Loading...
HomeMy WebLinkAboutLot Certifications - 10/23/1997 (5)September 9, 1997 Basil Harridan. The City of Fort Collins Stormwater Utility 235 Mathews Fort Collins, CO. 80529 RE: -Drainage Certification �East-Drake Terrace-P.-U- Building F Project Number: 9758.00 Dear Basil: This is the fourth partial drainage certification for the above referenced project and will include Building's C, F and G (see enclosed plan). Building D is the only structure remaining to be certified as part of this development. The developer has requested a separate certification letter for each building therefore, you will find three letters contained in this submittal. Previous certifications, completed in 1995, have already verified curb and gutter flowline elevations and high points in the parking lot. Building F is located in the southwest corner of the site. This certification verifies that the finished grading surrounding the building is in substantial compliance with the approved Grading and Drainage Plans. A field inspection of the building and finished grading was conducted on Tuesday, September 2, 1997 by the project engineer. The following is a summary of the observations made at the site during this field visit. 1) Building D is the only remaining structure to be constructed; 2) Building's B, E and H were all constructed and certified in 1995; 3) Landscaping surrounding Building's C, F and G is complete; 4) There are no downs pouts directed to the west on Building C. Items to be certified in association with this project include: 1.) Verification of flowline elevations and grades in the parking areas and location of high points in the drive entrances, 2.) Verification of finished grades surrounding the proposed buildings, 3.) Confirmation of the discharge location of down spouts on Buildings B, C and D. 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221-4159 East Drake Terrace P.U.D. Drainage Certification September 9, 1997 The following is a breakdown of the remaining work to be completed subsequent to the certification of Building's C, F and G: h\.\ `\ OIL '��yy±\±Ci \ ♦ 1 .. ci\\♦Fc�"n x�, 1.) 100% 0 0 0.00 2.) 85% 15% $175 / bldg 175.00 3.) 66.7% 33.3% $50 / bidg 50.00 TOTAL 225.00 TOTAL AMOUNT TO REMAIN IN ESCROW 337.50 The total amount in escrow is determined by increasing the total cost remaining, by 1.5 times, to obtain an amount to be retained in escrow by the City of Fort Collins Stormwater Utility. To the best of my knowledge, belief, and opinion, the drainage facilities were constructed in accordance with the design intent of the approved drainage report and construction drawings. If you require additional information or analysis regarding this project please contact me at 221-4158. Sincerely_ NORTH =Mv Mary B. ERVICES, INC. r3 I /I I \ \ MARQUEPTE STREET $,..,.R3A j / ROOF LEADERS FROM THIS BUILDING SIPLL DRAIN TO THE SIG TH OR SOUTHEAST ROOF \ ERWI�Thug BUILDING S1NLL DRN THE SOUTH. NORTH OR EAST II PJu.rOe.K 0 67 �N� II77_ J ---- --- �V_ 'l ` of vz J 0A 1 ooBID \ �— — _ — _ — — — — _ — _ —n- M CN-STORM i EAST DRAKE R N ' y' Developed area which drains toward existing detention pond designed for RA Cottonwood P.U.D. (See Drainage Study for Dartmount P.U.D. included in the Adrainage report. Ago refer to Cotton— wood P.U.D. Final Utility Plans by JCR Engineering approved 10/16/81. C3-840) ' II ( �v i 41i CMP STORM D-2------W--�- ---- -W--- - 0.21 ac. LEGEND MY EXISTING CONTOUR � Ri PROPOSED CONTOUR i%- — VF EXISTING FIRE HYIXWR EXISTING STORM SEYIER (�— — EXISTING SANITARY SEWER MAN —---►---- TIME OF CONCENTRATION PATH GEVELOPED DRAINAGE BASIN BOUNDARY DEVELOPED DRAINAGE FLOW ARROW 1 3JB Oa DEVELOPED BASIN DESIGNATOR k AREA ® DESIGN POINT 20 GRAPHIf SCALE BD ( IN FEET ) t inch a 20 ft. NOTE: FOR u.S.O.S. DATUM ADD 4900' TO ALL SPOT ELEVATIONS NOTES 1. MAINTENANCE OF ALL ON —SITE DRAINAGE STRUCTURES AND APPURTENANCES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNERS AND NOT THE RESPONSIBILITY On THE Cm OF FORT COLLINS 2. EXISTING CONTOURS. AS SHOWN, ME APPROXIMATE ONLY. 3. LOT GRADING SHALL BEGIN AFTER APPROVAL WITH CONSTRUCTION OF UTILITIES. DRAINAGE STRUCTURES ! APPURTENANCES, AND PARK— ING AREAS TO FOLLOW. 4. TEMPORARY EROSION CONTROL MEASURES CONSIST OF TEMPDIPARI SEEDING • MULCHING. 5. PERMANENT VEGETATNE EROSION CONTROL WILL BE USED IN CONJUNCTION WITH LANDSCAPING. PERMANENT REVEGETATION OF AREAS DISTURBED BY CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. SEED WILL BE APPLIED BY DRILLING AND PROTECTED BY CRIMPED S i MULCH. STRAW SHALL BE APPLIED AT A RATE OF TWO TONS PER ACRE MINIMUM. CITY WIN OF FORT COLLINS, COLORADO 6 �eI.AN APPROVAL nrz n, Was IV AMR Inc City at Von reum, Starmweter Utility Department Copy Fourth PMaal Drainage Certification Building's C,F And G Rev! '°°`I By NORTHERN ENGINEERING SERVICES](Project: 9337.o(d"nt Date EAST DRAKE TERRACE P.U.D. ESheet420 SOVPN ID11E5 SLATE 202, FT. COLLINS. COLORADO BD521 "�°''�20 DRAINAGE & EROSION CONTROLPLAN(303) 221-4138 DESIGNER: (.7H CHECKED BY: MFJDRAFTSMAN: ACAD PREPARED:APR 1994 S