HomeMy WebLinkAboutLot Certifications - 10/24/2016 (3)Date: 10212016
Address: 3026 Zephyr Road
Fort Collins, CO 80528
Lot: 41 Block: 16
Subdivision: Kechter Farm Filing 1
Permit Application #: B1508271
Larimer County Parcel U: 8608421041
Larimer County Reception U: 20140024916
(on development agreement)
I, (print) TititA JAnt€, 14AL m& a Colorado registered professional engineer, verify that construction
of all stormwater facifities and grading is complete and hereby submit this certification.
Please answer the following questions by initialing the appropriate response. For each question initialed "No," attach an
explanation detailing how this will affect stormwater drainage for this lot and any adjacent lots.
1. Certification includes attached Stormwater-approved grading plan. (NOTE: City's No Yes4
Building Department does not approve grading plans).
2. Certification includes the attached as-built survey dated I, - to -iC. (must be within 60
days of the date the certification is submitted) accurately and truthfully depicting
elevations for:
• Top of foundation/finished floor
• Finished grade on each side of the structure
• Quarter points along each lot line (not more than 50 feet apart)
• Break points/high points
• Swales
• Berms
• Retaining walls
• Air conditioning pads
• Window wells
• Any other appurtenance(s) within an easement
3. All elevations are within a 0.2 foot tolerance of the approved grading plan.
4. The top of foundation is at least 6 inches above the highest grade surrounding the
structure.
5. There is a minimum grade of 5% away from the structure within the first 5 to 10 feet
adjacent to the residence.
6. All slopes meet or exceed the minimum requirement of 2% (1% is acceptable on single
family lots when the swale is draining the runoff from only two adjoining properties)
and are not steeper than 25% (4:1).
7. All flow lines of stormwater drainage swales area minimum of 6 inches below the
elevation of ground adjacent to the structure and will direct drainage as shown on the
Sto rmwate r-a pp roved grading plan.
8. All downspout locations and discharge directions are shown on the as-built survey.
Runoff is directed into an appropriate drainage system or lot line swale, and it is not
directed onto neighboring properties.
No Yes T4
No T.)9 Yes
No Yes TW
No Yes T3
No Yes T4
No _____Yes Ti4
5/26/16 Page 1
9. A smooth transition with no vertical offset (step) in grade is provided at the lot line to all
adjacent properties.
10. The grading of this lot does not adversely affect neighboring properties or City
infrastructure.
11. Landscaping has been completed prior to survey. If not, please indicate who will be
responsible for completing landscaping: 7bt.Lt F,r.ev1 :
12. Final site cleanup has been completed.
13. I personally visited the site as part of the certification process, and in my professional
opinion, the as-built survey is an accurate representation of the site conditions.
No Yes
No Yes -r.i
No T4 Yes
No 14 Yes
No _____ Yes T4
14. Based on this information, I certify that (check one):
E1 The elevations and drainage patterns of the lot/site are insubstantial conformance with the City
approved drainage and grading plan for the property (information attached).
The elevations and drainage patterns of the lot/site as measured are in general conformance with the
City approved drainage plan with exceptions (information attached). In my professional judgment the
elevations and grading of the lot/site as constructed are functionally adequate and equivalent to the
specifically approved drainage plan, and will affect stormwater drainage on and off the lot/site in a
manner consistent with the approved drainage plan.
PE Stamp
Sign and date
Name: J• 1•.
Email:
Phone: 170. 4f Oft
Company: .IR.. U.C..
Address: Zo S.
4-DAJr (L.J..aiJS, C...Q VXC
NOTE: A complete certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lot/site, including, but not limited to, drawings of the lot/site showing the approved design and as-built surveyed
elevations of all structures, drainage and grading features, written information/explanation of discrepancies, and other
information necessary to confirm the above certification to:
Email (preferred)
WaterUtilitiesEngfcgov.com
Mailing Address
Fort Collins Utilities
ATIN: Water Utilities Engineering
281 North College Avenue
Fort Collins, CO 80521
Questions?
970-221-6700
F&fCoL1ins
es
5/26/16 Page 2
7200 South Alton Way, Suite C400
Centennial, CO 80112
303-740-9393 x Fax 303-921-7320
3930 Sinton Road, Suite 219
Colorado Springs, CO 80907
719-593-2593 x Fax 303-921-7320
X 2900 South College Avenue, Suite 3D
Fort Collins, CO 80525
970-491-9888 x Fax 303-921-7320
MEMORANDUM
To: City of Fort Collins, Bldg Dept.
From: Tim Halopoff, PE
Date: 10-24-2016
Subject: 3026 Zephyr Road, Lot 41, Blk 16 – Drainage Certificate Supplement
Certification of Lot Grading - Supplement
Item:
3. Not all elevations are within 0.2’ of the approved grading plans, but the drainage intent has been met
without impacts to adjoining properties.
11. It is industry standard to certify the grades prior to landscape installation. The landscaping was not
complete at time of survey.
12. The site was not at the stage of “final clean-up” at time of as-built survey for the drainage certificate.
41,
This unofficial copy was downloaded on Dec-05-2014 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA