Loading...
HomeMy WebLinkAboutLot Certifications - 06/13/1997iiN-; -97 1!:1.= AM FO M" TION FNGINEERIN" rA... NO. 1970663':500 FOUNDATION I1 Consulting ENGINEERING Engineers, Ltd. June 13, 1997 Commission No.: 1939-li-01-05 Thomas & Thomas 1205 LaPorte Avenue Fort Collins, Colorado 80521 RE: Lot 24 �_Fafrbrooke—Heigr-ts (2714 Rawahs Drive), Fort Collins, Colorado ------ Gentlemen: We have determined the relative elevations for the above referenced address. During our investigation, we measured the top of foundation, lowest opening, lot sides and corners, and the swales on either side of the lot. in our opinion, the alevaticns as measured are in substantial conformance with the grading plan completed by Northern Engineering Servii:e, Job No. 9537.00, dated April 2, 1996. However, the area on the east property line still had material which will need to be removed when weather conditions pe-Mir.. If you have any questions, please feel €re=. -to call Res tfu" n'lif€orfi F. HaTll, M.S. Environmental/Earth Sciences Specialist Revi Kevin ENGINEERS, LTD. CRH/jle 5110 Granite Street • Loveland, Colorado 80538 • (970) 663-0138 a Fax (970) 663-1660 515 Main Street, Suite C • Longmont. Colorado 80501 + (303) 702-0661 :"UN-13-97 F°I 11:16 AY FOUNDAT.IG1d_?i4GdIdERRI11' FA:: NO: 197066?;500 F, 3 / r f s r MOE R� 1 � T. . L.EV.- 16.6 is, MOE .0 ®... � APPRDX. •� T. F.E'L,EV. = MOE- 13.0 15.62 1 5.0 T.F.E..EV.= 14.7 4 � 16.8 t . 1UN-13-97 FRI i1 11, A4 FOUNDATION_iNGIEKIING FA`,' NC, 19706631600 SCALE : 1'%20' ELEVATMK3 3URVEYED 9-11-07 ��Cc B Borah Mq►k 18-a.Y o! Wgik) 11,14 of Walk) Nola: Thh pt an Isbutid en The b"I btwv.allon vvalabfc 31 the We of vrva'. REVISED GRADING PLAIN LOT 21, FAIPBRODIIE HEIGHTS P.MD. FORT COLLWSsCOLORADO CL71.1rulnAlrim k IM