HomeMy WebLinkAboutLot Certifications - 08/09/1995August 9, 1995
Mr. Basil Hamden
City of Fort Collins
Stormwater Utility
P.O. Box 580
235 Mathews
Fort Collins, CO 80522-0580
Re: Finished Floor Certification
Project No. 10-746-000
Dear Basil:
This letter is to certify the finished floor and window well elevations for lot 18,cEako[a-Ridge,
Rase Two: On August 8, 1955, we had a survey completed of said elevations and found that
those elevations are as follows: Finished floor elevation = 4920.80 and window well elevation
= 4919.36.
According to the approved Utility Drawings dated September 22, 1993, the minimum elevation
for the finished floor is 4916.50. As you can see, the built finished floor is above this minimum
elevation. We also surveyed the over flow drainage swale on the Northeast side of this lot and
determined that said swale was constructed per the grading, drainage and erosion control plan.
Therefore, we are requesting the release of the Certificate of Occupancy. We have attached a
portion of the Grading, Drainage and Erosion Control Plan for the said lot.
If we can answer any questions, please feel free to contact us at any time.
Respectfully,
t��t;9�uul83szaatt,,�
TST, INC. CONSULTING ENGINEERS
�ee,,�,�PpO•REGtS7
o�o�o,••e�ELso'
Donald N. Taranto P.E.
Os�� Off+
fps sS/ONA\
RAD/rj
TST, INC.
Consulting Engineers
748 Whalers Way - Building D
For(Collins, CO 80525
(303) 226-0557
Metro Denver (303) 595-9103
Fax (303) 226-0204
102 Inverness Terrace East
Suite 105
Englewood, CO 80112
(303) 792-0557
Fax (303) 792-9489
JR
Engineering, Ltd.
Denver Job Name 276 / /�) / CL7o- w C�E�-K ,Dl UC- /Job No. / d� Lon
Colorado Springs Subject Q� /� (� �d //� /�U�U• /—/�' /IIQ�
Engineering Source: (�T Telephone �Meeting Date cP-9;9,5-
Surveying With l) / E�iF G/
I3.-M . oa STi9,
37 2/,7!Z yP/6. 37
M. 43 a v ���2 �i9/ 7. 22
T,�3' Al Z 2 Z
Z2
im
AIA
• • •
.
Z Z O/917 2.
Signed
)itch
/rrigoljonl � � ,� I
itch Along I
'rvperly Lino .: I S
I . ..,
/.... 4 Diom.
Standard AW.. I II I
I w I d2
'o Be Rnmovoif
In/e
/
Standard
I I
1 I
'
'
A/.N. .10 �
� LINE 2D
T
yp�/
�6'
'" Inlet
1
Instal/ G' Diom.
FI LF.
Ae. R.C.P.
UNE Zf
Standard At.11.
I
I 2U L f.
_
_-
ij�'
162
240R
I —
6
L/lr.--
I
/nsta� 0' Diom
�-
LINE 2C
J1 L.F.
54, R.C.P
L/NF 2C r - L/NF 21
1211 L.F. �� — r JJt1 L.
54- R.C.P. J —A/N G — ,2 • M
Install G' Diom.
Standard AUI.. ,(� B
�.. r L/NF 2 / �i% v , RIM, Jo 200 L.F.
L.F. 95 42- R.C.P. A1.11. 15 1.21J Ac.
p� 111" R.0 Instal/ ✓' Diorri.
\ , 46 1 b Standard M.H.
\Inlet 20 ,
Instal/ 9' Standard 1 Inlet 29 — - —
\
Type A' /n/e l'P , \ Instal/ •9 Stando�•--
Type .Ir Inlet
\ 1 4F 150 _
t
\ 09 ,0.7cAc. //�// \ \ 130
too 1 �. /s Ac. \ \ 140
54" R.C.P. \
w/F.E.S
. 4919 1 \ I
I
�\ M7
\ 12�-
�,
13
146 \ \ �
143
95
Inlet 44 L� —
4, Install 1J' Standard t
Aypi o ` \ \` \ ro1r Inlet
50
\ LINE 64 17
166 L.F.
40" R.C.P. �` C
\ / F.E.S.
Install 4' Concroto O.DJ AC. '\\
(0�7
u 4.51' sic.
LINE rN ' LINO eA
JG L./. I 95 L.F.
42' R.C.P. 420 R.C.P.
19 1 20
Inlet 4l7
Install G' Standard
Typo !t" .Inlul t 21