Loading...
HomeMy WebLinkAboutLot Certifications - 01/10/2003,NENORTHERN ENGINEERING SERVICES, INC. December 23, 2002 Project No: CSL- 02-172 Jay Barber Lisa Dunn City of Fort Collins Stormwater Utility Larimer County Engineering P.O. Box 580 P.O.Box 1190 Ft. Collins, CO 80522-0580 Ft. Collins, CO 80522-1190 RE: Lot 11, Block 10 Fossil Lake P.U.D., First Filing; Fort Collins, Colorado 6421 Rookery Drive Dear Tay and Lisa, This letter serves as final certification for the above reference address according to the requirements of the Stormwater Utility in the Stormwater Building Permit Notice for this address dated 0312012000. This certification include the items noted on the Stormwater Building Permit Notice and are as follows: • Grading certification • Swale certification • Finished floor elevation certification • Lot corner elevation certification • Lowest building opening elevation certification Final grading is substantially complete, functions properly and meets the intent of the original subdivision grading and drainage design according to the Final Utility Plans for Fossil Lake P.U.D., First Filing by Northern Engineering Services, Inc; Northern Project No: 9812.00 FLF; Director of Engineering approval date 05/19/99. We have recommended to the owner, Chris Smith, via a phone conversation today and this letter that the three (3) window wells in the northwest comer of the building be raised by at least one timber (4" x 4") and the finished grade at these locations be brought up a similar amount to increase the slope away from the house in this area. He agreed and indicated that he was intending to do this. King Surveying provided elevation shots. Elevations based on the same datum utilized with the Fossil Lake P.U.D., First Filing. Attached is a copy of the site plan indicating the record field shots obtained for the lot. A copy of the portion of the Grading, Drainage and Erosion Control Plan from the subdivision utility plans, of which this lot is a part, is attached for reference only. If you have any questions, Please call at (970) 221-4158 Sincerely, pp RE�/S Northern Engineering Services, Inc �op� �gERS�FgFo NUMBER Mark Oberschmidt, P.E. °9_• 357 •�4 CC Chris Smith 420 SOUTH HOWES, SUITE 202 / FORT COLLINS, COLORADO 80521 / 970.221.4158 / FAX 970.221.4159 DEC 20 2002 2:43PM KING SURVEYORS INC 9706865821 p.2 SITE CERTIFICATION NOT REQUIRED FOR ADDITIONS AND REMODELS Date: 1-I\-L3 o Z Address: G 4 Z l R ook er- !A 6T Lot: 11 Block: i o Subdivision: j=dss.\ P.'J.b, 1st' 15-L-1\5 The relative elevations at the above referenced address were measured at the lot sides and corners, top of foundation and other locations as needed. The sides, elevations and drainage patterns as measured are in substantial conformance with the approved drainage and final grading plan for the referenced subdivision. The grading has been construction as to facilitate the intent of the approved Drainage Plan for the subdivision. ❑ The lot grading does not conform to the approved grading plan. The attached revised grading plan reflects the existing grading at this site and should be functionally adequate for this lot and the overall subdivision drainage plan. �o�il�zr�v �Gy�iave�i�s�� Ses��ceS Z"2..1-415� ENGINEERING I SURVEYING FIRM NAME PHONE FIRM ADDRESS Cc) CITY STATE ZIP S*6�(nY� Utz;Sas��U�\ PRINT NAME OR ENGINEER 1 SURVEYOR 13BERs!SlF9� y U�IBER o--4; ,• 21 . ME !0.019 k� k kZc \ t A- K Tuesday, February 11, 200310:43 AM C. Chris Smith (970) 377-0619 p.02 12-?3-72: 1:47Fb1;:JC�IIHE RW E:�G :9 �02Y1::53 r. .. .. NORTHERN ENGINEERING SERVICES, INC. December 23, 2002 Project No: CSL- 02-172 Jay Barber Lisa Duos City of Fort Collins Stormwater Utility Larimer County Engineering P.O. Box 580 P.O.Box 1190 Ft. Collins, CO 80522-0580 Ft. Collins, CO 80522-1190 RE: Lot 14 Block 10 Fossil Lake P.U.D., First Filing; Fort Collins, Colorado 6421 Rookery Drive Dear Jay and Lisa, This letter serves as final certification for the above reference address according to the requirements of the Stormwater Utility in the Stonmwater Building Permit Notice for this address dated 03)20/200(1. This certification include the items noted on the Stormwater Building Permit Notice and are as follows: IF Grading certification • Lot comer elevation certification • Swale certification Lowest building opening elevation Finished floor elevation certification certification Final grading is substantially complete, functions properly and meets the intent of the origin[ subdivision grading and drainage design according to the Final Utility Plans for Fossil Lake P.U.D.; First Filing by Northern Engineering Services, Inc; Northern Project No: 9812.00 FLF; Director of Engmeering approval date 05/19/99. We have recommended to the owner, Chris Smith, via a phone conversation today and this letter that the three (3) window wells in the northwest corner of the building be raised by at least one timber (W' x 4") and the finished grade at time locations be brought up L. similar amount to increase the slope away from the house in this area. He agreed and indicated that he was intending to do this. King Surveying provided elevation shots. Elevations based on the some datum utilized with the Fossil lake P.U.D., First Filing. Attached is a copy of the site plan indicating the record field shots obtained for the lot. A copy of the portion of the Grading, Drainage and Erosion Control Plan from the subdivision utility plans, of Which this lot is a part, is attached for reference only. If you have any questions, Please call at (970) 221-4158 Sincerely, Northern Engineering Services, IncC35721 Mark Oberschmidt, P.E. CC Chris Smith 420 SOUTH HOWES. SUITE 202 / FORT COLLINS, COLORADO ROS21 1 970.221.4150 1 FAX 970.221.4159 Tuesday, February 11, 200310:43 AM C. Chris Smith (970) 377-0619 '2-23-02; 4: 47PK4; Non rHEANE NO ;9/022':4S9 DEC ZO 20112 Z:43PM KIRG SURVEYORS INC 9706965821 / 4 p.2 p.03 SITE CERTIFICATION NOTRHQUQtPDFOR ADDIt10NS AIdDItFMODfiLS Date. 1'21 6\ 0 Z Address: 4 Z 1 Poke,-, abl Let.. 11 Block: 10 Subdivision: 'r-o ss,\ 1. S1Cc P,4.0. 1 sit K',t i AS 4 The relative elevations at the above referenced address were measured at the lot sides and comers, top of foundation and other locations as needed. The sides, elevations and drainage patterns as measured are in substantial conformance with the approved drainage and final grading plan for Ste referenced subdivision. Tlie grading has bees construction as to facilitate the intent of the approved Drainage Plan for the subdivision. ❑ The lot grading does not conform to the approved grading plan: The attached revised grading plan reflects the eidstiog grading at this site and should be fiasclionally adequate for this lot and the overall subdivision drainage plan. IVul�ecaN F,SVy,rvicetlr�� SecQNce5 Zi1-g15ii ENWNMRUNG/ SURVEYM FIRM NAME — MWWB ` �Z.i.J iyyY� �T UI,Jt$ S\ , SU��4 Z1JZ. FaM ADDRESS f-'e"( Cu $(xSZ) MY STATE zs way' V >cc S C)6-, m\ OW FRWi NAMEOR $1Gai�R/SURYEYOR SMMTMOFEWAMERISuRVEYOR� DATE MCI i Tuesday, February 11, 200310:43 AM C. Chris Smith (970) 377-0619 :2-33-J2: t:.rPM:NGRTriERNtNG - :9702214-ea p.04 Sip �O g� 0i e xk u