CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2. Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
Top of foundation/finished floor
Finished grade on each side of the structure
Quarter points along each lot line (not more than 50 feet apart)
Break points/high points
Swales
Berms
Retaining walls
Air conditioning pads
Window wells
Any other appurtenance(s) within an easement
3. All elevations are within a 0.2 foot tolerance of the approved grading plan.
4. The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 25% (4:1).
7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8. All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
RA
RA
RA
RA
RA
RA
RA
RA
5/26/16 Page 2
9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10. The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11. Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping:
12. Final site cleanup has been completed.
13. I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions..
No Yes
No Yes
No Yes
No Yes
No Yes
14. Based on this information, I certify that (check one):
□ The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
□ The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
Email:
Phone:
Company:
Address:
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
PE Stamp
Sign and date
RA
RA
RA
RA
8-31-16
RA
1218 W. ASH, STE. A, WINDSOR, COLORADO 80550
TEL. 970.674.3300 – FAX 970.674.3303
August 31, 2016
Mr. Dan Mogen
City of Fort Collins
Stormwater Utilities
700 Wood Street
Fort Collins, Colorado 80522
RE: Tract M-7, Rigden Farm 6
th
Filing
Clarification of Lot Certification Items
Dear Dan,
Please accept this letter in support of items 3, 4, 5 and 7 of the Certification of Lot Grading dated
August 29, 2016 for which we have noted the items as not being in conformance with the checklist
description. As a result of this effort, we offer the following for your review and approval:
1. Item 3 – Several of the units were adjusted vertically during construction and therefore, are not
within 0.2 foot of the approved grading plan. However, all drainage concepts have been
maintained and the site grading and drainage is in general conformance to the design intent
reflected on the final plans.
2. Item 4 – There are several units in which the outside grade at the high point corners was placed
at or above the top of foundation. Pursuant to information provided by Kristin Candella with
Habitat for Humanity, the units were all flood proofed in these areas using interior rim band with
closed cell foam and the exterior has blue board with taped seams installed below grade and
continuing above grade. Therefore, we would accept this condition as being in general
conformance with the design intent which is to protect the structures from flooding and water
damage.
3. Item 5 – There are several locations where the grades are somewhat less than 5% away from the
structure; however, these generally are located in areas that do not have downspouts and not
prone to seeing significant drainage. Therefore, it is our opinion that the site grading is in
general conformance to the design intent reflected on the final plans.
4. Item 7 – The garage units were not designed to be 6 inches above the drainage swale in the drive
aisle. One area at the southeast corner of the site was deemed to be a potential drainage concern
and the concrete slab in front of the garage was removed and replaced to better direct runoff
away from the unit.
1218 W. ASH, STE. A, WINDSOR, COLORADO 80550
TEL. 970.674.3300 – FAX 970.674.3303
This letter is intended to supplement the Certification of Lot Grading and supports our belief that the
grading for the referenced project has been completed substantially in conformance with the
approved grading plan. We therefore request that the project listed above be deemed acceptable to
the City of Fort Collins.
If you should have any questions or comments, please contact me at 460-8487. Thank you for your
consideration.
Sincerely,
Robert Almirall, P.E.
Enclosure
cc: Mr. Mark Scott, Habitat for Humanity
Ms. Kristin Candella, Habitat for Humanity