Loading...
HomeMy WebLinkAboutLot Certifications - 10/23/2015Lat�, 9 J to, 73tIc. t3, Cv-aCfS , FT c NORTHERN 1315os-334- ENGINEERING Drainage Memo Date: October 23, 2015 Project: 612 Pitkin Street Project No. 1199-001 Fort Collins, CO l Attn: Stormwater Staff City of Fort Collins Stormwater Utility 1 700 WoodStreet Fort Collins, CO 80521 Stormwater Staff: This letter serves to document the proposed drainage impacts of a new home proposed at 612 East Pitkin Street in Fort Collins, Colorado. Project Overview The project as currently envisioned proposes to completely remove an existing 2-story home located on the property and construct a new home as well as a carriage house that will be accessed from the alley on the north side of the property. - Existing Site The existing site functions as a "B" Lot, with drainage from the lot draining from the home out to the side lot lines, which then convey the drainage to both the front and back of the lot. Existing grades in the front yard range between 2%-4%, and grades in the back of the home vary between 1% and 2%. In addition to the existing home, the lot consists of a concrete driveway, concrete entry walk and concrete porches around the entire home. The remainder of the site is Kentucky Bluegrass lawn, with small. landscaping beds and mature trees. The total existing impervious area for the lot is 5,305 sf. Proposed Site The proposed site will continue to function as a 'B' Lot, with drainage from the new residence being directed to the side lot lines, and then to both the front and back of the lot via existing "swales" along the lot line. Existing grades outside of our improvements will remain unchanged, including along the east side of the property where no improvements are proposed. Modifications to the existing driveway and front entry walk are proposed with the new home, and a new carriage house is proposed at the alley that will have a small concrete apron at the entrance. The total proposed impervious area for the lot is 6,042 sf. This is an increase of 737 sf. The increase in runoff as a result of this will be negligible, and no adverse impacts to adjacent properties is anticipated. 301 N. Howes Street, Suite 100, Fort Collins, CO 80521 I 970.221.4158 I www.northernengineering.com t._ Detention Since the impervious area increases less than 1000 sf, no' detention is required for the site. . Water Quality 4 Water Quality for the site is being.provided by releasing concentrated flows from the roof into landscaped areas that allow stormwater runoff to infiltrate surround soils. Stormwater that is unable. to infiltrate is slowly passed through vegetated areas, further removing stormwater contaminates before stormwater leaves the property. An, exhibit has been provided to illustrate the existing and proposed impervious areas. Please feel free to contact us if you have any questions. Sincerely, Andrew Reese Project Engineering . io.z3.1 Nicholas W. Haws, PE, LEED AP Vice President / / 1 1 1 1 1 1 1 1 1 1 1 EAST PITKIN STREET VERO N' CURD S GUTTER / 1 / 1 / I / I I / I / 1 / 1 I 1 I 1 1 1 I L 1 1 1 \ // 11 / / / / / I I / I / 1 T l \ \ \ \ \ l ® NORTH IB 0 10 20 SO F.AI IN FEET ) m . 10 R. LEGEND: PROPOSED CONTOUR -91 BASTING COMONR ----:Ai�---- PROPERTY BOUNDARY r I PROPOSE. SPOT ELEVATION % I EYJBTINc sPOr ¢EVAnon i� PROPOSED SLOPES 2_Ox NOTES: 1. THE SZE. TYPE AND LOCATION OF ALL XNOWN IMOERGROUND UTILITIES ARE APPROALATE WIZEN SHOVEIW H ON THESE "WEDS. IT SL BE THE RESPDXSIdUT' OF ME CONTRACTOR TO VERIFY THE EXISTENCE BE AL UNCERGROUNDUBUTEESINTHEAREAOFMEWORK, BEFORECOMMENONG XEW CONSTRUCTION. THE CONTMCTORSIWLBE RESPONSIBLE FOR LOCATING ALL UXDERGR W NB URYDSB ME SHALL BE RESPONSIBLE FOR FOR Nl UNEROWN UNDERGROUND UTN7NE9. 2 REFERTO THE RAT FOR LOTAREINI TMCTSIMS. EASEMENTS. LOT DILFNSIONS, UMITV EASEMENTS, OTNER FASEAENT8 AM OMER SURVEY INFORMATION S THECONTRACTOR9HA-L,ATNLnMESOURINGANBAFIERSYSTEM LLp IXSTAATN, PREVEM MENUENT, DENNIS. AND DIRTFRG.I INN SOURCE FROM ENTERING ME PERMFAAE PAVEMENT SYSTEM LOOSE MATEWALS SIWL MT DE STDRED ON THE PERMFPBLE RAVEMENTAREA. MUD MI MINUENT.." RUHOFFSIIWLC BE NERT AWAY FRCA THE PAVEMENTAREA TEMPOEVI ONEATRUNOFFORINSTMLSMB NTC IRMMLLg1IRF NFSESSMLYTO REDUCE THE MOUNT OF SENHEM RUNAN TO THE PAVEMENT, SURFACE IH OTECTION COULD INCLUDE COVERING AREAS BE THE PAVEMENT, PROVIDING ALTERNATIVE CONSTRUCTOR V&ECIE ACCESS. AND PR(A DIINO EDUCATION TO ALL PARTIES WOIWNG W IR E A THE CONTRACTOR SHOULD CONSIDER RACING THE'hEARING CWRBQ AMR FINEG INOANDLANDSCARMOINApN TNi MCOLBLETE. IETE VIEWING COARSE BECOMES CLOGGED DUE TO CONSTRUCTION ACTNTEES. DUSAN THE SURFACE WRHA VACUUM M4CHINE M RESTORE THE INFLTMTION RATE AFTER CONSTRUCTON IS COMPLETE. 1 BFSEBIDRAVER98HALL6EFI MVEBYBORGEMMMUCTS. BEFAIAT LAVINGPA7 ERNSHALLBE4VHERRNCBONEOU HANUNCMSNLMOR SIXDIER COURSE ALONG THE ENTIRE PETOIETER CBNFNOI PAVER TYPE, AIL OR. AND PATTERN Y RK DINNER AND LMNSUFE MCKTECT PRIOR TO EURCHMES; B AL CUT PAVERS USED MAST BE AT LEAST ADY BE THEIR FALL UNCUT SUE. PROJECT BENCHMARKS: PROJECT DATUMHAVE SE CITY OF FORT COLLINS BENCH MINK WR SOUTNYBW CpiNER OF DMTMOUIH TRAIL AND LEMAY AVE. ON A DNERSIOX WALL ATTHEMTHURDITCM. ELEVATE. •.", BE CITY BE F.TCOLLIHE SENCHUMX I"T ON TNETIN SACK OF WµK UN THE WEST SOE OF STONER ST. AT ONE BRIDGE OVER THE ARTHUR BITCH. (NEAR THE STONES AND BMENCUTH INTERSECTONL. ELEYAn. • AM TE W 1 MILn NOTIRCAnpN CENTER BF COLORABD is KmwwfiBESbel0W. B Call Before You 114. City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROmm CUT mBIA... SAW CHECKED BY. BAIe A rA�L-HA r T-' D t. CHECKED BY, swLmw"er NULY D.. CHECKED BY. D.D.a CHECKED BY-. TTHNN, AAw D i. CHECKED By; -En'TF^vmAnE� PL°^u Oele