Loading...
HomeMy WebLinkAboutSite Certifications - 10/30/1995STEWART&kSSOCIATES Consulting Engineers and Surveyors l t October 23, 1995 Mr. Glen Schlueter Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Mr. Schlueter: This is regarding certification of drainage facilities in English Ranch P.U.D., Sixth Filing. Carrington Road and its storm drain and curb inlets were constructed with the English Ranch Fifth Filing and have been certified. The detention pond that is North of the Sixth Filing has been constructed with the Fourth Filing and has been certified. The curb, gutter and sidewalks and the paving of the streets in the Sixth Filing have been completed. The pan across Eastgate Lane at County Road 9 has also been completed. All of the improvements were constructed in compliance with the approved utility plans. Please release the issuance of all building permits in English Ranch P.U.D., Sixth Filing. Thank you for your attention to this matter. Sincerely, 0 e0 A• RIJ a`�G13TEgt, Richard A. Rutherford, P.E. L.S. �C President * 5028 rsc enclosures cc: Bartran & Co. James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382