OVERALL SITE and DRAINAGE CERTIFICATION
Commercial, Multi-Family and Subdivision Certification Form and Checklist
Project Name:
Date:
Building Permit Numbers:
(Commercial or multi-family)
Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in
all applicable items in this Certification Form for Commercial, Multi-Family and Overall Single Family sites.
NOTE: several items must be verified during construction. A copy of the approved grading plan must be
submitted with the as-built grading plan. (As-built elevations must be written in red next to the approved
elevations.)
• Use “Yes” for items completed as described.
• Use “N/A” for items that are not applicable to the site being certified.
• If any blanks are “No,” attach an explanation referencing the item number below.
Attach an explanation or description of the as-built condition for any items listed or for anything not listed but
shown on the approved construction plans.
Provide an as-built redline or Mylar drawing with the following:
I. Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10
For multiple detention basins on a site, provide the following for each basin separately:
A. Volume: As-built topographic verification is attached at 1-foot (or less) contour intervals and
volume verification calculations for the water quality capture volume and the 100-year detention storage
volume.
1. Detention basin topography was prepared by a professional land surveyor registered in the state
of Colorado.
2. Both proposed and as-built contours are shown on the same plan sheet (dashed lines for
proposed and solid lines for as-built).
3. All critical spot elevations as shown on the approved construction plans have been verified and
the as-built elevations are shown on the plan sheet.
4. Stage-storage-discharge tables are provided on a separate document.
5. Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92-
602(8) is attached and has been uploaded to the Statewide Compliance Portal
(tinyurl.com/COCompliancePortal) for approval. Uploaded documents must include:
a. The cover sheet from the approved drainage report
b. The stamped certification page from the approved drainage report
c. As-built topographic survey
d. Stamped certification page from the Overall Site & Drainage Certification
e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet
Aronson Family Dental
10/20/2016
B1601177
N/A
N/A
N/A
N/A
N/A
N/A
12/15 Page 2
B. Water Quality and Quantity Detention Basin Grading: Attached is as-built verification that there is
a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of
the detention pond. If there is a “soft pan” in the flow-line, all areas still must meet the minimum 2%
grade requirement.
1. Low Flow: Choose one of the following detention basin low flow options as applicable:
a. Turf swale for low flow path in detention basin.
There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as-built grade
is .
b. Concrete pan for low flow in detention basin.
There is a concrete pan installed that meets the grades as shown on the approved construction
plans. (Show as-built spot elevations.)
c. Soft pan for low flow in detention basin.
• Verify and document the soft pan material gradation, trench width and depth - to be verified
during construction by engineer. Picture documentation is preferred or engineer’s statement of
visual inspection and compliance. (Choose one below.)
o There is a soft pan with an underdrain installed that meets the design on the approved
construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations,
bends, cleanouts, etc.)
o There is soft pan installed without an underdrain but there is a type A or B soil. The soil
type must be documented by supplying verification from a registered professional geotechnical
engineer.
NOTE: Spot elevations are to be within 0.2 ft. +/-.
2. Side Slopes: The as-built side slopes of the detention basin have been calculated and are shown.
Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed
is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re-
graded. Provide documentation if a variance was granted for steeper slopes during the design process.
3. Spillway Certification: The following items must be field verified:
a. The location of the spillway is indicated on the as-built plan.
b. The width of the spillway is indicated on the as-built plan.
c. The elevation(s) of the spillway is shown on the as-built plan.
d. A concrete ribbon defines the location and grade of the spillway.
e. There is downstream scour protection in the spillway as per the construction plans. Indicate
type: (riprap size “D50” gradation and bedding type, geotextile, buried
riprap with inches of bury, etc.).
f. There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape
features, rocks, etc.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
12/15 Page 3
4. Outlet Structure Certification
a. The orifice plate for the approved release rate is installed with the correct size and location of
the orifice.
b. The orifice plate for the water quality outlet is installed with the correct hole size, number of
rows and columns of holes.
c. The bottom hole on both the water quality and quantity outlets are at the bottom of the plate
so no water ponds in front of the plate.
d. The well screen is the correct material and is installed as shown on the construction plans.
e. 100-year overflow grate elevation is . (Elev. A on detail D-46)
f. The top elevation of the water quality capture volume is . (Elev. B on detail
D-46)
g. Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the
top and bolted at the bottom.
h. The bottom of the outlet box has no obstructions or misalignments that will cause it to retain
runoff water and is sloped at 2% towards outlet.
II. Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4
A. Capacity: The as-built capacity of all the major channels and swales has been verified. They meet
or exceed capacity requirements shown in the approved drainage study for this project.
1. All swales are located within the drainage easements as shown on the construction plans.
2. Longitudinal slopes and side-slopes (cross-sections) have been verified. Design criteria requires
longitudinal slopes of 2% min. (on vegetated swales) and side-slopes no steeper than 4:1. If these
criteria are not met, the certification engineer will write a justification and propose mitigation for each
instance or have the issues corrected. If variances to these criteria have previously been approved and
are shown on the construction plans, no justification is needed.
3. As-built spot elevations on channels/swales are shown that correspond to spot elevations
shown on the approved construction plans.
4. All permanent erosion control measures are installed as shown on the approved construction
plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used
as part of this verification.)
5. All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the
system. (Pictures at tie-in points suggested.)
6. The minimum freeboard is provided for all channels and swales as shown on the approved
construction plans or as identified in the approved drainage study. (Show the freeboard provided on
the cross-sections as on the construction plan set or attached as separate documentation.)
7. The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees,
shrubs, sod, etc. infringe on the low flow portion of channels or swales.)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
12/15 Page 4
III. Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4
A. Storm Drain Pipe Capacity: The as-built capacity of all pipes installed on this project has been
verified and meets or exceeds the capacity requirements shown in the approved drainage study for this
project.
1. All storm drain pipe sizes and materials have been verified and are in conformance with the
approved construction plans. (Indicate on the plan and profile sheets that they have been verified.)
Material and size substitutions must be approved prior to installation. If a pipe size or material was
changed during construction, the certification engineer must attach the approval documents or supply
them with this certification. Approval documents must include a calculation documenting the capacity
equivalency (equal or greater) of the substituted size.
2. The longitudinal slope of the pipe is as shown on the approved construction plans. The
acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans
must be justified with capacity calculations on an attached sheet.
3. The as-built invert elevations have been verified and are shown on the plan and profile sheets of
the approved construction plans.
B. Storm Drain Pipe Installation Requirements: All pipes are installed in accordance with the
approved construction plans.
1. The minimum cover requirements for all pipes have been met as shown on the approved
construction plans. These will be called out in critical locations.
2. All encasements and clearances as specified on the approved construction plans have been met.
3. Any specific joint types or construction methods specified on the approved construction plans
have been met. (List on a separate sheet and attach to this certification.)
IV. Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4
A. Construction/Installation: All concrete pans have been constructed in accordance with the
approved construction plans.
1. The concrete pans are the correct size/width as shown on the approved construction plans.
2. The longitudinal slopes of the pans are as shown on the approved construction plans. The
certification engineer must justify or mitigate longitudinal slopes less than the minimum of 0.4% unless
a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or
justification by separate document.
3. The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross-
section is “V” shaped and meets the side slope shown on the detail.)
4. The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4
inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide
documentation of the reinforcement used if different than shown on the details or on the approved
construction plans.)
5. The spot elevations shown on the concrete pan(s) have been verified and are shown on the as-
built drawings.
Yes
Yes
Yes
N/A
Yes
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
12/15 Page 5
V. Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3
A. Construction/Installation: All storm drain inlets have been constructed in accordance with the
approved construction plans.
1. The size and type of inlets are consistent with the inlets shown on the approved construction
plan. Indicate by writing “Verified” on each inlet on the plan sheet or list on a separate document the
inlet number(s), type and size (length). If the inlet installed is other than the one on the approved
construction plan detail sheet, provide the name and source of the detail with justification for equal or
better capacity.
2. The size of the inlet opening is consistent with the approved detail. (Check height and width.)
3. The elevation of the grate (if applicable) is at the elevation shown on the street profile or as
indicated by a spot elevation on the construction plans.
4. The as-built invert elevations of all pipes entering and leaving the inlet are shown on the plan
and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide
justification and capacity calculations to show the capacity is not affected or propose mitigation.
