Loading...
HomeMy WebLinkAboutLot Certifications - 10/24/2016 (3)Date: 10212016 Address: 3026 Zephyr Road Fort Collins, CO 80528 Lot: 41 Block: 16 Subdivision: Kechter Farm Filing 1 Permit Application #: B1508271 Larimer County Parcel U: 8608421041 Larimer County Reception U: 20140024916 (on development agreement) I, (print) TititA JAnt€, 14AL m& a Colorado registered professional engineer, verify that construction of all stormwater facifities and grading is complete and hereby submit this certification. Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots. 1. Certification includes attached Stormwater-approved grading plan. (NOTE: City's No Yes4 Building Department does not approve grading plans). 2. Certification includes the attached as-built survey dated I, - to -iC. (must be within 60 days of the date the certification is submitted) accurately and truthfully depicting elevations for: • Top of foundation/finished floor • Finished grade on each side of the structure • Quarter points along each lot line (not more than 50 feet apart) • Break points/high points • Swales • Berms • Retaining walls • Air conditioning pads • Window wells • Any other appurtenance(s) within an easement 3. All elevations are within a 0.2 foot tolerance of the approved grading plan. 4. The top of foundation is at least 6 inches above the highest grade surrounding the structure. 5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet adjacent to the residence. 6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single family lots when the swale is draining the runoff from only two adjoining properties) and are not steeper than 25% (4:1). 7. All flow lines of stormwater drainage swales area minimum of 6 inches below the elevation of ground adjacent to the structure and will direct drainage as shown on the Sto rmwate r-a pp roved grading plan. 8. All downspout locations and discharge directions are shown on the as-built survey. Runoff is directed into an appropriate drainage system or lot line swale, and it is not directed onto neighboring properties. No Yes T4 No T.)9 Yes No Yes TW No Yes T3 No Yes T4 No _____Yes Ti4 5/26/16 Page 1 9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all adjacent properties. 10. The grading of this lot does not adversely affect neighboring properties or City infrastructure. 11. Landscaping has been completed prior to survey. If not, please indicate who will be responsible for completing landscaping: 7bt.Lt F,r.ev1 : 12. Final site cleanup has been completed. 13. I personally visited the site as part of the certification process, and in my professional opinion, the as-built survey is an accurate representation of the site conditions. No Yes No Yes -r.i No T4 Yes No 14 Yes No _____ Yes T4 14. Based on this information, I certify that (check one): E1 The elevations and drainage patterns of the lot/site are insubstantial conformance with the City approved drainage and grading plan for the property (information attached). The elevations and drainage patterns of the lot/site as measured are in general conformance with the City approved drainage plan with exceptions (information attached). In my professional judgment the elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the approved drainage plan. PE Stamp Sign and date Name: J• 1•. Email: Phone: 170. 4f Oft Company: .IR.. U.C.. Address: Zo S. 4-DAJr (L.J..aiJS, C...Q VXC NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other information necessary to confirm the above certification to: Email (preferred) WaterUtilitiesEngfcgov.com Mailing Address Fort Collins Utilities ATIN: Water Utilities Engineering 281 North College Avenue Fort Collins, CO 80521 Questions? 970-221-6700 F&fCoL1ins es 5/26/16 Page 2 7200 South Alton Way, Suite C400 Centennial, CO 80112 303-740-9393 x Fax 303-921-7320 3930 Sinton Road, Suite 219 Colorado Springs, CO 80907 719-593-2593 x Fax 303-921-7320 X 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 970-491-9888 x Fax 303-921-7320 MEMORANDUM To: City of Fort Collins, Bldg Dept. From: Tim Halopoff, PE Date: 10-24-2016 Subject: 3026 Zephyr Road, Lot 41, Blk 16 – Drainage Certificate Supplement Certification of Lot Grading - Supplement Item: 3. Not all elevations are within 0.2’ of the approved grading plans, but the drainage intent has been met without impacts to adjoining properties. 11. It is industry standard to certify the grades prior to landscape installation. The landscaping was not complete at time of survey. 12. The site was not at the stage of “final clean-up” at time of as-built survey for the drainage certificate. 41, This unofficial copy was downloaded on Dec-05-2014 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA