Loading...
HomeMy WebLinkAboutSite Certifications - 10/19/2010OCT 11 zoo ENGINEERING 238 Walnut Street ■ Suite 200 r Fort Collins, Colorado 80524 ■ 970.797.2906 September 24, 2010 Mr. Jay Barber City of Fort Collins, Stormwater Department 700 Wood Street Fort Collins, CO 80521 RE: Fort Collins Brewery - Drainage Certification Dear Jay: The purpose of this letter is to provide as -built information for the drainage facilities constructed as part of the Fort Collins Brewery project. Detention Pond: The detention pond area was surveyed by Edmonds Land Surveying on September 3, 2010. The results of that survey were used to recalculate the pond volumes using the same methodology as that used for the design. A copy of the revised detention pond volume rating curve is attached. The results of the volume calculation indicate that there is adequate volume within the pond for the required detention volume of 1.08 acre-feet. This volume corresponds to a water surface elevation of 4940.59 within the pond. Although slightly higher than the design elevation, this is still lower than the emergency spillway elevation of 4940.60. In addition, the final finished floor elevation for the adjacent building was surveyed, and that elevation was found to be 4942.08. This elevation provides 1.49 feet of freeboard from the 100-year water surface elevation to the finished floor. It should be noted that several elements of the building structure are immediately adjacent to and subject to inundation from the detention pond. This situation was known to the owner, architect and structural engineer during the design process, and we have no reason to believe that this was not accounted for adequately. We simply mention this because Apex Engineering does not provide architectural, structural or geotechnical services and has no way to check or verify this. We make no statements concerning, and are not responsible for, any impacts that this situation may cause to the building, sidewalks, paving, or other structural elements of the project There are several aspects of the construction of the pond which may present future maintenance issues to the owner. Those include less than ideal slopes in the bottom of the pond and the riprap at the pipe outfalls in the pond. The pond bottom shows several areas which may not drain completely, and the riprap installation is not as large as designed. Neither of these issues should affect the detention or water quality performance of the pond, and the owner has been advised (via this letter) that these areas may need occasional maintenance in the future. Culverts. Inlets and Pipes: The drainage infrastructure such as culverts, inlets and pipes show many minor deviations from design. The as -built elevations, inverts and slopes are shown on the enclosed Record Drawings and are based on survey information provided by Edmonds Land Surveying. Street Drainage: There are two areas where drainage along the sides of the adjacent streets is less than optimal. Both of these areas were addressed by minor field adjustments as coordinated with the Engineering Inspector and other City Engineering Staff. In particular, the throats of the two type R inlets accepting drainage from Lemay and Lincoln Avenues were constructed and the storm manhole along