Loading...
HomeMy WebLinkAboutLot Certifications - 06/14/1995Northern Engineering Services, Inc. June 13, 1995 Glen Schleuter City of Fort Collins Stormwater Utility 235 Mathews Fort Collins, CO. 80522 RE: Drainage Certification East Drake Terrace P.U.D. Project Number: 9511.00 Dear Glen: This is the third partial drainage certification at the above referenced project and pertains to Building B only. This certification verifies the finished grading of the swale on the west side of the building adjacent to Stover Street and the locations of downspouts. Field survey information of as -built conditions for this certification was obtained by Northern Engineering Services. A field inspection of the drainage swale and associated landscaping was conducted on Tuesday June 13, 1995 by the project engineer. The following is a synopsis of the observations made during this field visit. 1) Buildings B, E and H are all constructed with complete landscaping surrounding each, 2) Downspouts which were discharging to the west, as was observed on May 24, 1995, have been corrected based on verbal confirmation by the developer. This letter serves to certify that the grades surrounding Building B and downspout locations are in substantial compliance with the design intent of the Drainage and Grading Plans . 420 S. Howes, Suite 202 • Fort Collins, Colorado 80521 • (970) 221-4158 • Fax (970) 221-4159 Items to be certified is association with this project include: 1.) Verification of flowline elevations and grades in the parking areas and location of high points in the drive entrances, 2.) Verification of finished grading of swales surrounding the proposed buildings, 3.) Confirmation of the discharge location of downspouts on Buildings B, C and D. The following is a breakdown of the remaining work to be completed: .::... ....... .:; : ; tt Ms ,_ 70 1.) 100% 0 0 0 2.) 43% 57% $175 / bldg 700.00 3.) 33.3% 66.70% $50 / bldg 100.00 TOTAL 800.00 TOTAL AMOUNT TO REMAIN IN ESCROW 1200.00 The total amount in escrow is determined by increasing the total cost remaining, by 1.5 times, to obtain an amount to be retained in escrow by the City of Fort Collins Stormwater Utility. Future certifications will gradually reduce this amount. To the best of my knowledge, belief, and opinion, the drainage facilities were constructed in accordance with the design intent of the approved drainage report and construction drawings. If you require additional information or analysis regarding this project please contact me at 221-4158. Sincerely, NORTHERN ENGINEERI Mary B. Wohnrade, P.E.