5. The as-built size of the inlet box is as shown on the construction plans or an explanation or
justification is attached.
6. All inlet covers are stenciled or stamped with the following designation: NO DUMPING – DRAINS
TO POUDRE RIVER.
VI. Culverts - FCSCM Vol.2, Ch.9
A. Construction/Installation: All culverts have been constructed and/or installed in accordance with
the approved construction plans.
1. All culvert sizes have been verified as indicated on the as-built construction plans as correct.
2. The culvert material type for all culverts installed is as on the approved construction plans and is
indicated on the as-built plans.
3. The as-built invert “in and out” elevations have been verified and are indicated on the as-built
construction plans.
4. The culvert headwalls or wing walls have been installed as shown on the approved construction
plans. Headwalls or wing walls may be needed in the as-built conditions onsite if the slopes adjacent to
the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative.
An alternative to consider is a turf reinforcement mat (TRM).
VII. Sub-Drains
A. Construction/Installation: All sub-drains shown on the construction plans have been installed in
accordance with those plans. Sub-drains installed with the sanitary sewer are to be verified on the
sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub-drains installed
after the plans were approved on the as-built plans.)
1. The size of the sub-drains are as approved on the construction plans and are indicated on the as-
built plans.
2. The type of sub-drain, in particular the perforated and non-perforated sections of the drain, are
as indicated on the approved construction plans.
The confirmation of the items below are per Kevin Keen at Elder Construction.
United Civil only verified location of cleanouts at the surface.
Yes
Yes
Yes
Yes
Yes
Yes
N/A
N/A
N/A
N/A
N/A
N/A
Yes
Yes
Yes
12/15 Page 6
3. The cover requirements per the construction plans are provided.
4. The cleanouts have been installed at the locations shown on the construction plans and are
accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations
marked.)
5. The backfill materials for sub-drains are as shown on the approved construction plans. (This
includes the type, depth and width.)
6. The geo-textile liner completely wraps the sub-drain and the permeable backfill material unless
shown otherwise on the approved construction plans. (Sub-drain pipe wrapped in a sock filter material
is accepted only if approved prior to installation.)
VIII. Curb Cuts
A. Construction: All curb cut openings are constructed in accordance with the approved construction
plans.
1. The size (width) of the curb cut opening is as shown on the approved construction plans.
2. The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth
transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb
cut.
IX. Sidewalk Culverts & Chases
A. Construction/Installation: All sidewalk culverts have been installed at the locations shown on the
approved construction plans.
1. The size (width and length) of the culverts are as shown on the approved construction plans.
2. The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the
detail shown on the approved construction plans or per the City’s detail.
3. The sidewalk culvert invert “in and out” elevations have been verified and are indicated on the
as-built plans.
4. The sidewalk culvert opening is as shown on the approved construction plans or per the City’s
detail.
5. There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no
obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert.
X. Site Grading
A. Construction: All common open spaces have been graded in accordance with the approved
construction plans.
1. The grading on all common open spaces bordering private lots has been verified as correct and
the as-built rear lot corner elevations have been shown on the as-built plans.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
12/15 Page 7
2. The as-built contours for “overlot grading” are shown on the as-built construction plans for all
common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the
situation for noncompliance and when it may be corrected. An escrow for overlot grading may be
required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site
Certification. It is understood that residential lots will be brought to final grade once the foundation is
backfilled so they may be lower than the plan shows at this Overall Site Certification stage.)
3. All turf reinforcement mats (TRMs) have been installed as shown on the approved construction
plans and the slopes are stabilized.
XI. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3
A. Construction: All riprap has been installed in the locations and sizes indicated on the approved
construction plans.
XII. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7
A. Construction: All fabric has been installed in the locations and sizes indicated on the approved
construction plans.
1. All fabric was installed per the details on the approved construction plans.
XIII. Post-Construction Site Cleanup - FCSCM Vol.3, Ch.7
A. Construction: All construction debris and obstructions of any kind have been removed from
drainage paths.
1. All construction debris has been removed except in staging area(s).
2. All ruts have been smoothed out in all construction areas.
3. All areas needing reseeding have been identified and future stabilization goals have been
coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note
the area needing stabilization in the narrative.
