June 7, 2010
Mr. Jay Barber IU
City of Fort Collins \�I'
Stormwater Utility '
700 Wood Street
Fort Collins, Colorado 80521
Re: Drainage Certification for Fort Collins Club Expansion
Dear Jay,
We recently surveyed the water quality pond located at the Fort Collins Club at 1307 East
Prospect Road. Spot elevations were checked at pertinent locations to verify the water quality
pond volume and elevations. The enclosed 24" x 36" drawing shows as -built elevations (hand-
written). In addition a volume calculation spreadsheet for the pond is enclosed as well as a
Drainage Site Certification Checklist.
The water quality pond volume is 189 cubic feet. Spot elevations were taken at the pond low
point, water quality control flow control plate discharge hole, top of the water quality control
structure, and pond spillway invert. The spot elevations were within 0.36" — 4.0" of the design:
elevations. All elements associated with this pond are in general conformance with the, design
plan sheet enclosed. Final seeding will be completed in the pond area following approval of.this
drainage certification.
It is my recommendation that the Certificate of Occupancy for this property be released. If you
have any questions, please call.
Sincerely,
Ayres Associates Inc
`
�G c
Daniel T. Meyer, PE
Water Resources Engineer
DTM:sp
Enclosures
cc: Brian Nelson, PS
BARB6LT.DOC
8.31
3665 JFK Parkway o Building 2 a Suite 200 s Fort Collins, CO 80525-3152 • 970.223.5556 • www.AyresAssociates.com
DRAINAGE SITE CERTIFICATION CHEKCLIST
Please fill out all applicable items in this certification
form for single family, multi -family and commercial
properties.
Write "OK" for items checked or actual number checked in
field.
Use "N/An for items that are not applicable to the property
that is being certified.
A. Drainage facilities certification
1. Pond Certification
-volume verification OK
a.topographic records and volume
b.cross-sections and spot elevations
-positive fall to pan OK
-side slopes o K
-invert elevation K
-spillway elevation O K
-placement and size of riprap JVIA
-side slopes
_grading
-orifice plate installation and size_ 0 K
-compaction of berm A11A
-structural integrity of pond O/<
-subsurface media for water quality ponds and swales Q K
2. Swales 1111A
-location (are they within easement)
-dimensions and cross-section verification
-longitudinal slopes and side slopes
-spot elevations
-permanent erosion control measures (drop structures,
riprap, etc....)
-tie-in to pipes, pans, curbs, etc....
-weir size (elevations, size, opening, etc.)
-available freeboard
-landscaping infringement on swales
3. Pipes
-size and type Q K
-slopes (as -built and comparison to minimum 0.4%
slope) OK
-pipe capacity calculations if slopes are
significantly altered 1111A
-invert elevations 0 K
-installation and backfill material ()K
-cover N1A
-encasement and clearance from other utility lines
close by N/A
-joints Y//
4. Concrete Pan Channels N//1
-size
-slope
-super elevation
-cross .section
-thickness
-elevations
S. Inlets AIM
-size and type
-size of opening (or name of standard used)
-grate elevation
-invert elevation
-box size
6. Cross pans )V//}
-size
-type
-grade
-elevation
-cross-sectional depth
-tie-in to curb and gutter
7. Culverts IVIA
-size
-type
-invert elevation
-headwalls
8. Underdrains IVIA
.size
-type
-cover
-backfill
-geotextiles
-cleanouts
9. Curb cuts 'Extif 1 1 *114
-size
-tie into swale, pipe, etc...
B. Certification of Grade Elevations Adjacent to Drainage
Facilities: N//A-
-minimum opening elevations
-top of foundation elevations
-comparison to 100 year WSEL's (Freeboard
requirements and floodplain issues)
C. Certification of Erosion Control Measures:
1. Permanent Measures:
-Permanent vegetation (6" bare spots and weeds under
control)F A _1_� bc_ seea(e.A t M-%v,icheo�
-riprap N/A
-riprap bedding A//A
-drop sections N//
-sediment basins/water quality ponds
-netting mats/blankets N//4
-mulching
2. Temporary Measures: N/A
-mulching
-inlet filter installation
-check bale dams
-seeding and temporary vegetation
-silt fence
D. Site Cleanup After Construction
-construction clean up o K
-smoothing of ruts
{� bA Co�,.�p)e!-cad �)^ �O••d arcc�
-reseeding
E. Statement of Compliance
This certification is signed and stamped and by signing
this form the engineer(s) attests that they have inspected
the site and to the best of their knowledge the as -built
conditions of the drainage facilities are as described in
the above form and in the redlined plans enclosed.
Failure to properly disclose all known information could
result in the rejection of this certification and prevent
the release of any Stormwater Utility holds on Building
Permits and/or Certificates of Occupancy.
F. Signature and Stamp by a Colorado Registered
Professional Engineer.
I11�•i i
1 _%
a
c
0
a
O
a�
Z U
O c
a o
J U
U ii
J
Q
C
U O
w n
'C
J
d
o �
co
:-:
c
N
co
U
co
O
T��
N�
0
0
0
0
0
0
0
0
0
0
0
SW
`
T
r
Up
w --
a�
�OOOrMch
�� "i
D J
O
O
O
O
O
O
i� ^IR. �IwO � e IY1M0 ORS
1�1 _
r Mg
A 1 I iirt mw p 'er i
cm mo ve
IIRRRRRRRRRRREIR
II��R�\\R�RRRO�RHgo11
sUUI
ImdY�
RRM'MRY
,�
oil
n�1nou
EYIL
ROII
on
]1/eLL6/
km M E OY
4PNMC wflIMO It MIX. w MT 18 em
4PNMC wflIMO It MIX. w MT 18 em
(UCM URETER SCMMMI SMEW $NERW
8YF MULCH (pC I THEN 5® 4YER.
M.11ER CkI WNPL WLWF
Et RMTeR swr.a.
EL -«nm
pN
e' GN`RL FINITE
lL IMRc uFFTw:
MITI4Ci Tm'
Ent
-I4s us SN. TESTSwPaxn
ys. 1+, dR N
To
wm owes Mlx.
ca16E Prot +o
1E.w TEREENt IW Y,
Ias.
EXX SPETFlm .
eaSMMI T um
mo
MIND
it"wEV
C-m y Cp
1 UXGERURVx
mR PI Ma
He Mn Lw
Liam
dwE E�
SECTION A —A,,
i DETENTION PO
Q
xmm II
FIRST YEAR wdiENwwa MLmm To mnsran
INFRIJOE TEMwRww IRRrMmx Paid uvracTo
RrEms
Mow sxm�o RE Rd3Mn AND TRPnw
TO I
sp
THE L IM E E w OYMGmYFO[11N.W. !
a
m.
ME0 wnx
AFFIRMED KRI 5 TO CORIRa NOMNM ME
d WE ARL FS
scroso
uus w�T.
rnT�xMAHTI m wwu's® IN w
DPAIRIE WET ND
D M
%
d
ET
sqT
91)
LLLLLLC
SIR
MR
NMm •
Q jff
�Z ^A
J
00 ?E
ON
Z
U
m W J
EMM x acc
• m Q 0
C7U
°"°"• U Z
Z Q
Q
a (¢70
U cc
EL
O
LL