Loading...
HomeMy WebLinkAboutGrading Plans - 10/13/2014ECEIVE ocrT -2014 Sis _33 1�" =_,r,� BY: co 8;— GXRAZ� DESIGN 303-9 [SATE 10-13-lq BY �: gg�� Y rLetiw VY1409832 s- I!)Sr Z- --=M.* nil As 31'VO N 9 Is3 G a oWv, E) Z39N2 17 Dan Mogen From: merrill@landmarkgarages.com Sent: Monday, November 03, 2014 10:15 AM To: Dan Mogen Subject: Re: 5204 Greenway Drive The garage will be sitting on flat ground. There will be no excavation done. Existing drainage patterns will stay as they currently are. No additional flow will go towards the east or the north as a result of the increase in impervious garage floor being poured. Merrill miller Sent from my iPhone On Nov 3, 2014, at 9:56 AM, Dan Mogen <dmoeen@fcgov.com> wrote: Merrill, Per our conversation, please respond to me here. Thanks, Dan Dan Mogen, El, CFM Stormwoter Engineer City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 (970)224-6192 dmoeen@fcgov.com <image001.png> 1