Loading...
HomeMy WebLinkAboutLot Certifications - 11/16/2016Crowne Partners 4.3% = GRADE PER SURVEYED ELEVATIONS RD = ROOF DRAIN NOTE: THIS DRAWING HAS BEEN MODIFIED BY ASPEN ENGINEERING FOR THE PURPOSES OF A GRADING CERTIFICATION 50.48TC = TOP OF CURB BASED ON SURVEYED LEVELS DESIGN TF=46.75 DESIGN TF=46.75 DESIGN TF=47.67 DESIGN TF=47.67 DESIGN TF=47.67 DESIGN TF=47.67 RD RD RD RD RD RD RD RD RD RD RD RD RD RD 16.7% 2.86% 4.55% 1.59% 6.86% 16.0% 14.6% 5.45% 3.08% 6.67% 5.11% CURB CHASE CURB CHASE CURB CHASE CURB CHASE DESIGN GRADE NOW 44.69 7.78% 8.89% 2.94% 4.71% 4.71% 6.92% 7.14% 7.29% 10.0% RD 2.20% 1.20% RD 1.00%