Loading...
HomeMy WebLinkAboutSite Certifications - 09/01/1994STEWART&ASSOCIATES Consulting Engineers and Surveyors September 1, 1994 Mr. Glen Schleuter Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Glen: ,I e i ► This is the certification for storm drainage facilities fortDakotaPines It is a small P.U.D. located between the new Fort Collins High_ School and Dakota Ridge. There were no storm drainage facilities such as drainage swales required on the plans designed by Parsons and Associates. We have done the construction staking for this project for Desyn Homes. All of the lots drain to the existing streets except for the rear of Lots 14, 15, 16, 17 and 18. All of the curb, gutter and asphalt, including cross pans have been completed. I have visually inspected the drainage patterns of the existing streets and did not observe any apparent problems. The rear of Lots 14, 15, 16, 17 and 18 drain Northerly into the existing detention pond on the Fort Collins High School property. The floor elevations of the existing houses on Lots 12 through 18 are at least 6.00 feet above the highwater line of the pond. If you have any questions regarding this certification, please call. Due to no drainage facilities there are no red lined "As Built" plans included. I have enclosed a xerox copy of the grading plan. Sincerely, CF�:f.G�.oa-'V (mil ..0 Richard A. Rutherford President enclosures /rsc 3s6 3 3S6 Y 3575- 5028* f�./ra- Ccrc�e /lar-h x Q� James H. Stewart 7°"" `�!a and Associates, Inc. 103 S. Meldrum Street a•�. �Pi� ��^' `�r`'�' P.O. Box 429 ✓d5` Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 100 YR. WS EL = 4923.0,., r, • 1 � 1 i'! I I I' I 0E7ErvT10N PovD L------------- -_--- -_-_ - - -: ---- -__---__-- / \` o 33 1 /LOT 18 F J Y / LOT 16 I• ` y LOT 17 FF=33.3 LOT 15 FF=33.4 FF=33.3 LOT 14 _ ' 1 3.1 �FF433.0' \ LOT1 1