Loading...
HomeMy WebLinkAboutSite Certifications - 01/19/1994STEWART&kSSOCATES Consulting Engineers and Surveyors �o January 19, 1994 4" Mr. Glen Schlueter Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Glen: Re: Lots 2A and 2B,, Replat of the Replat of Lots 1 and 2, Evergreen Park, Third Filing The four buildings and parking lot have been constructed on these lots. The top of foundation plans are according to the approved overlot grading plan. The onsite grading is also completed, and there is good positive drainage away from the building as required and is generally in compliance with the grading plan. The asphalt parking lot is constructed and flows to the south. The inverted crown was not installed in the center of the parking lot. The south edge of the parking lot flows west to east to Sugarpine Street. The developer has agreed to place a concrete or asphalt curb along the south edge of the parking lot to eliminate runoff from flowing onto the property to the south. All runoff will then be directed to Sugarpine Street as originally designed. The gravel filter .at the existing curb chase on Sugarpine Street is no longer in place. The site is scheduled for sodding as soon as the weather permits; therefore, the chase is no longer required. If you have any questions or need any further information regarding this project, please let me know. Sincerely, Franklin D. Blake, P.E. Secretary/Treasurer jrr & L. James H. Stewart and Associates, Inc.. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382