Loading...
HomeMy WebLinkAboutSite Certifications - 12/21/2001December 21, 2001 Mr. Jay Barber City of Fort Collins — Stormwater P.O. Box 580 Fort Collins, Colorado 80522 Re: Certification of Storm Sewer Revision 1 Dear Jay: J•R ENGINEERING A Subsidiary of Westrian /is4hPfh SfAA/ Facilities for Elizabeth Street Apartments — JR Engineering (JR) surveyed the existing storm sewer facilities for Elizabeth Street Apartments on December 5, 2001. In addition, the facilities were reviewed in the field by David Klockeman & David Holloway of JR, on December 12, 2001, and David Klockeman on December 21, 2001. As a result of this, we offer the following for your review and comment: 1. Inlet #5 was constructed in general conformance to the approved plans. 2. The pipe system from Inlet #5 to Inlet 91 was constructed in general conformance with the approved plans. 3. Inlet #1 was constructed in general compliance with the approved plans. 4. The pipe connecting Inlet #1 to the detention pond was constructed with a slope of 0.00% (flat). This system was re -run in StormCad using the as -built information and it was concluded that this system will not be negatively impacted. (See attached StormCad output.) 5. Inlet #2 and the pipe releasing into the proposed detention pond were constructed in general conformance with the approved plans 6. The buried riprap at the outlet of the detention pond was constructed in general conformance with the approved plans. 7. The buried riprap at the two pipe outlets which release into the proposed detention basin, were constructed in general conformance with the approved plans. 8. The retaining wall surrounding the detention pond was constructed in general 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w jrengineering.com Mr. Jay Barber December 21, 2001 Page 2 of 2 conformance with the approved plans except for the spillway over the outlet pipe. The spillway elevation was designed to 5039.80 and was constructed at 5039.75. This elevation is adequate to meet the design. (See Item 10.) 9. The water quality structure, orifice plate and outlet pipe were constructed in general conformance with the approved plans. 10. The detention pond volume was slightly lower than designed at the design 100-yr WSEL. The design volume for the 100-year event was 0.22 Ac-ft and the constructed volume is 0.19 Ac-ft. In order to meet the volume requirement, the water surface elevation for the 100-year event needs to increase to 5039.70. A 0.25 foot high concrete extension was added to the spillway to raise the spillway elevation from 5039.50 to 5039.75, which is 0.05 feet higher than required. With this correction, the detention pond will function in general conformance with the approved plans. 11. A 2-foot wide concrete trickle pan was constructed at the outlet of the detention pond to convey flows to the parking lot southeast of the proposed detention basin. This trickle pan was designed to have a slope of 1.0% and was constructed with a slope of 0.85%. This will have no negative impact on the system. (Updated FlowMaster calculations have been provided for reference). 