN 9�w1bs AFa Fk.
r�.ym�lY��Ma 4®q d4M i:l.ta aVs� vw7 s4am.dm
lIw4 PI'm mw Oau.rwy.me ky C
.AGgiygma
d fan Cdnb mop - -
eee, raW
Emewq
4WayRy+oa wa Cq rgoar. ar tAa qd im CaMn b rnaa9
uE conanmTu d.M1e cLcW�:n... 7vYrwe A rm�w Lem as
.a4aRea Tn« r.na.. wx�.xaaa.m.ci, d nnu
apranre a buru''We'm^i9 hm. Clq Tan Cm b
.eada�d q..,wu.,4 mm, w-n ua �sy r r.gw,r n.r♦ �ti
eaa,m..
City of Fort Collins, Colorado
UTILITY PLAN Appro4al
ARPROVELI
C i'.ED 61 DATE
vaI«/Ymnle.aia. UR+y
wEceED R+ s17,14il'DATE.Q'�1�9
m
CNELnED Br.. Ift TF, DALE:
IDm 10+40 104610 I 10+00 10+40 10#w I 10400 IOHO 10480 I J
0
z
r,T
i za
of Tb1 N r
a602OJ P
O
� a a
z
u P
w g
z s
z a
W � r
<$
toa
0Ury
L)
■ 0 r
zt
LL
W
W
m pJ
V7 u
Z :3 Z
0 IL o
U
U LA
� O
O
LL i/f
SHEcI
13 EM 18
m
4945
4940
4935
4930
4925
i
■7— .
_---------------------FF
I
---------JUF ------------------------------
�44+27.50 14+00
13+00 12+00
Sol . . . m at
�m
- - - -- - - - --------------
- - -
E1 STORM LINE A
'
-
I I
TYPE '13' METI I
STA: 14+21.50 I
N: 149264.55 I
E: 3123263.64
I
I I
I I
I
I I
I I
I
I I
I I
I
I I
I
I I
I I
I
I I
I I
I I
I
I I
I
TYPE 'Ir INLET
STA: 13+47.90
N: 1458284.56
E: 3123353.23
TYPE 13 INLET E: 312352 9.25
STA: 12+66.90 STORM LINE E
N: 1458284.56
E: 3123444.23
TYPE -13 INLET /
STA: 11+65.90—/
N: 145R284.56
E: 3123525.23
PIPE END
TRENCH IMNN
STA: I0+00
N: 1458132.72
E: 312359.25
JAM
AN
wiE�i�
■
■
■
Inr
I
1
1
1
I
1
I
1
I
■
I■
�
�
■
I
1
�
�
I
■
�
NORZ. SOME C-20'
PERT. SCALE 1*-S'
o
4%0
4"S
1
4950
4945
4M
4935
15'
1
4930
_
4925
4920
4915
DmW1p d R.d
TYsw O^r'Y'O d Pemrd Yvw loam Pend Ywd m �wI dm
aboh�tl han Ehmrb lyd EwrryYiL Apv �� Y nev
r�p..YY b w.w...y dw.ar v 4erp vey dw�.4m
TYN4rlen ra Yer rwewrMwCq dfon Cean bawap
aeb. TM re.Y.4e.mYSMrws.a4Mwr.�Ywa
dyvammi wCq Fgrr.swClgdran Ceasbemray
wd wrarnnadw obitlm. FMaws�w..�s.4e
rtir vv yunm dw dwmw�ww•d��r
rpwea Ine rave. mY eatM ®,.dYNyrYNe�
aaywrr dsaa+a q..ory y wcpd am Cnia b
.Arla.a w+^�• d e.sale.e ar. Aar ee.4.r.ee.q w
(ANY of Fort Colllos, Colorado
UTILITY PLAN Approval
tsnooYfn!^e5�� oA1e.j�
C .♦
aEG%FD Br. � uAR
Walm/.osieaals UNily � ��� p
�'J r
CHECKED or. % DATE:. -_
— — — — _ — — — — —
MOOIRED 10' TYPE R INLE
STA 1040
N: 14550620
E: 31236226
INSTALL ON EXISTING 2-15' STORi
QEXIST NWCWD-,
WATERLINE
-s--a5
N: 1459326.96
E: 3123602.49
CONTRACTOR SHALL
GRADE CHANNEL
CHANNEL AS NEEDED
TO MATCH TO EXISTING
2• BLOEBOARD INSIAATION TO BE
INSTALLED ALONG STORM LINE B
WTIERE CLEARANCE BETWEEN
STORM LINE AND EXIST NWCWD
WATERLINE IS LESS THAN 3D'
4955
4950
STORM LWE 0
/
/
/
/ I I
/
STORM LINE F
INKIMIL
8• RCP
_._IB_RCY
_
STORM -
- --- I
LINE D'
I I
18' RCP
I
I
STORM LINE A
STORY MF B
71M.3464 18• RCP
I
STA:
,
N: 14581903
I
E: 3123606.40
STORM
I I
LINE C
]0 RCP
I
STORM LINE B
HOR2. SCALE 1'-20'
VERT. SCALE V-S'
J
_
N
4960
03
n
ao
49SS
A�
ink
g
+
SIBES-0F
_.'
F
AS IWiE
D BY GTY
INCPF!'.LM
'
t2 Er.
EXIST
4930
4925
4920I t
1I1I1`_ - -- --
PROPOSED GRADE
4W
. 134.81.i. H 1.3230 _- 4935
I MIN
O0RCA-
FLOVE LL TO 5' BC TH SIDES OF
E ISTING WATERLINE OR A
DBTEC BY NWO INSPECTO 4930
_. EXIST HCWCDSTORM JQWTS
WA- LINE 10' EITHER SIDE OF WA LINE WITH
Ei-WRAP TYL EXTERI MNT WR
_-.4M
LLI
Q
J
0
Z
J
MY 0 20
NOTE:
L SEE DETAIL SHEETS FOR ADDITIONAL NF0i, lATk N
DmwUwdReo d
T1wa D...rep d IVrud I.w t Pma.a Baal m vw7 d•n
aMaYW Awe Eb�wnb Lad lan'eYlaL AWa C�waYa Y mt
rapv�Na b /a v�1 ddw aHeilt a da1P erny YXvnvlm
Mdad w.w
TAaalyna AM Maa rMwC b W Cq dive Cabo b aary
aay. lb aals is Ys ieWy ^+a+14 4.aa mt.q
1prvree W Cq Tnleeay. s W Cgdba Cale b aavaq
W eaera.aaa ae«e aloiNaN. f..d..awA lw.ew.w Jeum
avWly'tls. Me auannoea ddN Yaiw an W oba dada Nd 4adua
repare6 TM renew dal maNmwmltlwmy.vWna
gwnce d Man.W napwti4ey b1 Ue Clry a fen [nM. h
.m«ow gwMY.,.a arm.Mwa.w ++r ee.eaw.e � da
.maysum yNu.
City of Fort Collin; Colorado
UTILITY PLAN Approval
APPRpEp.-!,�� DAiF. 044j!
L w
�Yoler/N'allewler uNtly `,l o
OeOED 9Y. -AS DAi
CHEOQO BY.------ a- _ DATE:
J
No Text