HomeMy WebLinkAboutSite Certifications - 06/14/2010/MIRES ASSOCIATES June 7, 2010 Mr. Jay Barber IU City of Fort Collins \�I' Stormwater Utility ' 700 Wood Street Fort Collins, Colorado 80521 Re: Drainage Certification for Fort Collins Club Expansion Dear Jay, We recently surveyed the water quality pond located at the Fort Collins Club at 1307 East Prospect Road. Spot elevations were checked at pertinent locations to verify the water quality pond volume and elevations. The enclosed 24" x 36" drawing shows as -built elevations (hand- written). In addition a volume calculation spreadsheet for the pond is enclosed as well as a Drainage Site Certification Checklist. The water quality pond volume is 189 cubic feet. Spot elevations were taken at the pond low point, water quality control flow control plate discharge hole, top of the water quality control structure, and pond spillway invert. The spot elevations were within 0.36" — 4.0" of the design: elevations. All elements associated with this pond are in general conformance with the, design plan sheet enclosed. Final seeding will be completed in the pond area following approval of.this drainage certification. It is my recommendation that the Certificate of Occupancy for this property be released. If you have any questions, please call. Sincerely, Ayres Associates Inc ` �G c Daniel T. Meyer, PE Water Resources Engineer DTM:sp Enclosures cc: Brian Nelson, PS BARB6LT.DOC 8.31 3665 JFK Parkway o Building 2 a Suite 200 s Fort Collins, CO 80525-3152 • 970.223.5556 • www.AyresAssociates.com DRAINAGE SITE CERTIFICATION CHEKCLIST Please fill out all applicable items in this certification form for single family, multi -family and commercial properties. Write "OK" for items checked or actual number checked in field. Use "N/An for items that are not applicable to the property that is being certified. A. Drainage facilities certification 1. Pond Certification -volume verification OK a.topographic records and volume b.cross-sections and spot elevations -positive fall to pan OK -side slopes o K -invert elevation K -spillway elevation O K -placement and size of riprap JVIA -side slopes _grading -orifice plate installation and size_ 0 K -compaction of berm A11A -structural integrity of pond O/< -subsurface media for water quality ponds and swales Q K 2. Swales 1111A -location (are they within easement) -dimensions and cross-section verification -longitudinal slopes and side slopes -spot elevations -permanent erosion control measures (drop structures, riprap, etc....) -tie-in to pipes, pans, curbs, etc.... -weir size (elevations, size, opening, etc.) -available freeboard -landscaping infringement on swales 3. Pipes -size and type Q K -slopes (as -built and comparison to minimum 0.4% slope) OK -pipe capacity calculations if slopes are significantly altered 1111A -invert elevations 0 K -installation and backfill material ()K -cover N1A -encasement and clearance from other utility lines close by N/A -joints Y// 4. Concrete Pan Channels N//1 -size -slope -super elevation -cross .section -thickness -elevations S. Inlets AIM -size and type -size of opening (or name of standard used) -grate elevation -invert elevation -box size 6. Cross pans )V//} -size -type -grade -elevation -cross-sectional depth -tie-in to curb and gutter 7. Culverts IVIA -size -type -invert elevation -headwalls 8. Underdrains IVIA .size -type -cover -backfill -geotextiles -cleanouts 9. Curb cuts 'Extif 1 1 *114 -size -tie into swale, pipe, etc... B. Certification of Grade Elevations Adjacent to Drainage Facilities: N//A- -minimum opening elevations -top of foundation elevations -comparison to 100 year WSEL's (Freeboard requirements and floodplain issues) C. Certification of Erosion Control Measures: 1. Permanent Measures: -Permanent vegetation (6" bare spots and weeds under control)F A _1_� bc_ seea(e.A t M-%v,icheo� -riprap N/A -riprap bedding A//A -drop sections N// -sediment basins/water quality ponds -netting mats/blankets N//4 -mulching 2. Temporary Measures: N/A -mulching -inlet filter installation -check bale dams -seeding and temporary vegetation -silt fence D. Site Cleanup After Construction -construction clean up o K -smoothing of ruts {� bA Co�,.�p)e!-cad �)^ �O••d arcc� -reseeding E. Statement of Compliance This certification is signed and stamped and by signing this form the engineer(s) attests that they have inspected the site and to the best of their knowledge the as -built conditions of the drainage facilities are as described in the above form and in the redlined plans enclosed. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any Stormwater Utility holds on Building Permits and/or Certificates of Occupancy. F. Signature and Stamp by a Colorado Registered Professional Engineer. I11�•i i 1 _% a c 0 a O a� Z U O c a o J U U ii J Q C U O w n 'C J d o � co :-: c N co U co O T�� N� 0 0 0 0 0 0 0 0 0 0 0 SW ` T r Up w -- a� �OOOrMch �� "i D J O O O O O O i� ^IR. �IwO � e IY1M0 ORS 1�1 _ r Mg A 1 I iirt mw p 'er i cm mo ve IIRRRRRRRRRRREIR II��R�\\R�RRRO�RHgo11 sUUI ImdY� RRM'MRY ,� oil n�1nou EYIL ROII on ]1/eLL6/ km M E OY 4PNMC wflIMO It MIX. w MT 18 em 4PNMC wflIMO It MIX. w MT 18 em (UCM URETER SCMMMI SMEW $NERW 8YF MULCH (pC I THEN 5® 4YER. M.11ER CkI WNPL WLWF Et RMTeR swr.a. EL -«nm pN e' GN`RL FINITE lL IMRc uFFTw: MITI4Ci Tm' Ent -I4s us SN. TESTSwPaxn ys. 1+, dR N To wm owes Mlx. ca16E Prot +o 1E.w TEREENt IW Y, Ias. EXX SPETFlm . eaSMMI T um mo MIND it"wEV C-m y Cp 1 UXGERURVx mR PI Ma He Mn Lw Liam dwE E� SECTION A —A,, i DETENTION PO Q xmm II FIRST YEAR wdiENwwa MLmm To mnsran INFRIJOE TEMwRww IRRrMmx Paid uvracTo RrEms Mow sxm�o RE Rd3Mn AND TRPnw TO I sp THE L IM E E w OYMGmYFO[11N.W. ! a m. ME0 wnx AFFIRMED KRI 5 TO CORIRa NOMNM ME d WE ARL FS scroso uus w�T. rnT�xMAHTI m wwu's® IN w DPAIRIE WET ND D M % d ET sqT 91) LLLLLLC SIR MR NMm • Q jff �Z ^A J 00 ?E ON Z U m W J EMM x acc • m Q 0 C7U °"°"• U Z Z Q Q a (¢70 U cc EL O LL