HomeMy WebLinkAboutSite Certifications - 10/16/2005North Star
Ianaw design, inc.
October 16, 2005
Jay Barber
City of Fort Collins
700 Wood Street
Fort Collins, CO 80524
Fax:221-6619
Mr. Barber,
This letter and attached information is provided to certify that the Phase 1 (Lot 4)
drainage improvements at Eastgate P.U.D. Lots 4 and 5 described below have been
constructed in substantial conformance with the approved plans dated November 10,
2004. All elevation information is based on surveys completed by RJL Surveying
(10/12/05). A site visit was also completed on 10/13/05. This certification includes the
following improvements:
• The offsite pond was not certified.
• The Phase 1 (Lot 4) building finished floor is 0.02' above the design elevation.
• The Phase 1 building was constructed 3' closer to the northwest property line
(shown on the attached drawing), therefore the parking stalls against the building
are 20' deep rather than 17' deep.
• A concrete pan (shown on the attached drawing) was added along the northwest
property line to facilitate drainage on that side of the building
• Per a site visit, the metal sidewalk culverts have been constructed.
• The curbs on site appear to be in substantial conformance to the grading plan and
convey runoff to the off site pond or to Riverside Avenue.
• The landscape areas have been sodded or otherwise planted per the approved
plans.
In general, based on the site visit and the information provided by RJL Surveying, the
runoff from the site will be conveyed to an acceptable release point. The building
location as constructed was not verified to meet applicable setbacks. Please call me if
you have any questions or if&lo need any additional information.
REG
�e PP.•
� _ op. G� KRp��9�o�
cr
ici Kroet h, o • 06 : ��`
SRO N AU
700 Automation Drive, Unit I Windsor, Colorado 80550 � �L' �� S
970-686-6939 Phone 970-686-1 1 88 Fax otkax p09�'
ter\ +a
sb
.•/ �\ ��\\� FAy
ITS
Y METAL SDTE C" NNEL i RE
AT 1. SEE ME
i
a = AA
`-\\ \ \ •\ ` 1 IC
CL\KRi A 1
/ O~NL Cp1ERElE SIN
\ \
AV AT 5
MAX OFF
0 \
LOT p
IT
/• 4 ORAWACE / \ L
EASEMENT
\ NANDI
PARKING SIGN-
PROPOSEDK.4 em.mrvc
S noC iAL.AOENMM FF4r
COLKRT T 2A SLOPE NA A].12
-7L III IRS v
>ARO
Ti
----------------
t1 0
zIDS
Q
a
J
r-I —
W
II
n
� �
/ k WTTER w/
PAN. TN.
LOT 5
PROPOSED BUILDING
'FE-•5,0
`HANOCAP SIGN'
EMSI EDGE OF
PAVEMENT
07I1, EXISTING
owONEWAA:w.sl`SNom
®� • Y CONCRETE CHANNEL
A
\_ Ai 1.GR 4CK
OF \
\\\\\ Lori
i
�o
mm
Im
DO
09P?w
oo�
5-
d .� ^
0
{'SC
g3aaLL
20 10 O 20 40
SCALE: 1- . 20'
ApI'
a
�
o
'
0
w1
6
NOTES
1. ALJ SPOT ELEVATIONS
ARE FLOWLINE UNLESS NOTED OT ERVASE.
2. CURLLIB AND GUTTER ON
SITE IS VERTICAL WITH A V PAN.
O
ry
a
\
a
3. AL ON SITE STORM DRAINAGE FACILITIES SHALL BE MAINTAINED
N
II
BY THE PROJECT OMER
OR OVINER S ASSOCIATION. ALL STORM
\
S�
DRAINAGE FACILITIES WITHIN THE RI"t7 OF WAY SHALL Rr
a
MAINTAINED BY THE CITY
OF FORT' INS
LEGEND
1 HE
HIGH PONT
11 LP
LOW PONT
Fir
FINISHED FLOM
n
TOP OF FOUNDATION
ECP
EDGE OF PAVEMENT
--- -
-- EXISTING CONTOURS
"
- - ---MPID—
-- EXISTING INDEX CONTOURS
PROPOSED CONTOURS
49015
PROPOSED INDEX CONTOURS
----••---
PROPOSED P.GALINE
-- ----
PROPOSE: INFLOW CURB
PROPOSED :".';ALL C-aB
------ — — -- PROD^SEC : 'ONCRE F PAN
Z
PPODC•EJ DRAIN PIPE
Q
J
RII
PEC:q3 DRAWNG ULEVA"ON
fi
W v
Q
CC
cD
s�ppyy ~
FlCAT011
CENTER OF CORADO
GALL UTILITY Nfm1987
W
O
J
J
`r
9800-92
�'
CrLyt
z-eOsussz GIN ADVANCEyIX1E
YGII plGf GNAGR EXCAVATE
��A
IRE M NG 0-NDERLApMD
e' i
Q
City of Fort Co h, Colorado
UTILITY PLAN APPROVAL
APPROVED:_ _
CL Fn9Ina (I
CHECKED BA: _ SHEET
R
IW a WINSMIA, UIFir EPA
CHECK=,^, H•'.5m. .w U1LNX Del.
CHECKED By:-- a_
.: m.e1Kn Del.
CHECKED BY:____�_ 4 OF 6
T._ r.. a-9 ne and
CHECKED BY:_..____
Date