XIV. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12
A. The construction of channel drop structures is in accordance with the approved plan both in
location, horizontal dimensions and cross-section.
XV. Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4
A. Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and
other items to be verified during construction, along with pictures and other required documentation.
N/A
N/A
Yes
N/A
N/A
N/A
N/A
Yes
Yes
Yes
Yes
12/15 Page 8
XVI. Certification and Erosion Control Measures
A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing
this certification there are any erosion control measures still remaining on the site, please note them in
the narrative and verify that they need to remain at this time. If in doubt as to the need for any control
measure, please consult with the Erosion Control Inspector at 970-221-6700.
XVII. Statement of Compliance
A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has
visited and observed the site, and to the best of his/her knowledge, the as-built conditions of the drainage
facilities are as described in the above form and in the enclosed as-built plans.
B. Failure to properly disclose all known information could result in the rejection of this certification and
prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates
of Occupancy within this development.
XVIII. Signature and Stamp by a Colorado-Registered Professional Engineer
Engineer’s contact information:
Name:
Email:
Phone:
Company:
Address:
PE Stamp
Sign and date
Sam Eliason
sam.eliason@unitedcivil.com
970-530-4044
United Civil Design Group
1501 Academy Ct. Ste 203
Fort Collins, CO 80524
10/20/16
12/15 Page 1
DURING CONSTRUCTION INSPECTION CHECKLIST
To be completed by Construction Superintendent
This checklist is to be completed during construction and included with the Overall Site and Drainage Certification.
• Use “Yes” for items completed as described.
• Use “N/A” for items that are not applicable to the site being certified.
• If any blanks are “No,” attach an explanation referencing the item number below.
I. Compaction
A. All berms and embankments meet the compaction requirements as specified in the project geotechnical report or comply with the
City’s standard, which is “soils should be compacted within a moisture content range of 2% below to 2% above optimum moisture content
and compacted to 95% of the Maximum Standard Proctor Density (ASTM D698).” Compaction requires verification during construction.
Provide testing log from contractor/engineer.
II. Storm Drain Pipe Installation Requirements
A. The pipe trenches have been compacted in accordance with Section 02225-3.07.A.1. of the Fort Collins Development Construction
Standards (e.g., the trenches in the roadways are to be 95% of maximum density and all other areas are to be at 90%, both in accordance
with ASTM D698).
III. Riprap - FCSCM Vol.1, Ch.7, Sec.4.4.4.3
A. The riprap bedding is a granular bedding of the gradation and thickness indicated on the approved construction plans.
B. A filter fabric was installed instead of granular bedding and is the material shown on the approved construction plans or was an
approved equal. Provide documentation for an approved equal.
C. The riprap is the gradation shown on the approved construction plans with a D50 of .
D. The riprap thickness is as shown on the approved construction plans and extends to the horizontal limits shown.
E. The riprap is buried to the depth indicated on the approved construction plans. (A minimum of 6 inches of soil is required.)
IV. Permanent Erosion Control Fabric - FCSCM Vol.1, Ch.7
A. All fabric was installed per manufacturer’s specifications.
V. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12
A. All cut-off walls have been installed in accordance with the approved construction plans. (Cut-off walls are required for irrigation
ditch crossings of storm drain pipes and at the end of flared end sections.)
12/15 Page 2
Permeable Interlocking Concrete Pavers
Item/Activity Yes No N/A Documentation/Submittal Requirements
Excavation
Post-excavation infiltration rates are consistent with design
infiltration capacity (for “full or partial infiltration” designs)
Impermeable Liner
Impermeable liner meets design specifications
Impermeable liner attached to concrete perimeter wall
Impermeable liner is not exposed
Any penetrations of the impermeable liner have been sealed
and checked for water-tightness.
