Loading...
HomeMy WebLinkAboutLot Certifications - 09/19/1997S E R V I ( E S INC September 9, 1997 Basil Harridan The City of Fort Collins Stormwater Utility . 235 Mathews Fort Collins, CO. 80522 RE: Drainage Certification ast Drake Terrace-P.U-.-D — Building C Project Number: 9758.00 Dear Basil: This is the fourth partial drainage certification for the above referenced project and will include Building's C, F and G (see enclosed plan). Building D is the only structure remaining to be certified as part of this development. The developer has requested a separate certification letter for each building therefore, you will find three letters contained in this submittal. Previous certifications, completed in 1995, have already verified curb and gutter flowline elevations and high points in the parking lot. Building C is located in the northwest corner of the site. This certification verifies that the finished grades surrounding the building and, the location of down spouts, are in substantial compliance with the approved Grading and Drainage Plans. A field inspection of the building and finished grading was conducted on Tuesday, September 2, 1997 by the project engineer. The following is a summary of the observations made at the site during this field visit. 1) Building D is the only remaining structure to be constructed; 2) Building's B, E and H were all constructed and certified in 1995; 3) Landscaping surrounding Building's C, F and G is complete; 4) There are no down spouts directed to the west on Building C. Items to be certified in association with this project include: 1.) Verification of flowline elevations and grades in the parking areas and location of high points in the drive entrances, 2.) Verification of finished grades surrounding the proposed buildings, 3.) Confirmation of the discharge location of down spouts on Buildings B, C and D. 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221-4159 East Drake Terrace P.U.D. Drainage Certification September 9, 1997 The following is a breakdown of the remaining work to be completed subsequent to the certification of Building's C, F and G: WON \.w�.�.ru \ \'\..\. �\ �i �w��d.)M���.��\\\`_.v\\\\♦ 100% �ti..\..tea-�.\..L.\\\�i:\\��\.v 0 [:C \va\.v-_\��"\ 0 ��,.v-.��`.�.�\C vw .rm0.w.. e` 0.00 1.) 2.) 85% 15% $175 / bldg 175.00 3.) 66.7% 33.3% $50 / bldg 50A0 TOTAL 225.00 TOTAL AMOUNT TO REMAIN IN ESCROW 337.50 The total amount in escrow is determined by increasing the total cost remaining, by 1.5 times, to obtain an amount to be retained in escrow by the City of Fort Collins Stormwater Utility. To the best of my knowledge, belief, and opinion, the drainage facilities were constructed. in accordance with the design intent of the approved drainage report and construction drawings. If you require additional information or analysis regarding this project please contact me at 221-4158. Sincerely, NORTH] Mary B. ' PWICES, INC.