12. All concrete chases have been constructed in general conformance with the approved plans. This letter certifies that the items listed above are in general conformance with the approved plans, except as noted. If you have any questions or comments, or need additional information, please do not hesitate to contact me at my office. Thank you. Sincerely, Prepared by: Cp David Half6way Design Engineer II For and on Behalf of JR Engineering Reviewed by: L W, Klocke Division Manager _ �� Proposed Detention Pond - Stage/Storage LOCATION: ELIZABETH STREET APARTMENTS PROJECT NO: 39212.02 COMPUTATIONS BY: B. Strand/D. Klockeman SUBMITTED BY: JR ENGINEERING DATE: 12/21/01 Invert- WQ WSEL- 100-yr WSEL- top of wall - V = 1/3 d (A + B + sgrt(A'B)) where V = volume between contours, ft' d = depth between contours, It A = surface area of contour DETENTION POND Stage (ft) Surface Area (fe) Incremental Storage (ac-ft) Total Storage (ac-ft) 5035.5 0 5036 1122 0.00 0.00 5037 2660 0.04 0.05 5038 4389 0.08 0.08 5039 4389 0.10 0.18 5039.4 4389 0.04 0.22 5040 4389 0.10 0.28 5041 4389 0.10 0.38 5041.9 4389 0.09 0.47 5042 4389 0.01 0.39 5043 4389 0.10 0.57 5043.15 4389 0.02 0.41 5044 4389 0.09 0.66 Invert- WQ WSEL- 100-yr WSEL- AS43UILT Stage (ft) Surface Area (fe) ncrementa Storage (ac-ft) Total Storage (ac-ft) 5035.35 0 5036 233 0.00 0.00 5037 1764 0.02 0.02 5038 3657 0.06 0.06 5039 4206 0.09 0.15 5039.7 4256 0.07 0.22 5040 4277 0.10 0.25 9212pond.xls 0 CO w E co 0 too 2 4) LO v to c 0 r 3U O (o CO CO CD rn rn rn rn.o ci O > E (O (NO N 7 m 0) 0) 0) O) N J mCl)m m o O O E co 0) n n c rn CO rn M d O (O (O N N cC) ; ; C) (o M C 0 w (o GO N N E CO rn (o IT M 0) 0i 0) E N N o (o V CO N N d> N (o O aU co a n n E o rn N rn m o r to (o to N N Cl) co m m > > y c O.— d W n N O N 0 O O v ? N R O CL U a v a 0 0 L 07 V O cr 0) rn n V ao rn co n co a m J O O V O N Mn O (0 M 0 a� O O 0 0 O O O O O O O O O U d c .00 EU Z U) 0 0 U U U U N N N N co 0 d d d d a c9 Z N 0 a�� w N y w -: o Z > o U,0a Z U w It E n o N (D m W m 0 a` 0 coco N N n C.) 0 U) O) O 0 O U D � J � I E H « va E (n N O G) Q d5 d m U) 9 L O y N a a N n N 0) O LLJ v � —d F 00 �0 N m 2 N a k Z z-o a wnv w o > Z'a 0 Z Z U K € +' > M 00 0 0 L in U-) ` O (D ti CO 00.0 rn �O� LU MMO U w` LO 0 MQ >>V-- a (DE 75CC�. CU � mQC�N 0 0 0 0 0 0 0 0 b O O O O O O O O O O O O O O d' M N O O 00 r 0 LOV- D � IT IT V- co cM M M eM COO N � O 0 CV � 00 t a � q O $ �O = O 0 O (0(D , EOM CO + cM cM - U (V .... 00 C O . . � Q r 1 -t L CO 2` Q y. �v J�(� + Q c (D `— Q C N JD0Jui m O! O 0 w`� + � z m �D Y N 0O O m` N N 00 +. cu Cl) 2 �j M + U) a 00 O��L J�fA +O MM� c �? a C 4) N L d O > >�- _ CO (CCO.. +-0 C U N E + « U? �+ E N CAM O N titi 00$ Q rn m O Z �� ! U I �� L v G O M ce) C6 N g o_� JCCf/) N Q O N N�M @ N o A` U C C O� CU � O Q-C N.N d00 JD0J() F- N o N m a x AS -BUILT OUTFALL SWALE Worksheet for Irregular Channel Project Description Project File x:\3920000.all\3921202\drainage\9212fm.fm2 Worksheet AS -BUILT OUTFALL SWALE Flow Element Irregular Channel Method Manning's Formula Solve For Water Elevation Input Data Channel Slope 0.008500 ft/ft Elevation range: 34.75 ft to 35.02 ft. Station (ft) Elevation (ft) Start Station 0.00 35.02 0.00 10.00 34.92 10.00 11.00 34.75 12.00 12.00 34.92 22.00 35.02 Discharge 0.53 cfs Results Wtd. Mannings Coefficient 0.033 Water Surface Elevation 34.99 ft Flow Area 0.87 ftz Wetted Perimeter 16.94 ft Top Width 16.91 ft Height 0.24 ft Critical Depth 34.96 ft Critical Slope 0.042948 ft/ft Velocity 0.61 ft/s Velocity Head 0.01 ft Specific Energy 35.00 ft Froude Number 0.47 Flow is subcritical. End Station 10.00 12.00 22.00 Roughness 0.035 0.016 0.035 12/13/01 09:41:02 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.15 Page 1 of 1 AS -BUILT OUTFALL SWALE Cross Section for Irregular Channel Project Description Project File x:\3920000.a11\3921202\drainage\9212fm.fm2 Worksheet AS -BUILT OUTFALL SWALE Flow Element Irregular Channel Method • Manning's Formula Solve For Water Elevation Section Data Wtd. Mannings Coefficient 0.033 Channel Slope 0.008500 ft/ft Water Surface Elevation 34.99 ft Discharge 0.53 cfs 35.0! 