HomeMy WebLinkAboutLot Certifications - 06/04/2003 (13)STEWAKr&kSSOCIATES
Consulting Engineers and Surveyors
May 28, 2003
Mr. Jay Barber
City of Fort Collins Utilities
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Jay,
S RECEIVED
MAY 2 8 2003
Please find enclosed the red -lined "AS -BUILT" survey of the grading on Lot 9, Fossil Creek
Office Park East which is 105 Coronado Court.
The grading was done in substantial compliance with the Grading Plan prepared by Stewart &
Associates, Inc., except at the Southeast corner of Lot 9 where there needs some grading to allow / 02
the runoff to flow in the curb and gutter of Lot 8 to the curb and gutter on the West side of the
Frontage Road. I informed Dohn Construction what was needed and they agreed to do the
grading.
Also, the gutter flowing Southwesterly from the trash enclosure was extended through the
proposed island rather than the gutter being built around the island and Southwesterly to
Cameron Drive. The concrete pan was not built. The runoff will flow Easterly to the Frontage
Road, rather down Cameron Drive.
If you have any questions regarding this. certificate, please call.
Sincerely,
Richard A. Rutherford, P.E.
RAR/meh
Ffl
James H. Stewart and Associates, Inc.
103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522
FOSSIL CREEK OFFICE PARK EAST It9 asb.doc 970/482-9331 • Fax 970/482-9382
CORONADO COURT
r--w
.— ear rrtn sc
__ __.__ __ --_
_v
.:T7(i =l
6 '
3x W��1lrM 9�
PROPoSED BUILDING tq.
oKKoe�ra
i µ t
�v'-. Mr e� [rer tune a cvrrrx
z a,
ti
'AS
-B UILT -UKVEy OF G IEAD/�4
AUy ZZ/Zoo3
LOT 9/ Forriz. CA&CK C>P(7GE PA.e,e EA57
IOS COROA/ADD COUP¢
�/
.�71.*a. a.Cwz6, .,c =" 1 so a
4
ri[nn211 �
o
77
bOEM/iK /QO'/Mi /1'fllr//r 441d1 Y.
N
SCALE.' I"=20'
T'1 0 f19 10 a0
GRAPNA: 5011E - RFl