Concrete Cut-Off Wall
Meets specifications for:
- Dimensions
- Reinforcement
- Footings
Underdrain System
Underdrain pipe is per design specifications
At least one cleanout is provided per underdrain lateral
Cleanout pipe is not perforated
Cleanout covers are installed and watertight
Underdrain is NOT wrapped in geotextile fabric
Underdrain orifice plate installed at outlet structure
Underdrain integrity tested after backfilling using TV and/or
water test
Aggregate
Base coarse (e.g., #2/4) has 90% fractured faces
Bedding coarse (e.g., #89) is thoroughly washed
Sub-base materials are installed and compacted according to
manufacturer’s specifications
Protection During Construction
PICP area is protected from construction site sediment,
including runoff from the upstream catchment and
construction equipment traffic
Close Out
Upstream catchment is stabilized prior to diverting runoff
into PICP system
12/15 Page 3
Bioretention Cells
Item/Activity Yes No N/A Documentation/Submittal Requirements
Excavation
Heavy equipment did not travel over bioretention cell during
excavation
Bottom of cell was “ripped” after excavation Photograph before/after “ripping”
Bottom of cell is flat and level Photograph
Excavated area is protected/surrounded by sediment/runoff
control BMPs during construction
Photograph
Inlet
Overflow inlet elevation is set above bioretention media per
plan (typically 12 inches)
Overflow inlet invert elevation is at least 3 inches below
containment wall/berm (to direct overflow into inlet)
Measure/record distance between inlet and top of
containment wall/berm
Upstream catchment drains to inlet
Forebay
Forebay is installed according to design specifications
Forebay has flat, concrete bottom
Outlet Structure/Overflow
Outlet structure/overflow elevation is confirmed Measure/record distance from overflow to top of media
filter
Impermeable Liner
Impermeable liner meets design specifications
Impermeable liner attached to concrete perimeter wall
Impermeable liner is not exposed
Underdrain System
Underdrain pipe is per design specifications
At least one cleanout is provided per underdrain lateral
Cleanout pipe is not perforated
Cleanout covers are installed and watertight
Underdrain is NOT wrapped in geotextile fabric
Underdrain orifice plate installed at outlet structure
Underdrain integrity tested after backfilling using TV and/or
water test
12/15 Page 4
Filter Media
Filter media composition is per design specifications
Filter media was “machine mixed” by supplier prior to delivery
Filter media installed flat and level
Other Structural Components
Containment wall/berm is continuous and level
Landscaping
Final landscaping does NOT include sod
Final landscaping (wood/rock mulch) is flat and level
Vegetation is planted according to landscape design
specifications
Verify that weed barrier is not installed
Temporary irrigation installed
Close Out
Upstream catchment stabilized prior to diverting runoff into
bioretention cell
Signature:
Name:
Title:
Email:
Phone:
Company:
Address:
Kevin Keen
Kevin Keen
Project Manager
kevink@elderconstructioninc.com
970-646-1329
Elder Construction INC.
7380 Greendale Rd.
Windsor, CO, 80550
5/26/16 Page 1
CERTIFICATION OF LOT GRADING
Pursuant to Fort Collins City Code § 26-544 & City Land Use Code § 3.3.2 (e)
Date:
Address:
Lot: Block:
Subdivision:
Permit Application #:
Larimer County Parcel #:
Larimer County Reception #:
(on development agreement)
I, (print) , a Colorado registered professional engineer, verify that construction
of all stormwater facilities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed “No,” attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1. Certification includes attached Stormwater-approved grading plan. (NOTE: City’s
Building Department does not approve grading plans).
2. Certification includes the attached as-built survey dated (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
Top of foundation/finished floor
Finished grade on each side of the structure
Quarter points along each lot line (not more than 50 feet apart)
Break points/high points
Swales
Berms
Retaining walls
Air conditioning pads
Window wells
Any other appurtenance(s) within an easement
3. All elevations are within a 0.2 foot tolerance of the approved grading plan.
4. The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 25% (4:1).
7. All flow lines of stormwater drainage swales are a minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Stormwater-approved grading plan.
8. All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
No Yes
x
x
x
Note: Revised grading plan shows locations where elevations are different.
x
x
x
There are some slopes steeper than 4:1's, flowline is between 1% and 2% per approved grading plan.
5/26/16 Page 2
9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10. The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11. Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping:
12. Final site cleanup has been completed.
13. I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions..
No Yes
No Yes
No Yes
No Yes
No Yes
14. Based on this information, I certify that (check one):
□ The elevations and drainage patterns of the lot/site are in substantial conformance with the City
approved drainage and grading plan for the property (information attached).