storm line B was constructed higher than design with a solid cover, which was not in accordance with design. This resulted in minor ponding at the handicap ramp near the intersection and along the western edge of paving for Lemay Avenue. Drainage near the ramp was provided by a small channel which was ground into the existing asphalt, and a small gravel drain to the Type R inlet along Lincoln Avenue. It was determined at a Feld meeting with Wayne Lenard, Tracy Dyer and Marc Virata that the proposed solution was adequate and the small area of minor ponding adjacent to Lemay was not an issue since the adjacent street improvements are interim. Site Drainage: Many of the privately owned and maintained areas within the site were not graded as per design. These include the drive aisles, parking areas, sidewalks and the open areas throughout the site. Most of the variances from design are minor, but several field changes related to paving slopes were undertaken by the Owner and Contractor for reasons related to the decision to use concrete paving instead of asphalt paving as shown in the design documents. These as -built areas were not analyzed in detail since they are private and the Owner is responsible for maintenance implications of the changes. Based on our visual observation these changes do not appear to affect the overall drainage concepts or drainage infrastructure design for the site as a whole. Enclosed please find the following supporting information: * Drawings of Records for drainage improvements (PDF format). Detention pond volume calculations Drainage Site Certification Checklist The above stated opinions and calculations are based on the survey information provided by Edmonds Land Surveying and information provided by the owner and contractor. Please contact me should you need additional information. Sincerely, Bob Gowing, P.E. CC: Tom Peters, Fort Collins Brewery Fort Collins Brewery Detention Pond As Built Detention Pond Volume Rating Curve 35.50 36.00 36.50 37.00 37.50 38.00 38.50 39.00 39.50 40.00 40.50 40.60 0 386 3,549 7,061 7,113 7,151 7,190 7,518 9,058 9,707 16,274 28,757 31,260 0.000 0.009 0.081 0.162 0.163 0.164 0.165 0.173 0.208 0.223 0.374 0.660 0.718 (100 year Volume) Required = WQCV Required = 100 vear Volume+ WQCV) Required = 100-year WSEL = WQ WSEL = V=3d�A+B+ AB� where: V = volume between contour interval d = elevation, - elevation,-, A = area of elevation.-, contour B = area of eievationn contour 0.000 0.001 0.020 0.060 0.081 0.082 0.082 0.084 0.095 0.108 0.147 0.255 0.069 0.092 1.08 acre-ft acre-ft 0.001 0.021 0.081 0.162 0.244 0.326 0.410 0.505 0.613 0.760 1.015 1.084 36.597 40.593 1:29 PM APEX ENGINEERING 9/9/2010 City of F6rt Cottins October 5, 2010 Fort Collins Brewery Attn: Tom Peters 1020 E. Lincoln Ave. Fort Collins, CO 80524 Re: Fort Collins Brewery Mr. Peters, Planning, Development & Transportation Engineering Department 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax This letter is to formally inform you that the development project, Fort Collins Brewery, has been initially accepted by the City of Fort Collins — Engineering, per the date of this letter. This includes, but is not limited to, all infrastructure in the public right of way and public utility easements. Per your development agreement, you have agreed to provide to the City of Fort Collins a two-year (2) warranty for all constructed infrastructure as shown in the approved plans and sheet revisions for this project. In addition, your obligation also carries a five-year (5) catastrophic failure warranty. Please be aware that this letter does not relieve the developer, contractors, lot owners or their subcontractors of their responsibility for the repair of any damage that may occur as a result of the building construction. Per your Development Construction Permit and City of Fort Collins Land Use code, the collateral posted for this project is eligible for reduction. Upon receipt of this letter you may contact Rebecca Bernstein @ 970.416.2135 to commence this process. If you have any additional questions you may reach me at 970.222.6824. Sincerely, `yneALenard C.O.F.C. Construction Inspector Page 1 of 1 Jay Barber From: Tracy Dyer Sent: Monday, October 18, 2010 01:16 PM To: Jay Barber; Wayne Lenard; Marc Virata; Sheri Langenberger Cc: Glen Schlueter; Roger Buffington Subject: RE: Fort Collins Brewery Drainage Certification When ultimate improvements are completed these issues will be resolved. For now they are acceptable as they relate to the interim improvements made in conjunction with the development. Thx. T From: Jay Barber Sent: Wednesday, October 13, 2010 10:32 AM To: Tracy Dyer; Wayne Lenard; Marc Virata; Sheri Langenberger Cc: Glen Schlueter; Roger Buffington Subject: Fort Collins Brewery Drainage Certification We received the drainage certification for the Fort Collins Brewery. We need verification that you are excepting the ponding of street runoff at the corner of Lincoln and Lemay and west side of Lemay as discussed in paragraph 3, on page2 of the certification letter attached. We also noticed there is ponding west of the bus stop on Lincoln. Is this acceptable? Thank you, Jay Barber Storm water Engineer City of Fort Collins (970) 416-2241 - Office (970) 221-6619 - Fax jbarber@fcgov.com 10/18/2010 Jay, Barber From: Tom Peters[tompeters@fortcollinsbrewery.com] Sent: Thursday, October 14, 2010 02:03 PM To: Jay Barber Subject: Detention Pond letter Hi Jay: I am receipt of letter from A;ex Engineering dated Sept 24, 2010 concerning detention pond modifications referencing the first paragraph on page 2. I am agreeing to the wording of this paragraph and if any modifications have to be made to detention pond, I agree to implement them on my costs. Let me know if you need anything further from me. thanks NOTE NEW ADDRESS: 1020 East Lincoln Ave. Fort Collins, CO 80524 Phones, fax and emails remain the same. Tom Peters 970-472-1499 x15 1 Foy C'bl.t„oJ DRAINAGE SITE CERTIFICATION CHEKCLIST Please fill out all.applicable items in this certification form for single family, multi -family and commercial properties. Write "OK" for items checked or actual number checked ini field. Use "N/An for items that are not applicable to the property i that is being certified. A. Drainage facilities certification 1. Pond Certification OK ---volume verifications f} rtlft r��a Vo L +ti,C C�LCy�fJ i ,u�, a.,topographic records and volume b.cross-sections and spot elevations (V j/k -positive fall to pan No pA,v Gk. -side slopes Ok--invert.elevation -spillway elevation j Q 1L -placement and size of riprap (>IL -side slopes CX -grading i } • O�__-orifice plate installation and size- Pi/fit -compaction of berm of1y5 fat-jE C ar+P4r_1)o^j N/pr -structural integrity of pond SCC f41M- it LVeCreg— M/A-subsurface media for water quality ponds and swales 2. . Swales /Vo 5&JALLS r.//A -location (are they within easement) i VIA -dimensions and cross-section verification.. `i PJIA-longitudinal slopes and side slopes i NIA -spot elevations y i r 1 i NIA -permanent erosion control measures ,(drop structures, riprap, etc.....) nl/A-tie-in to pipes, pans, curbs, etc.... a. /U)A -weir size (elevations, size, opening, etc.) PI11)A-available freeboard (� 4-landscaping infringement on swales 3. Pipes OK --size and type (24--slopes (as -built and comparison to minimum 0.4% slope) (J/A -pipe capacity calculations if slopes are significantly altered OK --invert elevations 90 P OV IMATC/icTt.�� ; T� iOLS�Lrv. S'F A(T.AcHL'2 (24;-c,49-0 10/LAW1rJCj (,1/A-installation and backfill material Cho OK --cover `k DAL -encasement and clearance from other utility lines close by tJ/A-joints 10,40 /VQT oft&EAjf P.yF in►Si/�i �/�T>� 4. Concrete Pan Channels ,NO Co�e2 �z P 4^Ar N/A -size N%/k-slope N (4-super elevation Nbi-cross -section P)/�-thickness Ak-elevations 5. Inlets i Or. --size and type 6>._ -size of opening (or name of standard used) C)L -grate elevation 4SC65 ►26c'u 0 ,O/2AWw'j6 j Ok -invert elevation Ok--box size 6.. Cross pans j/p CROSS PAN S NO -size NIA -type MA -grade NIA -elevation /U/A-cross-sectional depth -tie-in to curb and gutter 7. Culverts ®�,-size C2I,-type R.�.i�. xtj Rail) pr-- -invert elevation i /JIA-headwalls f'SS's Loo4 O►C. 8. Underdrains tj Ih .size 1UJA -type /v A -cover /V/A-backf ill f /VIA}-geotextiles I NSF}-cleanouts I 9. Curb cuts IUD C L.(l b 0 `rs NIA -size f N)/1--tie in to swale, pipe,, etc,... i B. Certification of Grade Elevations Adjacent to Drainage Facilities: f 1 i t i ,Nick —minimum opening elevations No A43Ace.•cs UparvrjGs Q K-.-top of foundation elevations pk -comparison to 100 year WSEL's (Freeboard S(�L *TV4[ HC-,� requirements and floodplain issues) C. Certification of Erosion Control Measures:' 1. Permanent Measures: Or, -Permanent vegetation (6"'bare spots and weeds under control) STD LL Sd('c)AQ S }�o� 1 nJ P�NiJ i S i bY__ -riprap tA'105CAA ri& Lov�Lj (rooms iQ lA -riprap bedding N oT DRYS(_ YRvr= PJA -drop sections ®L -sediment basins/water'quality ponds tJIA -netting mats/blankets NIf} -mulching 2. Temporary Measures: DL mulching N0 j D%J -Sri e DL-inlet filter installation So ADDQ€S5 PL-P_F_>,_0mAr-jc-F_ oy-. check bale -dams OIL -seeding and temporary vegetation Or. --silt fence D. Site Cleanup After Construction D K- -construction clean up Q/L -smoothing of ruts 0y,- reseeding E. Statement of Compliance This certification is signed and stamped and by signing this form the engineer(s) attests that they have inspected the site and to the best of their knowledge the as -built conditions of the drainage facilities are as described in the above form and in the redlined plans enclosed. . Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any Stormwater Utility holds on Building Permits and/or Certificates of,Occupancy. F. .Signature and Stamp by a Colorado Registered Professional Engineer. i MATCH TO EXIST BORROW DITCH MATCH TO EXISTING SIDEWALK CONTRACTOR TO TRAN9TION AS NEEDED w I W MATCH TO EXISTING EOA SAWCUI EXIST PAYING NOTE: LOCATION OF STREET CL I IS APPROXIMATE. CONTRACTOR TO COORDINATE EXACT STREET CUT LOCATION NTH CITY INSPECTOR (TYP.) MATCH TO EXISTING EOA INSTALL TEMPORARY DIVERSION SWALE IN INTERIM CONDITION O 0.50i NSTALL NEENAH R-25M INLET IN INTERIM CONDITION AT ELEV 39.32 MANHOLE TO BE RAISED IN ULTIMATE BUILDOUT OF LEMAY TO 491050 EXIST PRPA POWER POLE AND POWER LINE TO REMAIN b \ r '9 HANDR SAI IEV I I M. / I i NOTE: CONTRACTOR SHALL CONTACT THE PRPA SUPERVISOR AT LEAST ONE WEEK I IN I, I PRIOR TO STARTING CONSTRUCTION. 1 o; INFLOW CURB i I CONTRACTOR SHALL MEET ALL PRPA REQUIREMENTS FOR CONSTRUCTION IN AND GUTTERI 1 I Y 1 PRPA EASEMENT AND ADJACENT TO ( PRPA FACILITIES d' A DIP FFE=4942.4608 - - NOTE: DETENTION ABUTER M I + 1 INSTALL TEMPORARY MVER90N SWALE DIRECTLY POND DIRECTLY ABUTS BUILDING 1 IN INTERN CONDITION O O.SOR FOUNDATION WALL. FOUNDATION AND I I BUDDING TO BUILDING TO BE OEBICNED AND 1 9 I FFE 942.25 CONSTRUCTED TO ACCWOUATE 1 I 1 WATER LEVELS, SEE \ TYPE L RIPRAP, D50=9' I `O SFLUXUATINGTRUCTURAL STRUCNRAL PLANS N ARCHIIECNRAL DRAWINGS. I 1 PLACE 6' BELOW FINISHED GRADE 1 COVER W/6' TOPSOIL AND SOO 'NtN i I RAISED DECK TO BE ELEVATED OVER \ Y Q \ 1T``1V\ /I 11 SEE LANDSCAPE PLAN 1 I y ,{ LOW CHORD ELEV 4994411..0 DETENTION POND INFLOW CURB T T IYSE IOU AND WRIER O dP '' 9 VDL REOD e.-------- aaxx .,oex laxux) r W Yrt o4wm ZYe IVO r .. Rw WIT& � a� uioaa .n Y.9.Ylf N t' aEaC) R I.Id® e�ux mm u saecwx n.n n o x Axrrxcawr mxw ry tm ue m� W.�aa.m.exxa>a wr wa xx. aaxxia xa.. cwror ry4wx e°�xArx4�anTM�yv^ °x^' a.P, x.. a aao4o w mrs...ca re w, ruaa�c nm uws a arzem, ,wA TIIOIf .I [C/�TI/1\I DETENTION POND RETAINING WALLS ALONG LINCOLN AVENUE ULTIMATE CONDITION HITS NOM I ALL PROPOSED SLOPES NTNW ROW SHALL RAVE A MOPE NO STEEPER THAN 4:1. 2. ALL CURB AND GUTTER IS OUNALL UNLESS OTHERWISE NOTED. 3, ALL PROPOSED GRADES ARE RELATIVE TO A BASELINE OF 4906. 4. ALL PROPOSED GRADES ARE ILOWINE OR TOP OF SURFACE. UNLESS OTHERWISE NOTED. 5. CONTRACTOR TO ENSURE INTERIM PAVEMENT PATCHING MEETS LUCASS STANDARDS IN RELATION TO ALLOWABLE CROSS -MOPES FOR RECONSTRUCTION OF PAVEMENT PROPOSED SPOT ELEVATIONS SHOWN FOR EXISTING PAVEMENT ARE APPROXIMATE (FROM TOPOGRAPHIC SURVEY) AND SHOULD BE VERIFIED BY CONTRACTOR PRIOR TO NEW PAVEMENT IMPROVEMENTS. 6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL UNITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS ARE TO BE IN ACCORDANCE WITH CITY STANDARDS T. THE ENTIRE SITE IS WITHIN THE CACHE LA POUDRE 5W-TEAR FLOOOPIAN. 8- STREET TREES TO BE MINTED IN THE ULTIMATE PARK STRIP SHALL BE PLANTED SO THAT FUTURE ULTIMATE GRADING WILL NOT HARM THE TREE LANDSCAPE INSTALLER SHALL COORDINATE ELEVATION OF AND GRADING AROUND STREET TREES WITH THE LANDSCAPE ARCHTECT AND ENGINEER PRIOR TO INSTALLATION. MATCH TO EXIST BORROW DITCH_ t $ 1 \ 1 9_�3'v3'x4 CDNC FAD - 42 -INSTALL TEMPORARY DIVERSION SWALE \\ t PV, C O O 0.80% \ I•QiLe \\ ..