35.0 34.95 c «q 34.9 to ro W 34.85 34.8 34.75 L- 0.0 5.0 10.0 15.0 20.0 Station (ft) 25.0 12/13/01 FlowMaster v5.15 09:40:33 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 December 14, 2001 J•R ENGINEERING IA Subsidiary of Westrian Mr. Jay Barber D City of Fort Collins — Stormwater P.O. Box 580 Fort Collins, Colorado 80522 Re: Certification of Storm Sewer Facilities for Elizabeth Street Apartments Dear Jay: JR Engineering (JR) surveyed the existing storm sewer facilities for Elizabeth Street Apartments on December 5, 2001. In addition, the facilities were reviewed in the field by David Klockeman & David Holloway of JR, on December 12, 2001. As a result of this, we offer the following for your review and comment: Inlet #5 was constructed in general conformance to the approved plans. 2. The pipe system from Inlet #5 to Inlet #1 was constructed with different slopes than the approved plans. The upstream invert of this pipe system was constructed 0.29 feet lower than the design invert and now has a negative slope of 2.40% from the manhole back into Inlet #5. The storm sewer calculations were re -run using the as -built information and JR has concluded that this will not negatively affect the proposed storm system. Inlet #5 will surcharge 0.13 feet and will not contribute any flows on to Elizabeth St. (Updated StormCad calculations have been provided for reference). 3. Inlet #1 was constructed in general compliance with the approved plans. 4. The pipe connecting Inlet #1 to the detention pond was was constructed with a slope of 0.00% (flat). As stated above, this system was re -run in StormCad using the as -built information and it was concluded that this system will not be negatively impacted. 5. Inlet #2 and the pipe releasing into the proposed detention pond were constructed in general conformance with the approved plans 6. The buried riprap at the outlet of the detention pond was constructed in general conformance with the approved plans. 2620 Fast Prospect Road, Suite 190, Fort Collin, CO 80525 970-491-9888 • Fax: 970-491-9984 • w jrengineering.00m Mr. Jay Barber December 14, 2001 Page 2 of 2 7. The buried riprap at the two pipe outlets, which release into the proposed detention basin, were constructed in general conformance with the approved plans. 8. The retaining wall surrounding the detention pond was constructed in general conformance with the approved plans except for the spillway over the outlet pipe. The spillway elevation was designed to 5039.80 and was constructed 0.30 feet to low. This item will be corrected. (See Item 10.) 9. The water quality structure and outlet pipe were constructed in general conformance with the approved plans. The wrong size orifice plate was sent to the site. The correct size is on its way and will be installed within the next 10 days. 10. The detention pond volume was slightly lower than designed at the design 100-yr WSEL. The design volume for the 100-year event was 0.22 Ac-ft and the constructed volume is 0.19 Ac-ft. A 0.30 foot high steel plate will be added to the spillway to raise the spillway elevation from 5039.50 to 5039.80, which will become the new 100-year WSEL and raise the volume from 0.19 Ac-ft to 0.22 Ac-ft. With this correction, the detention pond will function in general conformance with the approved plans. This work will be done within the next 10 days. 11. A 2-foot wide concrete trickle pan was constructed at the outlet of the detention pond to convey flows to the parking lot southeast of the proposed detention basin. This trickle pan was designed to have a slope of 1.0% and was constructed with a slope of 0.85%. This will have no negative impact on the system. (Updated FlowMaster calculations have been provided for reference). 12. All concrete chases have been constructed in general conformance with the approved plans. This letter certifies that the items listed above are in general conformance with the approved plans, except as noted. If you have any questions or comments, or need additional information, please do not hesitate to contact me at my office. Thank you. Sincerely, PrepareWbj: David Holloway Design Engineer II For and on Behalf of JR Engineering Reviewed by: o�Q�:K�:cs?F71 IQP Ui 29110 David W. Klockem��.• ,•'�4 Division Manager �S�•••NAL- G� `r�ONALE� Proposed Detention Pond - Stage/Storage LOCATION: ELIZABETH STREET APARTMENTS PROJECT NO: 39212.02 COMPUTATIONS BY: B. Strand/D. Mockeman SUBMITTED BY: JR ENGINEERING DATE: 7/10/01 C Invert- WQ WSEL- 100-yr WSEL- top of wall - V = 1 /3 d (A + B + sgrt(A'B)) where V = volume between contours, ft' d = depth between contours, It A = surface area of contour POND NAME Stage (ft) Surface Area (ft) Incremental Storage (ac-ft) Total Storage (ac-ft) 5035.5 0 5036 1122 0.00 0.00 5037 2660 0.04 0.05 5038 4389 0.08 0.08 5039 4389 0.10 0.18 5039.4 4389 0.04 0.22 5040 4389 0.10 0.28 5041 4389 0.10 0.38 5041.9 4389 0.09 0.47 5042 4389 0.01 0.39 5043 4389 0.10 0.57 5043.15 4389 0.02 0.41 5 444 4389 0.09 0.66 Invert- WQ WSEL- 100-yr WSEL- AS-BUILT Stage (ft) Surface Area (ft) ncrementa Storage (ac-ft) Total Storage (ac-ft) 5035.35 0 5036 233 0.00 0.00 5037 1764 0.02 0.02 5038 3657 0.06 0.06 5039 4206 0.09 0.15 5039.7 4255 0.07 0.22 5040 4277 0.10 0.25 9212pond.xls L �cococo y O O (0 �(U fox 3U 0 rn rn rn 0 U N O (D O E w m n c m M O) m O) N J M M M M '6 L 3=v 0 0 v rn n n E o M rn rn CO r (o (ri a)� m M Cl) M Cl) C > > C O W M w N N Co. I- (0 ? E 0) 0) O) 01 O J Cl) co Cl) M _ v q) _ d U) N O M E co w N w m" �LOM >� O QU �' o a n n w O) N O) E co (o to m m 2 M M M Cl) d C > > N > � N O.— � W N 01 N O U y O O O O a U O N V O t9 v O O O O O V V V (0 m N N N (O N N L o U U _N w M V V m^ O) w t— (0 N J CD w m IT o o ° o 2 00 o y IT M o N O O O O O O O O O O O O N � � N C n 0 EU O ID Zy C O N L L L L N h U U U U cn (U a ddcLd UW Z o a- W w rn Z > a a � Z U w of E N (U T C W ii N O a` E (D t0 (D n ci O N W 7 C 0 cu A> W LU O O O O O O O O O O O O O O O O O O O O O O cM N r- 0 O 06 I�: CO L6 d' J M CM Q Co. E(n 'M ti Cfl �.Q rv, PA ^r W O i - V y+ ^ Q � — co J�co J wu) •H O NT 00 O COCM� U C)a> p > C C . . + N C QC N J J ::)�Cn 00 C� M co (0McM� U + r (v ....00 C -j-tco a> p �(D QC NN JZ)0J(o CN + r O O O U) Nam$ O qql O MLO C) U O cr) �a) (L)..O > L �^' 'O/� (0 0) A C)J�0Jfn QC N —per O ti/�� I/`/� V!VV U p MM0000 C C) �-t-t(o00 C)..>>LT- + C)C W C 5). . N \Ca QC N JZ)OJ(n E L AS -BUILT OUTFALL SWALE Worksheet for Irregular Channel Project Description Project File x:\3920000.all\3921202\drainage\9212fm.fm2 Worksheet AS -BUILT OUTFALL SWALE Flow Element Irregular Channel Method Manning's Formula Solve For Water Elevation Input Data Channel Slope 0.008500 ft/ft Elevation range: 34.75 ft to 35.02 ft. Station (ft) Elevation (ft) Start Station End Station Roughness 0.00 35.02 0.00 10.00 0.035 10.00 34.92 10.00 12.00 0.016 11.00 34.75 12.00 22.00 0.035 12.00 34.92 22.00 35.02 Discharge 0.53 cfs Results Md. Mannings Coefficient 0.033 Water Surface Elevation 34.99 ft Flow Area 0.87 ftz Wetted Perimeter 16.94 ft Top Width 16.91 ft Height 0.24 ft Critical Depth 34.96 ft Critical Slope 0.042948 ft/ft Velocity 0.61 ft/s Velocity Head 0.01 ft Specific Energy 35.00 ft Froude Number 0.47 Flow is subcritical. 