□ The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
Name:
Email:
Phone:
Company:
Address:
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEng@fcgov.com
Mailing Address
Fort Collins Utilities
ATTN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
PE Stamp
Sign and date
x
x
x
x
xx
See revised grading plans with clouds showing areas of revision.
✔
Samuel M. Eliason
sam.eliason@unitedcivil.com
970-530-4044
United Civil Design Group
1501 Academy Ct. Ste 203 and 204
Fort Collins, CO 80524
10/20/16
EAST BOARDWALK DRIVE
BUILDING CORNER
(OUTSIDE FACE)
N:1437037.40
E:3119739.01
BUILDING CORNER
(OUTSIDE FACE)
N:1437017.53
E:3119769.63
4'
6'
12'
5.5'
5'
5'
HANDICAP RAMP
(SEE STANDARD DETAIL)
5'
EXISTING 15" HDPE
PROPOSED
DOWN SPOUT (TYP.)
EXISTING 3
4" WATER SERVICE TO BE REMOVED
(CONTRACTOR TO VERIFY EXISTING LOCATION)
CONTRACTOR TO VERIFY IF
EXISTING CURB STOP AND METER
PIT ARE INSTALLED AT THIS
LOCATION BENEATH LANDSCAPING
AND REMOVE IF LOCATED.
CONNECT TO EXISTING 4" SANITARY SEWER
SERVICE WITH PROPOSED 4" SERVICE AT
2% MINIMUM SLOPE (CONTRACTOR TO
VERIFY EXISTING LOCATION).
BUILDING CORNER
(OUTSIDE FACE)
N:1437018.45
E:3119726.76
CONNECT TO BUILDING SERVICE
(SEE MECHANICAL PLANS)
FFE=5043.44
BUILDING CORNER
(OUTSIDE FACE)
N:1437073.13
E:3119747.18
TRACT 5
PROPERTY CORNER
N:1437074.23
E:3119726.27
TRACT 5
PROPERTY CORNER
N:1437074.29
E:3119755.84
PROMONTORY
PROPERTY CORNER
N:1437107.93
E:3119710.54
TRACT 5
PROPERTY CORNER
N:1437031.82
E:3119816.36
EAST BOARDWALK DRIVE
SIDEWALK TO MATCH
EXISTING TOP OF WALL
CONTRACTOR MAY UTILIZE
STRAW WATTLES IN LIEU
OF SILT FENCE
FFE=5043.44
FINISHED
FLOOR
0.5'
FINISHED GRADE
WIDTH ALONG BUILDING
VARIES
(4' - 4.75')
FINISHED GRADE ABOVE
EXISTING GAS LINE
1'
1.6'
4'
TYPICAL SECTION A-A
A
A
EXISTING GROUND
~ 4:1
~ 2:1
6' 6.4'
HIGH INTEGRITY DEVELOPMENT, LLC 10/17/2016
U15014
ARONSON FAMILY DENTAL
C3.00
7
GRADING, DRAINAGE & EROSION CONTROL PLAN
PREPARED FOR: DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
CAUTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
0 10' 20'
SCALE: 1" = 10'
0 5' 10' 20'
SCALE: 1" = 10'
5'
5
LEGEND
GRADING NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. SPOT ELEVATIONS SHOWN ARE TO FLOWLINE OR EDGE OF WALK UNLESS OTHERWISE NOTED.
3. ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS.
4. REFER TO THE ARCHITECTURAL PLANS FOR INTERNAL BUILDING GRADING. NOTE THAT THE FINISHED FLOOR ELEVATION
OF 5043.44 CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE ARCHITECTURAL PLANS.
PROPOSED SLOPE
PROPOSED SPOT ELEVATION
FF=FINISHED FLOOR
FG=FINISHED GRADE
FW=FLOODWAY
HP=HIGH POINT
LP=LOW POINT
TC=TOP OF CURB
TOW=TOP OF WALL
EXISTING GRADE
SILT FENCE
LIMITS OF DISTURBANCE
EXISTING CURB & GUTTER
EXISTING CONCRETE
EXISTING PROPERTY LINE
EXISTING FENCE
EXISTING GRAVEL
EXISTING PAVEMENT STRIPING
EXISTING WATER
EXISTING SANITARY
EXISTING OVERHEAD ELECTRIC
EXISTING CABLE TV
EXISTING ELECTRIC
PROPOSED GAS SERVICE
PROPOSED WATER SERVICE
PROPOSED SANITARY SERVICE
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CURB & GUTTER
PROPOSED BUILDING
EXISTING STORM SEWER
EXISTING GAS
EXISTING R.O.W LINE
EXISTING TELEPHONE
EXISTING BUILD-TO LINE
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING STORM SEWER
MANHOLE
EXISTING FIRE HYDRANT
EXISTING LIGHT POLE
EXISTING SANITARY SEWER
MANHOLE
PROPOSED STORM SEWER
1. REFER TO STANDARD EROSION AND SEDIMENT CONTROL NOTES SHOWN ON GENERAL NOTES SHEET C0.01.
2. THE SITE WILL BE LANDSCAPED TO FINAL STABILIZATION. SEE FINAL LANDSCAPE PLAN FOR DETAILS.
3. SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS
PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED
SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132.
4. ANY DIRT STOCKPILED ON THE SITE SHALL BE CONTAINED BY MEANS OF SILT FENCE, STRAW WATTLES, OR ROCK SOCKS
AROUND THE BASE OF STOCKPILE. ROCK SOCKS SHALL BE USED WHEN STOCKPILES ARE ON A PAVED SURFACE.
5. TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE
SITE SHALL BE SEEDED WITH 100% SMOOTH BROME AT A MINIMUM APPLICATION RATE OF 30 PLS/LBS/ACRE.
6. A VEHICLE TRACKING CONTROL PAD WILL BE REQUIRED IN AT LEAST ONE LOCATION FOR VEHICLES AND EQUIPMENT
TRACKING BETWEEN THE BUILDING AND PARKING LOT DURING CONSTRUCTION OF THE BUILDING.
7. A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED.
EROSION CONTROL NOTES
EXISTING SITE DISTANCE EASEMENT
PROPOSED FLOWLINE
3
30
2016
1 SME 9/16/2016 ASI #11: REVISED SITE & GRADING
3 SME 10/20/2016 AS-BUILTS FOR RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
2 SME 9/29/2016 ASI #13: REVISED ROOF DRAINAGE
TRACT 5
PROPERTY
CORNER
N:1436998.41
E:3119816.43
9'
(TYP.)
17'
(TYP.)
6.0LF 6" PVC
@ 2.00% MIN.
4" UNDERDRAIN
3.5' BELOW
FINISHED FLOOR
BUILDING CORNER
(OUTSIDE FACE)
N:1437045.41
E:3119729.30
BUILDING CORNER
(OUTSIDE FACE)
N:1437028.52
E:3119816.46
3 STEPS (SEE GRADING)
9.4'
14.2' 18'
4' R17.5'
R21.5'
R11.5'
1' SIDEWALK
CHASE
BUILDING CORNER
(OUTSIDE FACE)
N:1436998.63
E:3119757.42
EXISTING 15" HDPE
TRACT 5
PROPERTY CORNER
N:1436998.23
E:3119726.42
HANDICAP
RAMP
BUILDING CORNER
(OUTSIDE FACE)
N:1437000.78
E:3119798.30
PROPOSED 1" WATER SERVICE FROM A POINT
5' DOWNSTREAM OF THE METER TO THE BUILDING
CONTRACTOR TO INSTALL CURB STOP AND 3
4"
METER PIT AND METER. 3
4" SERVICE SHALL
BE EXTENDED 5' PAST METER PRIOR
TO UPSIZING TO A 1" SERVICE.
5'
HANDICAP RAMP SIGN
(SEE STANDARD DETAIL)
6' 6.4'
12 LF 6" PVC
CULVERT
6"X6" TEE
3.5'
3.5'
3.5'
4 STEPS
CONNECT TO DOWNSPOUT
W/MANUFACTURED FITTING
6" PVC
@1% MIN SLOPE
CONNECT
TO D.S.
;
DOWN SPOUT
ADDED
UNDERDRAIN
CLEANOUT (TYP.)