__ _. -. \\ r00 TERN MARGIN TO EXIST _ATCH TO EXIST 6 BIKE LANE- - MATCH i0 EAST STRIPING RECYCLED ASPHALT SHOULDER WIDTH - 2 MN. DEPTH - \ TEMP ASPHALT MADE AREA SOUTH OF PROPOSED PAWING PROP INTERIM DRIVEWAY TO TIE EXISTING BUS STOP TO BE RELOCATED SIDEWALK CONNECTION. AS NEEDED TO PROVIDE A SEAMLESS TRANSITION NlD WTDRIM PAVEMENT WIDENING ACCORDING TO TRANSPORT REOUREMENTS. MATCH TO EXISTING j FROM EDGE OF BIKE LANE TO EXISTING (%ROUND. ADDITIONAL PAVEMENT REWIRED PROP BUS STOP BENCH RELOCATION CONTRACTOR TO CONTACT TRANSPORT PRIOR EDGE Of PAYING f GRADING SHALL ENSURE PERPEIUARON CONTRACTOR TO COORDINATE EXACT TO STARTING CONSTUCTION TO COORDINATE. OF AINAGE FLOW OFF STREET. FOR THE INTERIM CONDITION LOCATION NTH TRANSPORT \ CROSS SLOPE = zox DmwkW d Retard TInr4 DrexEO d Ilxrud Nm ban Frpree Wee m v.ryd� abeYae Arm fdmwdr teas Tu.eryN, e.� Ap�0, r, Y nY r�por@L tr h emeeey d e,.4r-bunt a q WerYn IMideJ Iw•M. TM Eba tiw ben mlrwd 1y h C4 dFvXCdhtrmnp mry. TN4 mM tenet e,4ly rWpa , byh nMwlW EWalaaax h Oq 6W,.., hC4 dram Ca tramrecy a+ecar,xdaxdhta ah nNwda�riot prdftftW.ftpaWh r.qWTMnlwtlm.mIng.. gaNa amparca dM1W W rynnWRy 1rh Ogdfas Catrr tr dlna.l4rur. dlYs rl,ar,n hl a9 Y rWIYM daTAr h miW,wMn Ora City of Fort CoWna, Colorado UTHITY PLAN Approval APPROVED: DATE_ CRy Engin� 01EOND BY: DAIS: WPta/W.t.ta UtEKy CHECKED BY: Wmxx n y DAR:.- q cmo BY: DALE:_ �mREFnq ,Ti w STORY \\ 1 -� ,I •\ 1 '\ 1SCAM V-W LINE B i -STORY ' \ \ l \ NOTE LINE E I STORY- \ I STORY 5' TYPE\R' WEET` L SEE DETAIL SHEETS FOR ADDITIONAL \STORM • \ OUTLET STRUCTURE LINE 8 LINE B STA: 10+42.16 INFORMATION. tI PIPE ENO I STA: 10+43.85 STORY PWE ENO STORM N: 1458079.37 STA: 10400 %lNE F \ N: 1458074.75I NE F STA: 9+97.45 I NE F E: 3123626.44 N: 141M1067.00 I I E: TAL SHEET �, '� F. 312357&2i y SEE DETAIL SHEET - N: 1458079.28 -_ _ - �1 I I \ l� E: 312351D.2B LINERE \ 0+4 16 _ r -- ---� -- • 1 (SINE \ — - --- _ *3. �fTl _ _ ._= 9 .45 \, ml Ise 0t \W STORM LINE C 5' TYPE'R' INLET \ / \ E: 3123593.04 \\ STORM LINE C AV \`� STORM LINE C A / '\ LINCOLN \ \ \ AVE. — - — — — — — MODIFIED 10' THE R MALT \ STA: 10t05.17 INSTALL W EXISTING 2-I5' STORM STORM LINE D STORM LINE E STORM LINE F HORL SCALE 1--20' -VERT. SCALE 1"-W 4%0 o 4960 ri a 49SS -- 4955 m^. �� t3 +�^a 4950 a ' 4950 _ rc1z PROPOSED GRADE 4945 4945 26.0 16• 4940 494_0- I ` J ElOS1W0 GROUND 4935 _ 62 _ _ -- 4935 4930 4930 4925 4M 4920 49W 491S - - 4915 HORL SCALE 1'-20' _ VERL SCALE 1'-5' w I 4960 _ _ a �.6 1 49SS 49 S 49SO $ 4 -_ tm s _ go _ 4 EIOSIINC «tOLIHD 4945 _ -- — _ _S - 4W 4935 — 4935_ _17 Y 43.g5 F. Lg6!'4 w>Y 4930 4930 4925 4935 49,20 4M 4915 — - _ _ — 4915 HORL SCALE I'-20' VERT. SCALE 1'=5' 4960 4960 49SS 495S i R 4950 49SO +am$ a z--._ . rc 4 - - _ PROPOSED a _ _.. 4945 -- GRADE — - F 4940 — 3. ex C 4935 1n' RcP J - - - - 4935 - STING GROUND 4930 4930 AIM _--- _ 4935 4=1 -- - 4920_ 4915 -- -- - _ 4915 DnrYW d Rsmld de.W iaw Frmb IN 9�w1bs AFa Fk. r�.ym�lY��Ma 4®q d4M i:l.ta aVs� vw7 s4am.dm lIw4 PI'm mw Oau.rwy.me ky C .AGgiygma d fan Cdnb mop - - eee, raW Emewq 4WayRy+oa wa Cq rgoar. ar tAa qd im CaMn b rnaa9 uE conanmTu d.M1e cLcW�:n... 7vYrwe A rm�w Lem as .a4aRea Tn« r.na.. wx�.xaaa.m.ci, d nnu apranre a buru''We'm^i9 hm. Clq Tan Cm b .eada�d q..,wu.,4 mm, w-n ua �sy r r.gw,r n.r♦ �ti eaa,m.. City of Fort Collins, Colorado UTILITY PLAN Appro4al ARPROVELI C i'.ED 61 DATE vaI«/Ymnle.aia. UR+y wEceED R+ s17,14il'DATE.Q'�1�9 m CNELnED Br.. Ift TF, DALE: IDm 10+40 104610 I 10+00 10+40 10#w I 10400 IOHO 10480 I J 0 z r,T i za