Loading...
HomeMy WebLinkAboutSite Certifications - 08/04/2006July 31, 2006 Project No. 1785-01-00 City of Fort Collins Stormwater Utility P.O. BOX 580 Ft. Collins, Colorado 80524 Attn: Mr. Jay Barber STORMWATER RECEIVED AUG 0 12006 CZHEA Re: First Free Will Baptist Church (320 W. Trilby Road); Fort Collins, Colorado Certification of Drainage Facilities Dear Jay, This letter serves as the final certification of drainage facilities for First Free Will Baptist Church according to the requirements of the development agreement for First Free Will Baptist Church and Larimer County Urban Area Street Standards (LCUASS) General Note 17 noted on Sheet 2 of the approved Final Utility Plans for First Free Will Baptist Church which states: 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. Shear Engineering Corporation has been involved throughout construction, has been involved in field design modifications, has coordinated as-builts and has documented all construction modifications. Based on our involvement during construction and review of the as -built field data provided by Frederick Land Surveying, Shear Engineering Corporation states that First Free Will Baptist Church sitework improvements have been completed in general conformance with the Final Utility Plans for First Free Will Baptist Church prepared by Shear Engineering Corporation; S.E.C. Project Number 1785-01-00; City of Fort Collins City Engineer approval date June 19, 2003. Finished grading has been completed in accordance with the approved MASTER GRADING PLAN PHASE 1 and with documented grading design revisions. All drainage facilities have been installed in general conformance with the approved Final Utility Plans and are functioning appropriately and generally meet the intent of the original drainage design for First Free Will Baptist Church in accordance with the approved Final Drainage and Erosion Control Report prepared by Shear Engineering Corporation; S.E.C. Project Number 1785-01-00. Documented finished elevations have been provided by Frederick Land Surveying and are represented on the attached mylar that can be used as an overlay on the original plan for immediate comparison -to design grades. A print is also attached for your files. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearenginecring.com PAGE 2 July 31, 2006 Project No. 1785-01-00 Re: First Free Will Baptist Church (320 W. Trilby Road); Fort Collins, Colorado Certification of Drainage Facilities Detention pond design volume requirements presented in the Final Drainage and Erosion Control Report for First Free Will Baptist Church were achieved. The Final Drainage and Erosion Control Report identified that the required volume for the 100-year storm (with a release rate per acre of 1.44 cfs) was 42,053 cubic feet (0.96 ac-ft) at an elevation of 5054.36 feet. Based on the survey data provided by Frederick Land Surveying, and generation of a new stage — storage curve for the actual finished detention pond grades, the required pond volume of 42,053 cubic feet (0.96 ac-ft) was achieved at elevation 5054.09 feet. A freeboard height of 1.41' is achieved. A copy of the stage -storage data for the existing pond is attached for immediate reference. The volume provided meets the design requirements for First Free Will Baptist Church according to the Final Drainage and Erosion Control Report for First Free Will Baptist Church which was prepared by Shear Engineering Corporation; Shear Project No. 1785-01-00. Digital pictures of the finished site are also attached for immediate reference. If you have questions concerning this final drainage certification for First Free Will Baptist Church, please call at (970) 226-5334. Shear Engineering Corporation BWS / brb attachments cc: Roger Raper; First Free Will Baptist Church Bryan Short; Frederick Land Surveying Project No.: 1785-01-00 Shear Engineering Corporation 08/01/2006 Designer: BRB First Free Will Baptist Church 05:32 AM Average End Area Method for determining Pond Volumes 100-yr Water Surface Elevation Pond Developed Detention Pond Criteria Store difference between developed and historic minor storms Larger storms to be stored until released by emergency overfl Invert 5051.97 ft First Even Contour 5052.00 ft Increment 1.00 ft Top Elevation 5055.50 ft Pond Developed Detentiol Volume Stage Elevation Area (VI) ft ft sf cf Cumulative Volume cf ac-ft Req'd Volume cf 0.00 5051.97 0 0 0 0.00 42053 0.03 5052.00 8278 124 1 124 0.00 1 42053 1.03 5053.00 26812 7870 11231 0.26 42053 2.03 5054.00 31466 14517 39103 0.90 42053 3.03 5055.00 35195 33330 72433 1.66 42053 3.53 5055.50 1 37016 1 18053 90485 2.08 42053 100-yr Required Volume 42053 cf Required WSEL 5054.09 ft Freeboard 1.41 ft Detention Pond certification (First Free Will Baptist) Brian 1w (D g oa N , M o ,6 0 o 0 U d C 1 ccO L aUs ' N o rn m 4-0 w N ` U- M " aD O U)LL a c O 4a a0 4.0 as 0 0 o ° �' 0 C) Z `: N e+ U C N O N d 0 m m a 5 � yb •rpv�.f - r w 1 y' � `'�'�'�A �\ .,. 1 a } .�`p, may, ' -•s _ _! , � 1{��y„� . � T ♦ by :1 11 ,r4 I � �.:' r � J.1 ..y t�/�> •� ..e S'�.."r,> > . ,r _ ♦ ��� d y a ��..r+d�.- r .. n�. t�rc':. .'S.a� ..i� '�7777 ,�'{�`i_ �.r J•�A-'-:.� t! � ��?16�,,:sS -r dub t � � � ' f �'� T��,r � ^: r .- � "'7 r.K'•_e jr � '- i - %r - o - I b' �' _�... '��•`' T- w 4L No Text .,� 4 ` N -ram � � ,; ti�!6_ ,.: _ ,:� ; �_. _ �� TJ�,1 _ y ��Y '� . • i � � �� i. - ._ .��!� . :i.� -;M9 'yy- _ , _ /. .- r l-� r _ _ d r ^�� ' I ... -' t ..�N � Y b. ... r r � "Ol Lal1w. �'M: 1. V��L n` 3 bl' F.V.-. Y.�._ 1 � > ft -. .' FF'_. ti.'k,.�� 7!'r� � �%,�„r' r„p. 'L'aylF .` 5 v.?i.L ..�� `� - t t < .i.,. 1h � � y��'�:?k �� -., n,.,rf'a"f.'r �r ec� Y+f�a "r -t+� y y T,.e � t ; r �. hS4 ,�/t �x-L`+w,p Jul �e���.%.u' k',0� Y { �1.. tin ;}�.r��++KC yv"... A s .V '.'. -...-x�. sr.:_-. i�.`".`5. Der ♦.r4 -S% i, .✓.� ,_�.tir.v. h� hC. _�. �. .... � r .. A. ZL M- �_.' . s�F t" ;- c � S�•. - x..r � ...car ._� � •a+r � , . <;" � !� v\+mow... y. r\.. ,� ,• � �{, �- 3 R RECEIVED � 0 12005 S.rmEY' SLY F r aw XN73,17 t F B9. OL'SL X IB4W x�'BB �qyp}nift XCBI]51 Xmli.% i+TX x�y �J(b)�.90" y � •ip4'N ��,"( ' c(-Mn M613gp4J yNgoo jJs Xn33]] UL Im m XN7166 9SLJ yp � gw4 6iB k CEI B NI%2 XA]I.24 30IB3 421 at IsIIIII Nui541 pp�p x®J3iz »• X� zJ alv yp ''�255�1 X%]e.ao X SS] 4pmn E.q8 S0pp XW2i] pp3q Xm Sv e6� B SIgGSL �(IN 50]E]5EL»1il52 X»�]1.55 XW5w 93 991, y, xU71,613�gyp8 3 54 X�OS]I Xt t �. X� p6 ]% °BLI .y �jy9`g� `"eFa4t ,Y�/WT�3Y,]�p x ]e g`�. ggg xwa�ie 8 Y "uN Bn Liu'^x ]B Rk y I&V t 3 xy� q m$ '{ y k N .JO Acres Na¢ ] z5u0 _aN y t 4 S 30w1 �� pp} s. SIB { O pylA e r 'F p BL'6 �( Xw ].le 8 XSCB13 si O 8 X'JLQ]IPB] X 1.99 8` � '0 oQ W1gOYYyu�� n 1 440' CB L.B] 'a "�� cf---- 1,l X,SCB.BN 70I pva LZ�fy� AmissQWE NO XA32 1 B BXM A I0�%»mZ�pfy Nof RBA 7.22 .� 330 9LYXIL B ,q��^ } ^ 9% 'ry_�y ow z ziirozKt,]r°w +c0 }"i XB00�,i.m �':c, x ioex " 0 L{� » I.IBO yMpB��a yv5' d wCISC� C fL J 4v C X ' R0 34 � y]f %CRN y X's7012 } ^ ON8 8' ' R'L EA , >BCb30 X4 x505B 96 p5pN0°i3.5ie I Ra, 3 e 33Y "30 z.n qa ]U 4 6 w TiU yEC %' B r' �" ] X50]Zll T 8$ t ¢e N4 me Gv';b 0 6R IBC cO zA It OEOCK % %RR33pp, 53305.. _Y� - X 50.24 Trilby Rood v" �•50e By sx'�'Zq �' z&15 40 q 9W S SS'3]'%- w zsOaeB' YLS Of SEMYWS 5WN IW q IM SwN 1/N XFWXSro0m w B 20314 X� .]5 } RRB gag g >jwnU1124 X8 C ap a a3a°� 25H M: X 3 y 9s, OB 430 w Saw 'gg +.g.w52 N6 IM RM 1 XROS.X 161.2 II(I KWWM