HIGH INTEGRITY DEVELOPMENT, LLC 10/17/2016
U15014
ARONSON FAMILY DENTAL
C2.00
7
HORIZONTAL CONTROL & UTILITY PLAN
PREPARED FOR: DATE SUBMITTED:
The engineer preparing these plans will not be responsible
for, or liable for, unauthorized changes to or uses of these
plans. All changes to the plans must be in writing and
must be approved by the preparer of these plans.
CAUTION
1501 Academy Ct.
Ste. 203
Fort Collins, CO 80524
(970) 530-4044
www.unitedcivil.com
Civil Engineering &
Consulting
0 10' 20'
SCALE: 1" = 10'
0 5' 10' 20'
SCALE: 1" = 10'
5'
4
LEGEND
NOTES
1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO
THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH
INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR
TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2. THE PROPOSED CONSTRUCTION WILL BE IN CLOSE PROXIMITY TO SEVERAL UNDERGROUND UTILITIES. THE
CONTRACTOR SHALL COORDINATE WITH ALL UTILITY PROVIDERS PRIOR TO AND DURING CONSTRUCTION TO MINIMIZE
SERVICE INTERRUPTIONS TO SURROUNDING BUILDINGS OR PROPERTIES.
3. THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE.
EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDING SHALL BE
COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS.
4. REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING.
5. WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT COLLINS AND ALL WATER AND SEWER CONSTRUCTION
SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION.
6. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'. MAXIMUM COVER SHALL BE 5.5'.
7. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS &
SERVICES.
8. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
9. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC.
10. 1" WATER SERVICES SHALL BE TYPE K COPPER.
11. THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS
ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY
COMPANY.
12. NOTE THAT THE FINISHED FLOOR ELEVATION OF 5043.44 CORRESPONDS TO ELEVATION 100'-0" AS SHOWN ON THE
ARCHITECTURAL PLANS.
13. INSERTA TEE
OR APPROVED EQUAL TO BE UTILIZED FOR CONNECTION BETWEEN EXISTING 15" HDPE AND PROPOSED
6" PVC PIPING.
LIMITS OF DISTURBANCE
EXISTING CURB & GUTTER
EXISTING CONCRETE
EXISTING PROPERTY LINE
EXISTING FENCE
EXISTING GRAVEL
EXISTING PAVEMENT STRIPING
EXISTING WATER
EXISTING SANITARY
EXISTING OVERHEAD ELECTRIC
EXISTING CABLE TV
EXISTING ELECTRIC
PROPOSED GAS SERVICE
PROPOSED WATER SERVICE
PROPOSED SANITARY SERVICE
PROPOSED CONCRETE
PAVEMENT OR SIDEWALK
PROPOSED CURB & GUTTER
PROPOSED BUILDING
EXISTING STORM SEWER
EXISTING GAS
EXISTING R.O.W LINE
EXISTING TELEPHONE
EXISTING BUILD-TO LINE
PROPOSED DOWNSPOUT
EXISTING STORM SEWER
MANHOLE
EXISTING FIRE HYDRANT
EXISTING LIGHT POLE
EXISTING SANITARY SEWER
MANHOLE
PROPOSED STORM SEWER
EXISTING SITE DISTANCE EASEMENT
3
30
2016
1 SME 5/11/2016 ASI #1: REVISED WATER SERVICE
2 SME 9/16/2016 ASI #11: REVISED SITE & GRADING
3 SME 9/29/2016 ASI #13: REVISED ROOF DRAINAGE
4 SME 10/20/2016 AS-BUILTS FOR RECORD DRAWING
THESE RECORD DRAWINGS, PRODUCED BY UNITED CIVIL DESIGN
GROUP LLC, ARE BASED ON FIELD INFORMATION GATHERED BY
OTHERS. UNITED CIVIL DESIGN GROUP LLC, ASSUMES NO LIABILITY
FOR THE ACCURACY OR COMPLETENESS OF THIS INFORMATION.
x
x
10/20/2016 Promontory
4027 Boardwalk Drive B1601177
Fort Collins, CO 80525 97362-64-005
Tract 5 2
Samuel M. Eliason
10/7/2016