12/13/01 FlowMaster v5.15 09:41:02 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 AS -BUILT OUTFALL SWALE Cross Section for Irregular Channel Project Description Project File x:\3920000.all\3921202\drainage\9212fm.fm2 Worksheet AS -BUILT OUTFALL SWALE Flow Element Irregular Channel Method Manning's Formula Solve For Water Elevation Section Data Wtd. Mannings Coefficient 0.033 Channel Slope 0.008500 ft/ft Water Surface Elevation 34.99 ft Discharge 0.53 cfs 35.0E 35. C 34.95 c a 34.9 y W 34.85 34.8 34.75 t- 0.0 5.0 10.0 15.0 20.0 Station (ft) 25.0 12/13/01 FlowMaster v5.15 09:40:33 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 December 4, 2001 Mr. JD Thompson Simpson Housing Solutions, LLC 320 Golden Shore, Suite 200 Long Beach, CA 90802-4217 Re: Construction Materials Compliance Summary Elizabeth Street Senior Apartments 1508 West Elizabeth Street Fort Collins, Colorado Project No. 20011139 Dear Mr. Thompson: Soil/Earthwork Irerracon 301 N. Howes - P.O. Box 503 Fort Collins, Colorado 80521-0503 (970) 484-0359 Fax: (970) 484-0454 At your request, we'reviewed the compliance of the earthwork materials placed and monitored on the building pad and site paving areas by Terracon on an "as-called/part-time" basis. Our services on the project building have included performing laboratory testing of the soils for suitability to the project specifications and the Geotechnical Engineering Report recommendations (20995122) performed by Terracon (dated July 30, 1999). Terracon also performed in -place field density testing during subgrade preparation and placement of the fill to check conformance to the required percent of maximum density and moisture control. As recommended in the soils investigation, on -site or approved imported soils were suitable for placement during construction. Fill material tested by Terracon met the recommendations as outlined in the geotechnical report. The results of the field and laboratory testing were forwarded for review. In addition, the on -site superintendent and subcontractors were informed on a daily basis of the. test results performed. Terracon performed 41 tests for the site subgrade and fill placement. The compaction test results met or ultimately achieved (after retesting) specification requirements at the locations tested. The moisture/water content of the soils tested were typically outside of the geotechnical report tolerance recommendations. Therefore it is recommended that proper and adequate drainage be provided to reduce the potential of swell -consolidation based upon a change in moisture conditions. Concrete The Portland cement concrete placed and tested on -site consisted of 9 tests for physical property and compressive strength tests. All reports have met or exceeded the specified minimum compressive strength requirements for the project as provided by the general contractor. Arizona ■ Arkansas ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Kentucky ■ Minnesota ■ Missouri Montana ■ Nebraska ■ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Quality Engineering Since 1965 Materials Compliance Summary Elizabeth Street Senior Apartments Project No. 20011139 Page 2 Hot