HomeMy WebLinkAboutLot Certifications - 09/15/1995 (4)September 15, 1995
Mr. Basil Hamden
City of Fort Collins
Stormwater Utility Department
P.O. Box 580
235 Mathews Street
Fort Collins, CO 80522-0580
Re: Finished Floor Certification
Project No. 10-746-000
Dear Basil:
This letter is to certify the finished top of foundation and window well elevations for lot 8,
Dakota -Ridge —Phase Two. On September 13, 1995, we surveyed said elevation and found that
those elevations are as follows: Finished top of foundation elevation = 4921.10 and window
well elevation = 4919.67.
According to the approved Utility Drawings dated September 22, 1993, the minimum elevation
for the finished floor is 4916.50. As you can see, the built top of foundation is above this
minimum elevation. Also, at the time of our field investigation of said lot 8, we verified that
the drainage way improvements along the West property line and along the South portion of said
lot were constructed in the final overlot grading and drainage and have not been impacted as of
this date. These improvements were certified in a letter to you dated May 8, 1995. These
improvements were the sidewalk/overflow from Inlet 2C to the concrete low flow channel
running East-West along the South property line. At the time of this certification, there were
not any fences constructed on this lot. Therefore, we are requesting the release of the Certificate
of Occupancy. We have attached a portion of the Grading, Drainage and Erosion Control Plan
for the said lot.
If we can answer any questions, please feel free to contact us at any time.
Respectfully,
TST, INC. CONSULTING ENGINEERS
Sharlene A. Sh wen, P.E.
RAD/]g
TST INC. 748 Whalers Way - Building D t 102 Inverness Tefrace East
! Fort Collins, CO 80525 Suite 105
Consulting Engineers (303) 226-0557 Englewood, CO 80112
Metro Denver (303) 595-9103 (303) 792-0557
Fax (303) 226-0204 Fax (303) 792-9489
........... ..
I?O' DnPingge, �
. And
Iccessl Edsetme�t l
I I �
I
II ! jl
II ; tt
I� i II
Exist/ng Vrrigai-6
Ditch ,,qq/gng I
Prope: Line I ;
To Be, Remove
i II 1
I I If
I I +{ •
jl
v
� I r• I
I}� ?O' Oroinage,� I
Utility N{d I {
Access Eosepb
I
� II
I J,�
Ii
I
I � t
I I
I !
11 I i i i�l
I,
i
III
I III
Ii"li�tl
}i II
� I I I�I illi
i I I,I�II�
I
Instal/ Concrete
Combination
�— Bike Poth/Swo% I I I
See Deto// On
Sheet 5. I I
ICI I
4D ®I I
� ®INil
�I I
di
M.H. 18
Instal/ 6' Diam.
Standard M.H.
H 17 I
Instal/ 6' Diam
— Standard M.H. �f
UNE 2C
31 L.F.
LINE' 2C
54' R.C.P.
128 L.F.
54' R.C.P.
fF �ygZhiv
In/et 2C \
\ Instal/ 9' Standard
\ Type or In/e
\ 1 4F
\ a76 Ac.
\ 11
M.H. #14 \
—Instal 4' Diom.
\Standard M.H.
UNE ?B
•41 L.F.
48' R.C.P.
152
1
' Standard 94
Inlet
UNE JA
28 L.F.
- 24' R.C.P.
'MH f6 98
— Instal/ 6' Diom.
Standard M.H. LINE 24
UNE 3B 200 L.F.
8 L.F. 95
42' R.C.P. M
1, 18' R. S
/n/et ?B
\ Instal/ 9' SYondo `
T}pe 'R' Inlet
150
go \ \\
,4,E �►. \
\ \ 1.19 An \ / 140
4919
�\ T. 147 \'\9.
\ M8gig \ \
Inlet 44 L
�4•
(15P•) \ \` \ 5Pe 'R' Inlet
\ 15 \ \e'
UN£
180
54' R.C.P.
w/F:F S.