Loading...
HomeMy WebLinkAboutSite Certifications - 08/08/2016 (3)Project Name: Foothills Mall Redevelopment (Partial As -built) Date: June 29, 2016 Building Permit Numbers: Block 1E/F - Permit B1413235 (Commercial or multi -family) L.3,�d- Li Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi -Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as -built grading plan. (As -built elevations must be written in red next to the approved elevations.) • Use "Yes" for items completed as described. • Use "N/A" for items that are not applicable to the site being certified. • If any blanks are "No," attach an explanation referencing the item number below. Attach an explanation or description of the as -built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as -built redline or Mylar drawing with the following: I. Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: Note: This will be addressed at project completion. A. Volume: N/A As -built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. N/A Detention basin topography was prepared by a professional land surveyor registered in the state of Colorado. 2. N/A Both proposed and as -built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as -built). 3. N/A All critical spot elevations as shown on the approved construction plans have been verified and the as -built elevations are shown on the plan sheet. 4. N/A Stage -storage -discharge tables are provided on a separate document. 5. N/A Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinvurl.com/COCompliancePortal) for approval. Uploaded documents must include: a. The cover sheet from the approved drainage report b. The stamped certification page from the approved drainage report c. As -built topographic survey d. Stamped certification page from the Overall Site & Drainage Certification e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet ii' IR Page 1 B. Water Quality and Quantity Detention Basin Grading: NIA Attached is as -built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a "soft pan" in the flow -line, all areas still must meet the minimum 2% grade requirement. 1. Low Flow: Choose one of the following detention basin low flow options as applicable: a. N/A Turf Swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as -built grade is b. NIA Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as -built spot elevations.) c. N/A Soft pan for low flow in detention basin. • Verify and document the soft pan material gradation, trench width and depth -to be verified during construction by engineer. Picture documentation is preferred or engineer's statement of visual inspection and compliance. (Choose one below.) o There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 2. Side Slopes: NIA The as -built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3. Spillway Certification: The following items must be field verified: a. NIA The location of the spillway is indicated on the as -built plan. b. N/A The width of the spillway is indicated on the as -built plan. C. N/A The elevations) of the spillway is shown on the as -built plan. d. NIA A concrete ribbon defines the location and grade of the spillway. e. N/A There is downstream scour protection in the spillway as per the construction plans. Indicate type: riprap with (riprap size "D50" gradation and bedding type, geotextile, buried inches of bury, etc.). NIA There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. 12/15 Page 2 4. Outlet Structure Certification a. N/A The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. NIA The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. C. N/A The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. N/A The well screen is the correct material and is installed as shown on the construction plans. e. NIA 100-year overflow grate elevation is . (Elev. A on detail D-46) f. NIA The top elevation of the water quality capture volume is (Elev. B on detail D-46) g. N/A Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. N/A The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. Ill. Channels/swales - FCSCM Vol.1, Ch.7, Sect.3&4 Note: This will be addressed at project cnmpletion. General compliance in Block 1E/F area. A. Capacity: NIA The as -built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. N/A All swales are located within the drainage easements as shown on the construction plans. 2. N/A Longitudinal slopes and side -slopes (cross -sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side -slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. N/A As -built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. N/A All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. N/A All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. NIA The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross -sections as on the construction plan set or attached as separate documentation.) 7. N/A The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 12/15 Page 3 III. Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: The as -built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. Note: Storm sewer is private: As-builts will be sent to design engineer for review. 1. All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. Note: This will be addressed at project completionGeneral compliai ock 1 E/F area. 2. The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. Note: As-builts will be sent to design engineer for review. 3. The as -built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. Note: Invert elevations are shown on attached sheet. Invert elevations will be shown on plan and profile sheets at project completion. B. Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the approved construction plans. Note: Storm sewer is private, backfill was observed and tested by - (continued below) 1. The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2. All encasements and clearances as specified on the approved construction plans have been met. 3. Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) Ground Engineering. Reports sent to City and design engineer for review. IV. Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 No:e: This will be at project completion. General compliance in Block 1 E/F area. A. Construction/Installation: N/A All concrete pans have been constructed in accordance with the approved construction plans. 1. N/A The concrete pans are the correct size/width as shown on the approved construction plans. 2. N/A The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3. N/A The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is "V" shaped and meets the side slope shown on the detail.) 4, N/A The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5. N/A The spot elevations shown on the concrete pan(s) have been verified and are shown on the as - built drawings. 12/15 Page 4 V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: All storm drain inlets have been constructed in accordance with the approved construction plans. Note: This will be addressed at project completion. Installation was observed and tested by Ground Engineering. Reports sent to City for review 1. The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing "Verified" on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, provide the name and source of the detail with justification for equal or better capacity. 2. The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4. The as -built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5. The as -built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6. All inlet covers are stenciled or stamped with the following designation: NO DUMPING — DRAINS TO POUDRE RIVER. VI. Culverts - FCSCM Vol.2, Ch.9 - This will be addressed at project completion. (see attachment A for area where this document applies) A. Construction/Installation: N/A All culverts have been constructed and/or installed in accordance with the approved construction plans. 1. N/A All culvert sizes have been verified as indicated on the as -built construction plans as correct. 2, N/A The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as -built plans. 3. N/A The as -built invert "in and out' elevations have been verified and are indicated on the as -built construction plans. 4. N/A The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as -built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII. Sub -Drains Note: Storm sewer is private. Installation of sub -drains were observed by Ground Engineering. Reports sent to City for review. A. Construction/Installation: N/A All sub -drains shown on the construction plans have been installed in accordance with those plans. Sub -drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub -drains installed after the plans were approved on the as -built plans.) 1. N/A The size of the sub -drains are as approved on the construction plans and are indicated on the as - built plans. 2. N/A The type of sub -drain, in particular the perforated and non -perforated sections of the drain, are as indicated on the approved construction plans. 12/15 Page 5 3. N/A The cover requirements per the construction plans are provided. 4. N/A The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5. N/A The backfill materials for sub -drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6. N/A The geo-textile liner completely wraps the sub -drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub -drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) Vill. Curb Cuts Th A. Construction: N/A All curb cut openings are constructed in accordance with the approved construction plans. 1. N/A The size (width) of the curb cut opening is as shown on the approved construction plans. 2. N/A The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX. Sidewalk Culverts & Chases A. Construction/Installation: N/A All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1. N/A The size (width and length) of the culverts are as shown on the approved construction plans. 2. N/A The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City's detail. 3. N/A The sidewalk culvert invert "in and out" elevations have been verified and are indicated on the as -built plans. 4. NIA The sidewalk culvert opening is as shown on the approved construction plans or per the City's detail. 5. N/A There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: N/A All common open spaces have been graded in accordance with the approved construction plans. 1. NIA The grading on all common open spaces bordering private lots has been verified as correct and the as -built rear lot corner elevations have been shown on the as -built plans. 12/15 Page 6 2. N/A The as -built contours for "overlot grading' are shown on the as -built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3. N/A All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3 A. Construction: N/A All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7 Nl ­'e Thi- J1' I, al i o,ac completinn_ A. Construction: N/A All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1. N/A All fabric was installed per the details on the approved construction plans. XIII. Post -Construction Site Cleanup - FCSCM Vol.3, Ch.7 �1F)'-Ic E1 p,-jfEC1 COITI p;z'.tlbn r�dnc'l �ii cOnlr%lnllCe Ill L-'•Oc� A. Construction: All construction debris and obstructions of any kind have been removed from drainage paths. 1. All construction debris has been removed except in staging area(s). 2. All ruts have been smoothed out in all construction areas. 3. All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 PJo:e: This e^dill be clone at project com�l a�r� A. N/A The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV. Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 Note: This will be i�- E;T, I,;eje,;t comp,eV1on A. N/A Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. 12/15 Page 7 XVI. Certification and Erosion Control Measures Nnte: This %,.::I I,e A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing this certification there are any erosion control measures still remaining on the site, please note them in the narrative and verify that they need to remain at this time. If in doubt as to the need for any control measure, please consult with the Erosion Control Inspector at 970-221-6700. XVIL Statement of Compliance A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has visited and observed the site, and to the best of his/her knowledge, the as -built conditions of the drainage facilities are as described in the above form and in the enclosed as -built plans. B. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. XVIII. Signature and Stamp by a Colorado -Registered Professional Engineer Engineer's contact information: Name: Kenneth W. Curfman R EG�sr . C ' Email: kcurfman@flatironsinc.com 6 Phone: 970-443-7001, ext. 184�,?����J� 2` Company: Flatirons, Inc. o ........* ca FANDP� Address: 655 Fourth Avenue Longmont, CO 80503 PE Stamp Sign and date Fort Collins Utilities 12/15 Page 8 I M L, / A- L! LJ 1 BLOCK 1 A BLOCK � ,1J ,� J ,✓ BLOCK �\ 1H BLOCK Block 1 E/F Permit B1413235 J ' 1 E �.,. �• ^BLOCK BLOCK Z4\ Block 7 Theater PermitB1402403 G e III.A: Storm Pipes Pipe Slopes (As -built and comparison to Design) Inlet # to Inlet # Design Slope As -built Slope 545D-545C 2.82% 4.73% 545C-545B 2.82% 2.78% 54513-545A 2.82% 2.15% 550-549 0.70% 0.91% 549=548 0.70% 0.56% 548-545 0.70% 0.75% 563J-563H 1.00% 1.46% 547D-547C 1.00% 0.64% 5476-547A 3.17% 4.46% Invert Elevations (As -built and comparison to Design) Inlet # Invert Location Design Elevation As -built Elevation 545D NE 5015.55' 5016.05' 545C SW & NE 5014.87' 5014.89' 545B SW & NE 5014.20' 5014.23' 545A SW & NE 5013.52' 5013.71' 547A NE & SW 5013.46' 5013.37' 545 NW & SE 5012.48' 5012.30' 547B NE & SW 5014.58' 5015.00, 547C NW & SE 5014.95' 5015.06' 547D SE 5015.25' 5015.25' 548 NW & SE 5012.90' 5012.75' 549 SE & NW 5013.11' 5012.92' 550 SE & NW 5013.32' 5013.19' 551A SW 5014.22' 5014.18' 552 N/A N/A N/A 553A NE 5014.77' 5014.79' 555A NE 5015.64' 5015.05, 563H W & SE 5013.71' 5013.66' 563J W & E 5014.14' 5014.28' V.A: Storm Drain Inlets Grate Elevations (As -built and comparison to Design) Grate # Design Elevation As -built Elevation 545D 5019.53' 5019.42' 545C 5019.53' 5019.47' 545E 5019.53' 5019.49' 545A 5019.53' 5019.56' 545 5019.40' 5019.40' 547A 5019.30' 5019.37' 547E 5019.25' 5019.24' 547C 5019.25' 5019.28' 547D 5019.25' 5019.28' 548 5019.35' 5019.35' 549 5019.45' 5019.46' 550 5019.45' 5019.47' 551A 5019.30' 5019.36' 553A 5019.65' 5019.69' 555A 5021.05' 5021.02' 563H 5019.25' 5019.22' 563J 5019.25' 5019.32' AS -BUILT EXHIBIT - 4� BLOCK 1E/F I I I I I I r----� A PORTION OF FOOTHILLS REDEVELOPMENT, � LOCATED IN THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE SIN P.M, 1 CITY, OF FORT COLLINS, COUNTY OF LARIMER,, -� MM EFEvmmmw r --- I i I STATE OF COLORADO lml.ffi I TfDIW Haul aw rt _ _ _ _ Notes f / EOL O ECC I IT xv WL (E): 5011.79' 1. THIS IT WAS PREPARED MNOUT TIE lm1.IUT I V V V V' BENEFITT OFOF A CURRENT TITLE COMMITMENT AND TImIW SSI.]Y I ES NOT CONSMIJTE A MlE SEARCH BY FLATIRONS, INC. TO DETERMINE TIME OR EaC lmwM I 'Alp.)Y 'AIp.M' smg.)5' NOT PURPORT M REFLECT ANY OF THE Ma I EOC w ODIC sm°EO�C >m�weg' Epl [U EASEMENTS OF RECORD. THIS EXHIBIT DOES Mu"N =m Zf \ FOLLOWING WHICH MAY BE APPUCASLE TO ME mNC CwC ?� MAN POSSBIEEEASEMEN EASEMENTS, WNEE NSIBIE mI �, rt� n-n-n-n-n-rt lm4n' V V V V V V' AT ME TIME OF MAKING THIS EXHIBIT; MMM MAN 4 n Ea EM BUILDING SETBACK ONES; RESTRICTIVE R sOm.R 0.�MawI}n n�51ow1 w xx w EM Ea COVENANTS; SUBDIVISION RESTRICTIONS: ZONING am. OR Eat Ea: MWI H mw c 1 0. A18A wAcu�il ssIA OTHER FACTS THAT EAN AGCCURFEjES;µAONO ANY !m I CURRENT TITLE SEARCH MAY DISCLOSE. MFA MAN Mij N121.m' 3alapW 5mp.)T I G MM �` =am S�1O' 2. ACCORDING TO COLORADO LAW, YOU MUST lm1.3Y TIEnDI mw lm1.2!' sN4m DOG �p1am' Y wv TUT (STVM lOIaIC �y-mpiN lm1.ffi COMMENCE ANY LEGAL ACTION BASED UPON 11 EOC O]XL EDC SmpM' IR NDI MAN ovc 1 �' mxc1 ELMa I I M RU NNUIr °m°'!B Io-� � 1Y INV OUT (E} amaffi TNT DEFECT IN THIS EXHIBIT WITHIN THREE E+ !ls.m lml 101wpU ELM YEARS AFTER YOU FIRST DISCOVER SUCH 3 EKIC MC !mart IRMCH MAN I a Epp IN EVENT MAY ANY ACTION BASED 5ma1Y UPON W A ANY DEFECT IN THIS EXHIBIT BE R, 0.m I I EEpcaffi\ EC / COMMENCED MORE THAN HEN YEARS FROM THE g OF G sm �� 1pyp.�DATE OF ME ERTIFlCATICH SHOWN HEREON. I Tv \ }^ 3. THIS EXHIBIT WAS PREPARED FOR THE EXCLUSIVE USE OF HCBECK, LTG., NAMED IN G \ ( w i i ME STATEMENT HEREON. SAID STATEMENT Skl fA EoCp.ffi IEIN'l I I ,`lmI.1O� O H (\ I �'i / W�W�AN EXPREST EXTEND S STATEMENT ANY MBY ME PERSONED NMI.)T j 1 I >eP IMwI ) I ra pUEt 5ma5Y ( SURVEYOR NAMING SAID PERSON. M'jW It /� % Ea a W\_ 4. THIS EXHIBIT IS VAUD ONLY IF PRINT HAS AMAREA EIAYMAIN M)) I EGGI I \ / i ORIGINAL SEAL AND SIGNATURE OF SURVEYOR. lu I IIS MY N IN�YM'�% WULIV I \ / ! ' w � IV NV PUT 0 MIN' _ J I no, BA / lMpa S� aw S. NO UTILITIES OTHER THAN STORM SEWER ARE Sg41. FL IN M --J I I x� � TAE E4C \�ace'f5 SHOWN HEREON. NO RESEARCH HAS BEEN R EM EEOC G I YJ/ 1 % / ' yF DEPTH. GENI ITON, CAPACITY OR NING ME LOCATION OF \ a ANY UTILITY OR MUNICIPAL/PUBUC SERVICE I 1� �` HOE FACILITY. FOR INFORMATION REGARDING THESE 1_ • UTILITIES. PLEASE CONTACT ME APPROPRIATE R pplapw G e 11 % AISw pE.W ssm w AGENCIES. ALL UNDERGROUND UTILITIES MUST MI 32' awC W I 1 111 !m .2e' BE FIELD LOCATED BY THE APPROPRIATE r Eoc BUILDING IF Ggl sa4e•\A U _ �IY xv Wil 101iss' \ E%XCCA(VATION,CY OR UTUTY PURSUANNTTI TO C.R.SPANY IOREC ANY �Wmw BUILDING lE Lac-V 9-t5-103. Z£V Mao. QzUn MAN sw Ta 8. ME DISTANCE MEASUREMENTS SHOWN HEREON G MM EIEV 501g.4W ARE U.S. SURVEY FOOT. o�Ig lmgdY IS NV IN (NW: 5012YY ! AREA pi11N 5g➢1 mEDV - - - - - - - - - - - - - - - - - - -- _- _ _ _ _ _ _ _ _ _ _ EDc IT NV OUT (ME lmEm .I mM TSK Ma22' S Z. BENCHMARK INFORMATI)N: ELEVATIONS BASED ECC -1 'i 1S INV M (NI: W13.W' ON BENCHMARK 0-M2 FROM ME APPROVED a =affi TOP BINK ` �A IY NV OUT (s ): x13u' \ CONSTRUCTION PLANS, WITH A PUBLISHED tV V _ ff Ea h mo' c} a ELEVATION OF 5031.28 FEET (NGVD29 Ea: /'Lppm2Y el \ UNADJUSTED), BONG AN NGS BENCHMARK DISKO smg.gY IY 11 / TQ• BAw IT laro.W c STAMPED OD322 RESET 1971' LOCATED 5.4 KM y^ e n ^ n Ta ePM (MS (3.35 MI) SOUK ALONG U.S. HIGHWAY 287 lmg.sd I FROM ITS JUNCTION WIN STATE HIGHWAY 14 IN I I FORT GOWNS. IN ME NORTH END OF ME k�IIL H i I EAST CONCRETE HEADWALL OF AN 8-FOOT BY wam W e 4 n$ y U( II % I 1 1 I A14A !FLAN 547C T¢ 24-FOOi BOX CULVERT, 8.1 METERS (20.0 FT) a W 1 g EIEv smg2g' EAST OF ME CENTERUNE OF ME NORM II I B Epp I j I 1 Y INV IN (NW): MI&M' BOUND LANES OF ME HIGHWAY, AND 1.7 C II MawI • 1 I 1 It INV WT (%): M5.06' METERS (5.8 FT) SOON OF ME NORM END 6 n $ GRAPHIC SCALE II I nG I 1 ; ' 1 113' MA ONE HEADWALL. WA MARK IS ABOVE II I I I I Tm gulp LEVEL 'MN NE HIGHWAY. 1811 3mpY ' II 54pI I / I S WNP B. DATES OF FIELDWORK: JIVE, 2016. iuIt ^^ R sm°i c - �AFFA♦Ilgi 1\_/ Maw I I 9. BOUNDARY DETERMINATION IS NOT A PART O HiSR EDC II IS NV N (NWj Nn23' j / _ _ _ S NIS E%HIBIT. MIS IS NOT A 'LAND SURVEY 0i (NYE-) IT My PIT (5Ek !m2)T / PLAY OR IMPROVEMENT SURVEY PLAY AND n n 'A141T lce lg R NIA .Imt4r E, ) / �JmR]L -- - - � - fat III (O(SsyIFIN41T smaaR Ta: - _ --_-_ THIS EXHIBIT IS NOT INTENDED FOR PURPOSES IT MY IN lmp.lt IT My OUT (MX�IIIaOIs.e3' ww ao-e AREA CHµ 5Ia-A l010.MY I COX Frc \ ' ]------_ LAND AND THAT IT IOF TRANSFER OF TS NOT TOOR BBEVIRULED UPON R lmaM' - - N III EIEv: !maw III DEW Imp.% CVN G lml.m �'.1u FOR ME ESTABLISHMENT OF A F2NCE, BUILDING ppM IT MY IN (MIX Mm it A Oft !min' � Tap MAN OR OTHER FUTURE IMPROVEMENT ONES, AREA EPux 515_p IT RIV a) !mass Ir NV PIT tax lmin' RIII ELEY s0Ia4Y MQk M&M. Mast =am a 10. ME SITE WAS AN ACTIVE CONSTRUCTION STE WI.)Y IT INV TUT Ua): Sms.05' MO." M&W _-._ - EM =9or Ea WG n -` EOC EOC me G \ AT NE TIME O FIELDWORK. Emg.lY ECC lm0.m• $O14gT Sm0.0.1' smp.Ig' /f II FL me E!a Ea Ea / I I wpEIX 11e *� n / / `� \\ 11. ME HORIZONTAL LOCATIONS AND UNEWORK ttt x non IY / / \ \ SHOWN HEREON ARE FROM APPROVED `\ COiItBO !mass• MC°UAIC\ E�000.a 6 ( I \ I PROVTOEDCB�CUENTSAND000UNOTAREPRESENT Ea \i.' IT HOPE a a)a IT "WE a I= IT I6E a 21A 0I I ( I p L 1 lmEOg n n rt R� M&4Y H I I AS -MEASURED LOCATONS UNLESS NOTED. R \ eIp.IH, n n- sr-n ula" W "am gG Eac I pg,w M I I 12. NE PURPOSE O THIS EXHIBIT IB TO SHOW a lDIa1Y ImB.N•AIg.ISf lm0.M• I X IOIgEM EDC fOt CPI: Mic OMC ppa Ea1g.N' rQNL p]1' / WC ma / Ir WY q( !m SEWER AS -MEASURED SPOT ELEVATIONS AND STORM _ 1 smp.es' lmaY' our Y �N IY gYt pUT / SEWER AS -BUILT DATA IN NE AREA O BLOCK lmpMW gplp,WT Epp In IE/F OVERLAID ONTO ME PROPOSED CIVIL SITE EOC EOa EOC EM !m0.)4• 1901a1T, MTA MAN !4)A PLAN. Ip r••A 1 DEY. M1.3T Pl l Ng W ° Mnw)S FBIGI I ER IWIN IT MY IN (NO.33T Maw EOD G 1mI IT NV OUT (A'X W33T JOB NUMBER: sm4n' FIM Sbp.40' i I II v� 8WByors Statemmint 14-83,59E OA E: I, JgiN B. GUYION, A LAND SURVEYOR LICENSED IN NE STALE O 08-29-2018 R t NV art (sEX lm230' I I I I G COLORADO, HEREBY STAN FOt AND CH BEHALF Qi FLATIRONS, INC., DRAWN BY: 1 1 TO HCBECK, LIT.. THAT THIS AS -BUILT EXHIBIT WAS PREPARED BY B. OELKE 1 ME OR UNDER MY RESPONSBLE CHARGE NAT SAID EXHIBIT AND R I ME RELATIVE ELEVATIONS SHOWN HEREON ARE ACCURATE TO ME ugsmgm' I /^\\ L V 6 BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF. JK/KC ED BY. CHARIAAN t CEO COLORADO ONS. INC. #18406 SHEET 1 I)F 1