Mix Asphalt Terracon performed 12 in -place density/compaction tests with all tests meeting the project specification criteria. In addition, 2 samples were obtained to perform extraction -gradation testing with the test results meeting the mix design criteria provided. Foundation Terracon provided a review of the post -tension slab foundation design as requested. A summary of the review was provided in a report, dated November 26, 2001. Per Terracon's geotechnical review the foundation plans and details are in general accordance with the geotechnical recommendations, and does not relieve the structural design engineer of their responsibility to the project. It has been our pleasure to work with you on this project and to continue providing services on future construction projects. Should you have any questions, or need additional information, please contact us at your convenience. Respectfully submitted, pp RECIS TERRACON Reviewed by: RP.•••••• CCy O� • p. R/C •. ! 27712 Mike L. Walker, CET David A. Ri 'O °A.E. Manager of Construction Services Geotechnical Copies to: (1) Addressee (3) Pueblo Professional Contractors (1) MNA, Inc. (1) Kephart & Associates Architects MLW/DAR/mjg P / o PROPOSED 20' SANITAIR WE? SERNCE wa€awoa / G / EASEMENT BY SEPERAIE DOCUMENT / F z 100-YR SIC W�Jo xAMI 101mm / wwww z$ FLOOOPLAIN E199Ra.1B Fwanw 'p +BBB&93- C \ _EIv.aBSB 3a33 z i // I1.ST PK W 0.W1i \ xiB1iC42 ^1OI12.1— T EaWM.aF I991641 Q IN� Ixv-abas xin \ JAY//�f15/rY Y///Arr� 0 iR o n..0 INv.ae.as 3aIM RN.dSM %n M// ORA90 5l 1 r o fi 1i I� Na =ZZWNUY / naF2e — •r-iA Y/.? a oo5U0 i a Dos<� / 37N doUVIWo �T �°° AS CO STRUCTED a ��w) PROPOSED 2O DRAINAGE EASEMENT BY M Z VJ / 1� w SEPERATE DOCUMENT O Ny a H97 \ \ PROPOSED 2' R PE C O R D Er NV ¢IT.dM4 34a) 0 SHALL vWAL( I mM OIJT eR JI.a) � - r— 7-r41i6.IIo-1DI44.L� — / E 1 9 8 HC H HC HIC TRICKU PAN W Z / /T• n. Wa 8 �\ �— 0.85% DRAWING TIE INTO EMISTNC {q SIDEWALK CU / NEW STOW NEWQ NOTE: z I / Dom �� \ D�E�IL�L�{RT ALL STORM SEWER SHALL BE INSPECTED BY THE CITY OF � � g RY.Mddd { n \ � T � ' T ` � T FORT TOLUNS. 'z - p / IXV.babb(W) mm W4 . Ixv-bbae(WT) nv x 1BMT4T Io1m" ./ w EMBBLIF I9973.05 W spa M73 IF OF V RCP AT8 OUDM IlEw MANHOLE LE LNE WY Mo.a rm xW a eww a a mweoWN �//�/�/� IPK e-w CRON 14w34. IN.)T) OM I \ / My of FM Collins, Colorado IW X.IBBD£65 loomm UTUTY PLAN APPROVAL TIIbIN01 FrlfsiHP 1"I 1 'JyROWI� PK ROOF 1% 4 on BE OF E � `2APPROD: x4PAi'Rbk CV EnpFe. pM aRW RLT W O.Sai \ NIET / CHECKED BY: mw t Na ;w uuV aA i M ¢ ss- D CHECKED BY.N N _ ff _ _ _ _ _ �'ro — X _ 20 IO zo so mmm.n. wmr Pw O IXV M.bARP JT.]T J L I5' PROPOSED — In QI7--SA6P �f.OJ- ° WNP.M..BP M10 _ _ a UilLltt. 1' ADDITIONAL ROW. ..- N '�` +•�• NiWN.% 1002S.BY .. .I. �.... Sg4LE: 1 >:12D• .CHECKED BY.vyu tnwpenm poy u b EASEMENT DEDICATED PER x1H15 ('LAY E1tMtyp laabJ.ri 1 -_ CHECKED BY. CHECKED BQ C oN a 5048 - - - — —_ - r:: _ 5048 ow 5046 5046 C 1 06 5044.p; 5044 z° N p o r p FS22 '\ _ » 2� _ _ __ _ N m O lV F• > i i. < ly Ina ? _.:.. _ _ _ __ _ i 'r 5042 - _.. Kai_ :` _ — __ _ - -r _ "F _ _-- 5042 n - 5040 _._.- _— __--._�_.._ _ _- _ - — — - Y < 8. — 5040 b B In : RGP e1NwND- a`3 -__ - _— ___ _— _ d 5o3e = _ T— -- - -- — "n _ -- �_=-- _ _ So3a - _ — --- - - — a ._. 5 - - - — --- W F J Na> 5038 — - _ . __ . _ . 5036 " z w M O I W 5034 = — D' — __ _ _ _ --_ — 5034 Q d _ -L. __ - _ _. __ - _ _ —__ _ _ _ _— to J 5032 _ _ — .____---- — _-.Na.,x 5032 _77 _. -. .. -._. SHEET 9 OF 12 0 .00 0+40 0+80 1+20 1+60 2+00 0+00 0+40 0+80 1+20 1+60 2+00 JOB NO. 39212.05