of Tb1 N r a602OJ P O � a a z u P w g z s z a W � r <$ toa 0Ury L) ■ 0 r zt LL W W m pJ V7 u Z :3 Z 0 IL o U U LA � O O LL i/f SHEcI 13 EM 18 m 4945 4940 4935 4930 4925 i ■7— . _---------------------FF I ---------JUF ------------------------------ �44+27.50 14+00 13+00 12+00 Sol . . . m at �m - - - -- - - - -------------- - - - E1 STORM LINE A ' - I I TYPE '13' METI I STA: 14+21.50 I N: 149264.55 I E: 3123263.64 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I TYPE 'Ir INLET STA: 13+47.90 N: 1458284.56 E: 3123353.23 TYPE 13 INLET E: 312352 9.25 STA: 12+66.90 STORM LINE E N: 1458284.56 E: 3123444.23 TYPE -13 INLET / STA: 11+65.90—/ N: 145R284.56 E: 3123525.23 PIPE END TRENCH IMNN STA: I0+00 N: 1458132.72 E: 312359.25 JAM AN wiE�i� ■ ■ ■ Inr I 1 1 1 I 1 I 1 I ■ I■ � � ■ I 1 � � I ■ � NORZ. SOME C-20' PERT. SCALE 1*-S' o 4%0 4"S 1 4950 4945 4M 4935 15' 1 4930 _ 4925 4920 4915 DmW1p d R.d TYsw O^r'Y'O d Pemrd Yvw loam Pend Ywd m �wI dm aboh�tl han Ehmrb lyd EwrryYiL Apv �� Y nev r�p..YY b w.w...y dw.ar v 4erp vey dw�.4m TYN4rlen ra Yer rwewrMwCq dfon Cean bawap aeb. TM re.Y.4e.mYSMrws.a4Mwr.�Ywa dyvammi wCq Fgrr.swClgdran Ceasbemray wd wrarnnadw obitlm. FMaws�w..�s.4e rtir vv yunm dw dwmw�ww•d��r rpwea Ine rave. mY eatM ®,.dYNyrYNe� aaywrr dsaa+a q..ory y wcpd am Cnia b .Arla.a w+^�• d e.sale.e ar. Aar ee.4.r.ee.q w (ANY of Fort Colllos, Colorado UTILITY PLAN Approval tsnooYfn!^e5�� oA1e.j� C .♦ aEG%FD Br. � uAR Walm/.osieaals UNily � ��� p �'J r CHECKED or. % DATE:. -_ — — — — _ — — — — — MOOIRED 10' TYPE R INLE STA 1040 N: 14550620 E: 31236226 INSTALL ON EXISTING 2-15' STORi QEXIST NWCWD-, WATERLINE -s--a5 N: 1459326.96 E: 3123602.49 CONTRACTOR SHALL GRADE CHANNEL CHANNEL AS NEEDED TO MATCH TO EXISTING 2• BLOEBOARD INSIAATION TO BE INSTALLED ALONG STORM LINE B WTIERE CLEARANCE BETWEEN STORM LINE AND EXIST NWCWD WATERLINE IS LESS THAN 3D' 4955 4950 STORM LWE 0 / / / / I I / STORM LINE F INKIMIL 8• RCP _._IB_RCY _ STORM - - --- I LINE D' I I 18' RCP I I STORM LINE A STORY MF B 71M.3464 18• RCP I STA: , N: 14581903 I E: 3123606.40 STORM I I LINE C ]0 RCP I STORM LINE B HOR2. SCALE 1'-20' VERT. SCALE V-S' J _ N 4960 03 n ao 49SS A� ink g + SIBES-0F _.' F AS IWiE D BY GTY INCPF!'.LM ' t2 Er. EXIST 4930 4925 4920I t 1I1I1`_ - -- -- PROPOSED GRADE 4W . 134.81.i. H 1.3230 _- 4935 I MIN O0RCA- FLOVE LL TO 5' BC TH SIDES OF E ISTING WATERLINE OR A DBTEC BY NWO INSPECTO 4930 _. EXIST HCWCDSTORM JQWTS WA- LINE 10' EITHER SIDE OF WA LINE WITH Ei-WRAP TYL EXTERI MNT WR _-.4M LLI Q J 0 Z J MY 0 20 NOTE: L SEE DETAIL SHEETS FOR ADDITIONAL NF0i, lATk N DmwUwdReo d T1wa D...rep d IVrud I.w t Pma.a Baal m vw7 d•n aMaYW Awe Eb�wnb Lad lan'eYlaL AWa C�waYa Y mt rapv�Na b /a v�1 ddw aHeilt a da1P erny YXvnvlm Mdad w.w TAaalyna AM Maa rMwC b W Cq dive Cabo b aary aay. lb aals is Ys ieWy ^+a+14 4.aa mt.q 1prvree W Cq Tnleeay. s W Cgdba Cale b aavaq W eaera.aaa ae«e aloiNaN. f..d..awA lw.ew.w Jeum avWly'tls. Me auannoea ddN Yaiw an W oba dada Nd 4adua repare6 TM renew dal maNmwmltlwmy.vWna gwnce d Man.W napwti4ey b1 Ue Clry a fen [nM. h .m«ow gwMY.,.a arm.Mwa.w ++r ee.eaw.e � da .maysum yNu. City of Fort Collin; Colorado UTILITY PLAN Approval APPRpEp.-!,�� DAiF. 044j! L w �Yoler/N'allewler uNtly `,l o OeOED 9Y. -AS DAi CHEOQO BY.------ a- _ DATE: J No Text